| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC KERALA KL | ALAPPUZHA | KERALA | 688548 | L1 | Accepted-AOC WORK AWARDED | |
| 2 | Rejected-Technical | - | Rejected-Technical L1 ACCEPTED | |
| 3 | Rejected-Technical | - | Rejected-Technical L1 accepted |
| Sl No | Description | Qty | Unit | ANI C B L1 | AKHIL S KUMAR L2 | Suresh Kumar K C L3 |
|---|---|---|---|---|---|---|
| 1.00****** TOILET COMPLEX ****** | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 35.01 | cum | 304.51 ₹10,660.9 | 290 ₹10,152.9 | 283.62 ₹9,929.54 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.61 | cum | 6,715.21 ₹51,109.46 Lowest | 6,730 ₹51,222.03 | 7,100 ₹54,038.1 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 15.84 | sqm | 326.91 ₹5,178.25 | 324 ₹5,132.16 Lowest | 355 ₹5,623.2 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.81 | cum | 8,878.77 ₹78,230.84 Lowest | 9,000 ₹79,299 | 10,001 ₹88,118.81 |
| 1.00 | OD112452/2025-2026:DRY RUBBLE MASONRY , With out concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per directions of deptl: officers at site | 4.5 | cum | 3,380.48 ₹15,198.64 Lowest | 3,508 ₹15,771.97 | 4,050 ₹18,208.8 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 16.85 | sqm | 853.74 ₹14,383.81 | 820 ₹13,815.36 Lowest | 905 ₹15,247.44 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 51.71 | sqm | 645.79 ₹33,394.45 | 563 ₹29,113.29 Lowest | 680 ₹35,163.48 |
| 1.01 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 8.35 | cum | 6,452.48 ₹53,871.76 Lowest | 7,009 ₹58,518.14 | 7,500 ₹62,617.5 |
| 1.01 | 50.6.3.1:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x10cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth for 10 cm thick wall in CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding etc complete | 3.62 | cum | 6,455.43 ₹23,355.75 Lowest | 7,009 ₹25,358.56 | 7,500 ₹27,135 |
Tender Value
₹16.1 L
EMD Value
₹40,238
Closing Date
25 Sept 2025, 4:00 pmClosed
ASSISTANT ENGINEER
Office of the Assistant ExecutiveEngineerLIDEW Section Vamanapuram Block Panchayat
Annual Plan-Vamanapuram Block Panchayath 2025-26 Project No. 55/26 Construction of Toilet complex near women training centre in the compound of Block Office-Project No. 55/26 Nellanadu GP
2025_LSGD_798329_5
04/2025-26/AE/LIDEW/VMPM
Open Tender
Civil Works - Buildings
Item Rate
180 days
Venjarammodu
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹40,238
Yes
19 Nov 2025
18 Sept 2025
27 Sept 2025
18 Sept 2025
25 Sept 2025
18 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1323774.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .