Tender Value
₹2.3 Cr
EMD Value
₹13.7 L
Closing Date
26 Sept 2026, 12:00 pm4d left
Shri Praveen Kumar
Office of the SE, Varanasi Circle, PWD, Varanasi
Janpad Chandauli me Gramsabha Kharid me Indrapurva Gav ke Samane Chandraprabha Nadi me Laghu Setu ka Nirman Karya
2026_CEUVZ_1187605_3
SE Ref. No 4297/183com-va-vritt/26-27 Dt. 10.09.2026
Open Tender
Civil Works - Bridges
Fixed-rate
180 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹13.7 L
Yes
Varanasi
19 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 4,281.6 | Cum | 69 | ₹2,95,430.4 |
| 2 | Providing, laying and spreading Material (GSB) on a prepaired sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfinedcompressive strength and to form a layer of sub-base. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 185.51 | Cum | 2,433 | ₹4,51,345.83 |
| 3 | Providing, laying and spreading Material on a prepaired sub base, adding cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.(cement WBM grading III) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 255.79 | Cum | 2,903 | ₹7,42,558.37 |
| 4 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,737.5 | Sqm | 23.9 | ₹41,526.25 |
| 5 | Providing Laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm & 11.2 mm aggregate either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base. Including mixing in a suitable plant or mixol laying and rolling with a three wheels 80-100 KN static roller capacity, finished to required level and grade. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,737.5 | Sqm | 211.5 | ₹3,67,481.25 |
| 6 | Providing and laying of seal coat sealing the voids in a bituminious surface laid to specification to the specified levels,using crushed stone chipping 6.7 mm size and penetration bitumen grade V.G.-10 as per techinical Specification Clause 510. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,737.5 | Sqm | 80.5 | ₹1,39,868.75 |
| 7 | Construction of Earthen Shoulder with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 192.19 | Cum | 59 | ₹11,339.21 |
| 8 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 480 | Sqm | 3.4 | ₹1,632 |
| 9 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,019.4 | Cum | 19.2 | ₹19,572.48 |
| 10 | Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 110.88 | Cum | 6,020 | ₹6,67,497.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 0.70 MB
BOQ_2236320.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .