Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.8 L+₹2,781.83 (1.00%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.8 L
EMD Value
₹5,620
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
C/O community Toilet cum Bathroom near Masjid Shareef toib Mohalla 1.4 lacs and community toitet Cum Bathroom Near Masjid Shareef Kalipayli 1.4 lacs at Novarunda under PRI Grants year 2026-27 Block PARANPILAN
2026_RDPR_319182_28
179/Xen/Rew/Bla/2026-27 Dated 03/08/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,620
3 Sept 2026
3 Aug 2026
25 Aug 2026
3 Aug 2026
24 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in trenches for foundation (Not exceeding 1.5m in width | 12.92 | cum | - | - |
| 2 | Providing & laying of dry solling hand packing, in foundation i/c Carriage by MT Avg lead &H.L | 2.4 | cum | - | - |
| 3 | P/L in position cement conc. of grade 1:4:8 (1 cement : 4 fine sand : 8 Nallah graded stone agg 40 mm N/s) excl. cost of centering & shuttering in all work upto plinth level | 0.66 | cum | 1 | ₹0.66 |
| 4 | P/L in position cement conc. of grade 1:3:6 (1 cement : 3 fine sand : 6 stone agg 20 mm N/s) excl. cost of centering & shuttering in all work upto plinth level. | 3.63 | cum | - | - |
| 5 | plum quantity | 0.91 | cum | - | - |
| 6 | P/L of D.P.C. 40mm thick with Cement Concrete 1:2:4 (20 mm N/S | 3.93 | sqm | - | - |
| 7 | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | 6.9 | cum | - | - |
| 8 | Extra for B/w above Plinth Level upto Floor V Level | 4.57 | cum | - | - |
| 9 | Providing & Fixing of Door/Windows Frame & Shutter's (To be paid as per actual) | 1 | No | - | - |
| 10 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for roof. | 30.2 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1056446.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1056446.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .