| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.7 Cr+₹7.0 L (4.16%)Rejected-AOC B 134 GANESH MURTHI NAGAR PART III COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | ₹1.7 Cr+₹7.0 L (4.16%) | L2 | Rejected-AOC Not Being L1 |
| 3 | L3₹1.8 Cr+₹9.3 L (5.53%)Rejected-AOC | ₹1.8 Cr+₹9.3 L (5.53%) | L3 | Rejected-AOC Not Being L1 |
| 4 | L4₹1.8 Cr+₹13.0 L (7.79%)Rejected-AOC FLAT NO B 401 4TH FLOOR NAVADURGA CO OP HSG SOCIETY LTD PLOT NO 7 SECTOR 19A NERUR EAST NAVI MUMBAI THANE MAHARASHTRA 400 706 | NAVI MUMBAI | THANE | MAHARASHTRA | 400706 | ₹1.8 Cr+₹13.0 L (7.79%) | L4 | Rejected-AOC Not Being L1 |
| 5 | L5₹1.8 Cr+₹17.4 L (10.4%)Rejected-AOC | ₹1.8 Cr+₹17.4 L (10.4%) | L5 | Rejected-AOC Not Being L1 |
| Sl No | Description | Qty | Unit | Nilesh Construction L6 | Vipin Kumar and Brother L1 | Dwarka Pershad Radhey Ramanlal L8 | SHRI SAI ENTERPRISES L2 | M/s RAMA LAKSHMI CONSTRUCTIONS L7 | Sri Associates L5 | M/s Amit Associates L3 | ROHIT CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| .50BOQ Dated May 2026 | |||||||||||
| .60SCHEDULE 'A' PART - I (B/R & Internal services) | |||||||||||
| 1.00 | Taking down chowkats or frames with shutters exc 1.5 sqm but n.exc 4 sqm each (without taking off shutters from the frame) complete all as specified and as directed. | 194 | Each | 225 ₹43,650 | 150 ₹29,100 | 150 ₹29,100 | 130 ₹25,220 | 150 ₹29,100 | 90 ₹17,460 | 150 ₹29,100 | 80 ₹15,520 Lowest |
| 2.00 | Taking down chowkats or frames with shutters n exc 1.5 sqm each of any description (without taking off shutters from the frame) complete all as specified and as directed. | 82 | Each | 185 ₹15,170 | 150 ₹12,300 | 150 ₹12,300 | 70 ₹5,740 Lowest | 132 ₹10,824 | 90 ₹7,380 | 150 ₹12,300 | 80 ₹6,560 |
| 3.00 | Demolition of Brickwork or stone/boulder masonry, laid dry complete all as specified and as directed. | 3.5 | Cubic Metre | 470 ₹1,645 | 250 ₹875 Lowest | 350 ₹1,225 | 600 ₹2,100 | 350 ₹1,225 | 450 ₹1,575 | 350 ₹1,225 | 500 ₹1,750 |
| 4.00 | Demolition of Cement concrete (unreinforced) of any description and in any position on roofs including removal of debris out side of MOD land complete all as specified and as directed. | 46 | Cubic Metre | 950 ₹43,700 | 450 ₹20,700 | 500 ₹23,000 | 1,050 ₹48,300 | 600 ₹27,600 | 450 ₹20,700 | 200 ₹9,200 Lowest | 800 ₹36,800 |
| 5.00 | Taking down cement or cement lime plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc including removal of debris out side of MOD land complete all as specified and as directed. | 487 | Square metre | 80 ₹38,960 | 25 ₹12,175 | 70 ₹34,090 | 60 ₹29,220 | 50 ₹24,350 | 36 ₹17,532 | 50 ₹24,350 | 20 ₹9,740 Lowest |
| 6.00 | Demolition of reinforced cement concrete of any description , any grade and in any position including reinforcement cut as required to facilitate demolition as in water tanks including base beams, shelves, platforms etc. complete all as specified and as directed. | 1 | Cubic Metre | 950 ₹950 | 400 ₹400 Lowest | 500 ₹500 | 1,300 ₹1,300 | 800 ₹800 | 450 ₹450 | 600 ₹600 | 1,500 ₹1,500 |
| 7.00 | Taking down existing tar felt, water proofing membrane etc of any description, any type including loose plastering / screed , padding concrete etc if any and removing all loose particles with wire brushes, removing bitumen coating over original RCC slab by grinding, picking, grinding of mother concrete slab to make surface smooth suitable for applying waterproofing treatment as per manufacturer's instructions,including removal of debries out side of MOD land complete all as specified and as directed. | 466 | Square metre | 28 ₹13,048 | 25 ₹11,650 | 70 ₹32,620 | 20 ₹9,320 Lowest | 50 ₹23,300 | 45 ₹20,970 | 50 ₹23,300 | 20 ₹9,320 Lowest |
| 8.00 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc laid, bedded and pointed in any mortar complete all as specified and as directed. | 77.42 | Per 10 Square Metre | 580 ₹44,903.6 | 200 ₹15,484 Lowest | 700 ₹54,194 | 550 ₹42,581 | 400 ₹30,968 | 450 ₹34,839 | 500 ₹38,710 | 330 ₹25,548.6 |
Tender Value
₹1.9 Cr
EMD Value
₹2.6 L
Closing Date
26 May 2026, 6:00 pmClosed
Chief Engineer AF Bangalore
Chief Engineer AF Bangalore No. 2 DC Area MES Road Yeshwantpur Post Bangalore 560022
SPECIAL REPAIR TO BLDG NO P-114 AND P-355 (B) AT AFA HYDERABAD
2026_MES_762592_1
801707/AF/E8
Open Tender
Civil Works
Item Rate
365 days
GE(AFA)HYDERABAD
AS PER NIT
8 documents required · 8 mandatory
₹2,000
GE(AFA)HYDERABAD
₹2.6 L
Yes
1 Jul 2026
28 Apr 2026
2 Jun 2026
28 Apr 2026
26 May 2026
19 May 2026
29 Apr 2026 - 8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.5 | SCHEDULE 'A' PART - I (B/R & Internal services) | - | - | - | - |
| 1 | Taking down chowkats or frames with shutters exc 1.5 sqm but n.exc 4 sqm each (without taking off shutters from the frame) complete all as specified and as directed. | 194 | Each | - | - |
| 2 | Taking down chowkats or frames with shutters n exc 1.5 sqm each of any description (without taking off shutters from the frame) complete all as specified and as directed. | 82 | Each | - | - |
| 3 | Demolition of Brickwork or stone/boulder masonry, laid dry complete all as specified and as directed. | 3.5 | Cubic Metre | - | - |
| 4 | Demolition of Cement concrete (unreinforced) of any description and in any position on roofs including removal of debries out side of MOD Land . complete all as specified and as directed. | 46 | Cubic Metre | - | - |
| 5 | Taking down cement or cement lime plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc including removal of debries out side of MOD Land . complete all as specified and as directed. | 487 | Square metre | - | - |
| 6 | Demolition of reinforced cement concrete of any description , any grade and in any position including reinforcement cut as required to facilitate demolition as in water tanks including base beams, shelves, platforms etc. complete all as specified and as directed. | 1 | Cubic Metre | - | - |
| 7 | Taking down existing tar felt, water proofing membrane etc of any description, any type including loose plastering / screed , padding concrete etc if any and removing all loose particles with wire brushes, removing bitumen coating over original RCC slab by grinding, picking, grinding of mother concrete slab to make surface smooth suitable for applying waterproofing treatment as per manufacturer's instructions,including removal of debries out side of MOD Land . complete all as specified and as directed. | 466 | Square metre | - | - |
| 8 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc laid, bedded and pointed in any mortar complete all as specified and as directed. | 77.42 | Per 10 Square Metre | - | - |
| 9 | Dismantling wrought iron or mild steel work of any description not otherwise provided complete all as specified and as directed. | 7 | Quintal | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
801707TENDER.pdf
Tender Documents • 2.07 MB
BOQ_854216.xls
BOQ • 0.41 MB
801707Corrigendum01.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .