Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹65.1 LAccepted-AOC | 1st | Accepted-AOC Agreement executed | |
| 2 | 2₹73.5 L+₹8.4 L (12.9%)Rejected-AOC | 2 | Rejected-AOC 2nd lowest |
Tender Value
₹67.8 L
EMD Value
₹50,000
Closing Date
16 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Roads Division Idukki
(RC II Phase I 2023-24 Corrected) RM/ RC II Phase I/ 2024-25 Financial Year / One Year RC -Zone III-For various PWD Roads under Roads Section Kumily in Idukki district -3 Road stretches for a length of 13.610 km.-RC 2-Phase -1
2025_PWD_723996_2
66/EE/2024-25
Open Tender
Civil Works - Roads
Item Rate
365 days
Kumali
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
19 Feb 2025
8 Jan 2025
18 Jan 2025
8 Jan 2025
16 Jan 2025
8 Jan 2025
Amount
Appendix -A -Reactive Maintenance (Initial rectification work)
55.5.a:Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD211384/2024-2025:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual Means
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
OD211385/2024-2025:Providing and fixing R.C board of fabricated steel work by using ISA 25x25x5 mm and MS Sheet of 0.5 mm thick including alla charges of materials and all labour charges,fabrication,conveyance,fixing painting vinyl sticker letter work etc, Complete as per direction of departmental officers.
OD211386/2024-2025:Vinyl sticker including lettering & amp; printing for RC DLP board
Appendix -B-Pre monsoon works.
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
OD211392/2024-2025:Engaging Labours for cutting fallen down trees, rectifying with shelmac. refurbishment of signboards, eviction of minor encroachments ,Clearing culverts and drains etc.
Appendix -c-Proactive / Preventive maintenance.
OD211388/2024-2025:Procuring and supplying of approved quality ready mixed cold bituminous compound or equivalent for potholes filling works , including cost , conveyance , loading unloading .
OD211387/2024-2025:Routine inspection charges :- conducting and reporting routine inspections for the entire length of the project road frequency of seven days throughout the agreement period of the running contract as directed by the departmental officers at site.
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD211389/2024-2025:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual Means
Appendix -D-Emergency works.
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
3.7:Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
3.8.A:Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Mechanised
2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
10.13:Clearing of land slide in hard rock requiring blasting for 50 per cent of the boulders and disposal of the same on the valley side.
OD211391/2024-2025:Engaging JCB for removal of raised berm, clearing of drains, other obstructions and minor landslides in the PWD road including fuel charges, bata for driver and all other expenditure etc. complete.
OD211390/2024-2025:Engaging small tipper for removing earth and other unusable materials from road, including fuel charges and other expenses etc. complete
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
P I VARGHESE (BID ID -2063589)
Bidder Name
Mr.Binoy Scaria
P I VARGHESE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1149445.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .