Loading…
Loading…
Tender Value
₹4.6 Cr
EMD Value
₹3.8 L
Closing Date
7 May 2025, 3:00 pmClosed
Sabarmati-Botad section:- Construction of Boundary wall to prevent trespassing and encroachments (4 Km).
13-2025-26
13-2025-26
Open
Works - General
12 Months
Botad, Gujarat
₹0
₹3.8 L
16 Apr 2025
16 Apr 2025
A-CPWD DSR 2021 Items
B-IR USSOR 2021 Items
Item Breakup - A-CPWD DSR 2021 Items
Item Breakup - B-IR USSOR 2021 Items
200.00 minimum 1.10 cum bucket capacity Total 169218.00
Item Breakup - C-NS Items
NS/1 Transportation of Precast Prestressed Concrete elements of M45 grade design mix concrete (i) Fabrication & manufacturing of Prestressed Concrete (Pre-tensioned) elements such as panel, column etc. as per approved drawing in Controlled Factory Environment with approved methodology by using long line casting method. Concreting should be done by batch mixing plant with capable of producing zero slump concrete, transported through mechnical arrangement & layed on the bed, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in PSC element after achieving required strength, yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of HTS wires shall be paid separately under relevant item). (ii) Transportation of Precast PSC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. (iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging, lifting arrangement as per approved drawing etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: Incase of change of size of precast PSC element, payment shall be adjusted on volumetric pro- rata basis. (a) PSC Panel of Size 2330mm X 600mm X 80mm as per Approved Type Plan BHAVNAGAR DIVISION-ENGG/WESTERN RLY
NS/1 Transportation of Precast Prestressed Concrete elements of M45 grade design mix concrete (i) Fabrication & manufacturing of Prestressed Concrete (Pre-tensioned) elements such as panel, column etc. as per approved drawing in Controlled Factory Environment with approved methodology by using long line casting method. Concreting should be done by batch mixing plant with capable of producing zero slump concrete, transported through mechnical arrangement & layed on the bed, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in PSC element after achieving required strength, yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of HTS wires shall be paid separately under relevant item). (ii) Transportation of Precast PSC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. (iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging, lifting arrangement as per approved drawing etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: Incase of change of size of precast PSC element, payment shall be adjusted on volumetric pro- rata basis. (b) PSC Column (H-Section) of size 2650mm X 250mm X 250mm with grooved as per Approved Type Plan BHAVNAGAR DIVISION-ENGG/WESTERN RLY
NS/2 Transportation of Precast RCC elements of M30 grade design mix concrete (i) Fabrication and manufacturing of precast concrete element such as foundation & column cap as per approved drawing, manufactured in controlled factory environment with approved methodology including moulds, mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS:11447:1985 and as per approved shop drawings and design mix as per the direction of Engineer in-Charge (Cost of steel for reinforcement shall be paid separately under relevant item). (ii) Transportation of Precast RCC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. ((iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements. Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: Incase of change of size of precast RCC element, payment shall be adjusted on volumetric pro-rata basis. (a) RCC Foundation 1300mm X 800mm X 700mm as per Approved Type Plan. BHAVNAGAR DIVISION-ENGG/WESTERN RLY
NS/2 Transportation of Precast RCC elements of M30 grade design mix concrete (i) Fabrication and manufacturing of precast concrete element such as foundation & column cap as per approved drawing, manufactured in controlled factory environment with approved methodology including moulds, mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS:11447:1985 and as per approved shop drawings and design mix as per the direction of Engineer in-Charge (Cost of steel for reinforcement shall be paid separately under relevant item). (ii) Transportation of Precast RCC Elements from casting yard to site of work by suitable Truck/Trailor with proper accessories, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. ((iii) The rate is inclusive of all ingredients i.e. cement, sand, aggregate, admixtures, water etc. including handling, batching, mixing, transporting, placing and vibrating of concrete, curing, scaffolding, shuttering, formwork, mould, staging etc. with all lead and lift with contractor's own labour, tools & plants machineries all taxes etc complete as required for successful completion of the item. Note-1: No payment shall be made for damaged Precast elements. Note-2: 70% payment shall be made when PSC elements reach to site and balance 30% payment shall be made after erection & placement in position. Note-3: Incase of change of size of precast RCC element, payment shall be adjusted on volumetric pro-rata basis. (b) Column Cap 300mm X 300mm X 150mm as per Approved Type Plan
NS/3 :- "Providing & laying in position 7mm Kg Dia HTS Indented wires with UTS of 1470 MPa confirming to IS-6003 for manufacturing of PSC element by using mechanical pulling arrangement like Rabbit/ Bed master including all accessories for stressing & destressing operations as per approved make etc, complete as per drawings and direction o f Engineer -in- charge. Note: The rate is inclusive of all contractors labour, materials including, cutting, p u llin g arrangement, machineries, t o o l s & plants, taxes etc. complete. Payment will not be made for any wastages BHAVNAGAR DIVISION-ENGG/WESTERN RLY
NS/4 : Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumb at site making all arrangements (i.e cranes, push- pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer-in- Charge. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractors labour, materials including machineries, tools & plants, etc. complete. Note-2: Incase of change of size of precast PSC element, payment shall be adjusted on volumetric pro- rata basis. (a) PSC Panel of Size 2330mm X 600mm X 80mm as per Approved Type Plan"
NS/4 : Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumb at site making all arrangements (i.e cranes, push- pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer-in- Charge. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractors labour, materials including machineries, tools & plants, etc. complete. Note-2: Incase of change of size of precast PSC element, payment shall be adjusted on volumetric pro- rata basis. (b) PSC Cloumn (H-Section) of size 2650mm X 250mm X 250mm as per Approved Type Plan
NS/4 : Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumb at site making all arrangements (i.e cranes, push- pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer-in- Charge. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractors labour, materials including machineries, tools & plants, etc. complete. Note-2: Incase of change of size of precast PSC element, payment shall be adjusted on volumetric pro- rata basis. (C) RCC Foundation 1300mm X 800mm X 700mm as per Approved Type Plan BHAVNAGAR DIVISION-ENGG/WESTERN RLY
NS/4 : Erection & Installation of Precast Numbers PSC/RCC elements in correct & final position with proper line, level and plumb at site making all arrangements (i.e cranes, push- pull jacks & all other T&P) for lifting, placing, Steel Props for holding in position after Erection & Alignment of elements, within erection tolerance as per IS: 15916 as per approved shop drawings and all complete as per the direction of Engineer-in- Charge. (Cost of grouting shall be paid separately). Note-1: The rate is inclusive of all contractors labour, materials including machineries, tools & plants, etc. complete. Note-2: Incase of change of size of precast PSC element, payment shall be adjusted on volumetric pro- rata basis. (d)Column Cap 300mm X 300mm X 150mm as per Approved Type Plan
NS/5 : Providing & grouting of PSC Column Numbers with RCC Foundation a s per approved drawing with M-60 grade cementitious grout (Non Shrink) of approved make by suitable means ( Free flowing / pump ), curing etc. complete as per directions of Engineer-in- charge. Note: The rate is inclusive of all contractors labour, tools & plants, all materials including approved quality of non shrink cementious grout of M60 grade, aggregates, all machineries, placing i n position, etc. Complete in all respect. Payment will not be made for any wastages. Total 32139472.99
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .