| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹3.5 L+₹41,922.07 (13.6%)Rejected-AOC | L2 | Rejected-AOC FIST LOWEST | |
| 3 | L3₹4.2 L+₹1.1 L (35.1%)Rejected-AOC | L3 | Rejected-AOC SECOND LOWEST |
Tender Value
₹3.2 L
EMD Value
₹8,000
Closing Date
15 Feb 2024, 5:00 pmClosed
Assistant Executive Engineer
Sewerage Sub Division (North), Kerala Water Authority,Pattoor. Thiruvananthapuram 695024 Ph. 04712303170
and Painting of Office Building-Sewerage WorkSasthamangalam Rennovation of Office Building Repairing and Painting of Office Building Sewerage Work
2024_KWA_656369_1
WRD/KWA-CE(SR)/TR/334/2024_27
Open Tender
Civil Works - Others
Item Rate
180 days
works
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹8,000
15 May 2024
9 Feb 2024
16 Feb 2024
9 Feb 2024
15 Feb 2024
9 Feb 2024
Amount
Working Charges
14.1.2:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:Cement mortar 1:4 ( 1 cement: 4 coarse sand)
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured)
13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.80:Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
14.67.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:Old work ( Two or more coats applied @ 1.43 ltr/10 sqm) over existing cement paint surface
14.53.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work
13.50.1:Applying priming coat:With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood)
13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
14.60:Re- lettering with black japan paint of approved brand and manufacture.
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
14.6.2:Renewing glass panes, with wooden fillets wherever necessary:Float glass panes of thickness 5.5 mm
100.98.1008:Engaging Coolie.
D S RAJESHKUMAR
SAJEEVKUMAR
Bidder Name
SAJEEVKUMAR
D S RAJESHKUMAR
RENJITH B
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1013533.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .