Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹14,600
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer (Civil), Construction Division, Gujarat Maritime Board, V C Fatak, Morbi
Raising of compound wall in work shop area Navlakhi
303216
04/2026-27
Open
Civil Works - Others
Works
Morbi
11 documents required · 11 mandatory
₹1,062
Executive Engineer (Civil), Construction Division, Gujarat Maritime Board, V C Fatak, Morbi - 363641
₹14,600
11 May 2026
11 May 2026
11 May 2026
25 May 2026
11 May 2026
BILL OF QUANTITIES
Sign of Contractor Executive Engineer ( C )
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis forbidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities,
where applicable, and otherwise at such rates and prices as the Engineer may fix within
the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
mentioned in this contract.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling for
its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
Sign of Contractor Executive Engineer ( C )
BILL OF QUANTITIES
Name of work: Raising of compound wall work shop area Navlakhi.
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Description of Item (with brief
specification and reference to Quantity Unit Amount
book of specifications)
Excavation for foundation upto
1.5m depth including sorting out
and stacking of useful materials
1 and disposing of the excavated 33.06 cum 210.10
stuff upto 50 metre lead.
(A) Loose or soft soil
Demolition of RCC work including
stacking of serviceable materials
2 and disposal of unserviceable 297.00 #REF! 1398.10
materials with all lead and lift.(
using pneumatic breaker)
Demolition of brick work and
stone masonary including stacking
of serviceable materials and
disposal of unserviceable
materials with all lead and lift.
( i i ) In cement mortar
Supplying & stacking river silt or
4 good earth of approved quality at 4.56 cum 203.00
Providing and Laying RCC 1:2:4 (1
cement :2 coarse sand : 4 crushed
stone aggregate 20mm nominal
size) and curing complete
5 excluding the cost of 33.00 cum 6231.30
reinforcement but including cost
of form work in.
coping/foundation/plinth beams
Brick work using common burnt
clay building bricks having
crushing strength not less than
kg/sq.cm. in foundation and plinth
in C.M.1:6 (1cement:6 fine sand)
conventional bricks
20mm cement plaster in two coats
with underlayer 12mm in C M 1:3
(1 cement : 3 coarse sand) and top
layer 8mm in C M 1:3 (1 cement :
coarse sand) finish rough with
sponge and curing etc.( For
exterior plastering upto 10m
height above G L)
Providing and Layig interlocking
cement concrete paver blocks
Sign of Contractor Executive Engineer ( C )
120mm thick of M55 grade of
approved make and shape
including leveling the base with
50mm thick sand bedding, laying
the paver blocks in pattern as
directed by the EIC, filling the
joints with sand including
watering, rolling and compacting
with appropriate tools and plants,
all conveyance including loading,
unloading of blocks etc.complete
in all respect.
Supplying, bending, hooking and
binding thermomechanically
treated (TMT) corrosion resistant
Fe-415 grade bar reinforcement
including placing in position etc.
complete upto floor two level.
I/We am/are willing to carry out the work at… .................. %above/below percent (Should
Be written in figures and words) of the estimated rate mentioned above. Amount of my / our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rulesi.e.1%oftheworkdone.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/CDate:11/05/2017as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
At the rate of input rate mentioned in all the tender.
Sign of Contractor Executive Engineer ( C )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical Bid.pdf
Schedule B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .