Loading…
Loading…
Tender Value
₹5.7 L
EMD Value
₹14,500
Closing Date
14 May 2026, 3:00 pmClosed
T.K. Jithesh, Executive Engineer
PH Division, Sulthan Bathery
DEPOSIT-TDO 2025-26- Mini WSS to rehabilitated ST families in Porunnanoor Village- Deepening of existing well in Paliyana in vellamuna GP- General Civil work
2026_KWA_849142_1
WRD/KWA-CE(NR)/TR03/6571/2025
Open Tender
Civil Works - Water Works
Item Rate
Paliyana in Vellamunda
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,500
Yes
₹14,500
Yes
30 Apr 2026
30 Apr 2026
15 May 2026
30 Apr 2026
14 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Augmentation of well | |||||
| 1.001 | OD258658/2024-2025:Sinking of wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 13.50m to 16.50 m including neat banking.
NEW DATA (Prepared based on PHED SDB - Item No.1090 , 1093 & 1096 ) | - | metre | - | - |
| 1.002 | OD258657/2024-2025:Sinking (in or under water) for wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 16.50m to 19.5 m including neat banking.
NEW DATA (Prepared based on PHED SDB - Item No.1090 & 1093 | - | metre | - | - |
| 1.003 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | - | Kwh | - | - |
| 1.004 | 5.4:Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources) | - | cum | - | - |
| 1.005 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | - | cum | - | - |
| 1.006 | 5.22A.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Hot rolled deformed bars | - | kilogram | - | - |
| 1.007 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 0.6 | sqm | - | - |
| 2Supply and fitting of suitable pump set | |||||
| 2.001 | OD258707/2024-2025:Supply erection testing and commissioning of KWA approved 7.5 HP submersible pump having discharge 4.5 lps and total head 64 m with motor unit, capacitor, NRV valves, earthing arrangements and all accessaries complete including 2 year maintenace warranty<br> | - | HP (Horse power) | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1434896.xls
BOQ • 0.30 MB
BIDDOC.pdf
Tender Documents • 0.76 MB
Affidavit.pdf
Other Document • 0.24 MB
Integritypact.pdf
Other Document • 0.23 MB
E-payment.pdf
Additional Documents • 0.23 MB
Corrigendum.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .