Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC HIMACHAL PRADESH HP | L1 | Accepted-AOC quoted rate at lower sides. | |
| 2 | L2₹1.9 L+₹12,707 (7.05%)Rejected-Finance NIL | L2 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. | |
| 3 | L3₹1.9 L+₹12,743 (7.07%)Rejected-Finance HIMACHAL PRADESH HP | L3 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
Tender Value
₹1.8 L
EMD Value
₹4,575
Closing Date
31 Oct 2026, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SR. XEN
ED RECKONG PEO
Tender for strengthening of existing LT line from 22/0.4KV, 250KVA Tangling by providing addional poles, resagging of loose span, re-erection of stay set etc. in Electrical Setion Shongthong under Electrical Sub Division, HPSEBL, Reckong Peo.
2026_HPSEB_146545_1
RPO/ED/DB-11/2026-27/21
Open Tender
Supply and Erection
Percentage
30 days
SHONGTHONG
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹4,575
7 Nov 2026
24 Oct 2026
2 Nov 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalement Charges of LT line. | - | - | - | - |
| 2 | Dismentalement charges of ST poles 8/9Mtr. (with complete accessories.) | 6 | Each | 826 | ₹4,956 |
| 3 | De-sagging of ACSR conductor 6/1/2.59mm. (Removal of conductor & De stringing only) | 8.22 | P/Km | 4,956 | ₹40,738.32 |
| 4 | ERRECTION OF L.T LINE ON 8/9Mtr. Long S.T pole. | - | - | - | - |
| 5 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles. Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). | 8 | Each | 3,772.46 | ₹30,179.68 |
| 6 | ERRECTION OF STAY SET | - | - | - | - |
| 7 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. | 5 | P/Set | 1,998.92 | ₹9,994.6 |
| 8 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). | - | - | - | - |
| 9 | Laying of conductor, stringing & sagging, Binding with insulator (only). | 8.22 | P/Km | 8,904.28 | ₹73,193.18 |
| 10 | Manual Carriage of material considering average distance from road to site of work 1.000 KM | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.00 MB
BOQ_218489.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .