Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.9 L+₹1,078.73 (0.37%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | T.D CHANDRASEKHARAN L2 | SACHIN SIJUMON L1 |
|---|---|---|---|---|---|
| 1.00rennovation | |||||
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 114.08 | sqm | 134 ₹15,286.72 Lowest | 134 ₹15,286.72 Lowest |
| 1.00 | 16.42:Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete | 17.11 | cum | 9,300 ₹1,59,141.6 | 9,278 ₹1,58,765.14 Lowest |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 11.88 | cum | 2,542 ₹30,198.96 Lowest | 2,542 ₹30,198.96 Lowest |
| 1.00 | OD283897/2025-2026:Departmental Dry rubble masonry with hard stone in foundation and plinth | 9.5 | cum | 2,455 ₹23,332.32 Lowest | 2,455 ₹23,332.32 Lowest |
| 1.00 | OD283898/2025-2026:Dry rubble masonry with hard stone in foundation and plinth | 2.38 | cum | 6,680 ₹15,871.68 | 6,665 ₹15,836.04 Lowest |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 27.14 | sqm | 400 ₹10,856 Lowest | 400 ₹10,856 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.98 | cum | 9,235 ₹27,474.13 Lowest | 9,236 ₹27,477.1 |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 33.48 | kg | 200 ₹6,696 | 180 ₹6,026.4 Lowest |
Tender Value
₹2.9 L
EMD Value
₹7,202
Closing Date
1 Oct 2025, 12:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer LID and EW Division Kottayam
Annual Plan-DPK-1190/26-Kidangoor Division-Kidangoor Grama Panchayath Renovation of Karuthedathu Check Dam-General Civil Work
2025_LSGD_797611_33
12/2024-25/AEE/LID EW
Open Tender
Civil Works - Buildings
Item Rate
45 days
Kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹635
Yes
₹7,202
Yes
11 Nov 2025
24 Sept 2025
2 Oct 2025
24 Sept 2025
1 Oct 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .