| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance | L1 | Accepted-Finance Qualified | |
| 2 | L2₹7.2 L+₹14,643.79 (2.06%)Rejected-Finance | L2 | Rejected-Finance Disqualified | |
| 3 | L3₹7.5 L+₹43,310.52 (6.10%)Rejected-Finance | L3 | Rejected-Finance disqualified |
| Sl No | Description | Qty | Unit | MANOHARAN AND CO L3 | RENGASAMY PANDIYAN L1 | PK AND SONS GENERAL CONTRACT WORKS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Maintenance of Rural Roads-Pot Holes from Thiruppanjeeli to Theerampalayam road(R 95)Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,008 | Cum | 6.5 ₹6,552 | 6.3 ₹6,350.4 Lowest | 7 ₹7,056 |
| 2.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal in etc., | 1.67 | Cum | 4,750 ₹7,932.5 | 4,613.1 ₹7,703.88 Lowest | 4,705.36 ₹7,857.95 |
| 3.00 | KM 1/0 - 2/0 | 3.41 | Cum | 4,750 ₹16,197.5 | 4,613.1 ₹15,730.67 Lowest | 4,705.36 ₹16,045.28 |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal in etc., | 1.26 | Cum | 4,750 ₹5,985 Lowest | 5,003.4 ₹6,304.28 | 5,103.47 ₹6,430.37 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 4.48 | Cum | 2,900 ₹12,992 | 2,737.1 ₹12,262.21 Lowest | 2,791.84 ₹12,507.44 |
| 6.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 44.75 | Sqm | 85 ₹3,803.75 Lowest | 86.2 ₹3,857.45 | 87.92 ₹3,934.42 |
| 7.00 | Applying TACK COAT over WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 44.75 | Sqm | 25 ₹1,118.75 | 20.1 ₹899.48 Lowest | 20.5 ₹917.38 |
| 8.00 | Applying TACK COAT over WBM surface at 3.00Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 464.63 | Sqm | 25 ₹11,615.75 Lowest | 34.1 ₹15,843.88 | 34.78 ₹16,159.83 |
| 9.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 401.93 | sqm | 340 ₹1,36,656.2 | 326.5 ₹1,31,230.15 Lowest | 333.03 ₹1,33,854.75 |
| 10.00 | KM 1/0 -1/40 | 259.45 | sqm | 340 ₹88,213 | 326.5 ₹84,710.43 Lowest | 333.03 ₹86,404.63 |
Tender Value
₹7.2 L
EMD Value
₹8,000
Closing Date
5 Nov 2025, 4:00 pmClosed
BDO (BP)
Mannachanallur Panchayat Union
Maintenance of Rural Roads-Pot Holes from Thiruppanjeeli to Theerampalayam road(R 95) 2.Maintenance of Rural Roads-Pot Holes from Valmalpalayam -Neyveli (Via) Mangammal Salai Road 0/0-2/900 (R 102) Rural Roads in Mannachanallur Block of Tiruchirapp
2025_RDTN_618087_1
A2/3850/2025 23.10.2025 Package no 2
Open Tender
Civil Works - Roads
Item Rate
Mannachanallur Panchayat Union
Maintenance of Rural Roads-Pot Holes from Thiruppanjeeli to Theerampalayam road(R 95) 2.Maintenance of Rural Roads-Pot Holes from Valmalpalayam -Neyveli (Via) Mangammal Salai Road 0/0-2/900 (R 102) Rural Roads in Mannachanallur Block of Tiruchirapp
5 documents required · 5 mandatory
₹0
₹8,000
Yes
Mannachanallur Panchayat Union
5 Nov 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
NIT.pdf
Tender Documents • 0.09 MB
Pricebid.pdf
Additional Documents • 0.70 MB
Techbid.pdf
Additional Documents • 0.92 MB
BOQ_738765.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .