Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | -57.65% | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹51,312.79 (24.7%)Admitted-Finance | -47.20% | ₹2.6 L+₹51,312.79 (24.7%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 L+₹59,660.32 (28.7%)Admitted-Finance | -45.50% | ₹2.7 L+₹59,660.32 (28.7%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 L+₹1.2 L (58.2%)Admitted-Finance | -33.00% | ₹3.3 L+₹1.2 L (58.2%) | L4 | Admitted-Finance |
| 5 | L5₹3.4 L+₹1.3 L (62.7%)Admitted-Finance | -31.10% | ₹3.4 L+₹1.3 L (62.7%) | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
2 Feb 2026, 9:00 amClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please refer BOQ
2026_RDPR_301018_1
e-NIT No. 250 REW Rajouri of 2025 Dated 20-01-2026
Open Tender
Civil Works
Percentage
90 days
RAJOURI
Please refer NIT
2 documents required · 2 mandatory
₹500
Executive Engineer REW Rajouri
₹10,000
Yes
4 Feb 2026
21 Jan 2026
2 Feb 2026
21 Jan 2026
2 Feb 2026
21 Jan 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) in exceeding 10 sqm on plan, in 80% AKS and 20% OR directed
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed
Providing and laying position cement concrete M5 grade with 40mm including curing but excluding the cost of centering and shuttering all work upto plinth level.
Providing and laying position cement concrete M10 grade with 20mm including curing but excluding the cost of centering and shuttering all work upto plinth level.
20 % Boulder in PCC
Providing and laying 1.00 m dia hume pipe including supplying ,carriage handling ,rehandling, cutting ,filling and cost of pipes all complete.
Centering and shuttering including strutting, propping etc. and removal of form work . Foundations, footings, bases of columns etc. for mass
Carriage of Sand /Aggragates by 20 km MT and 400 m by HL av
Carriages Of Cement 10Km MT
Installation of CIB
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_976633.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .