Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAdmitted-Finance | ₹20.9 L | L1 | Admitted-Finance |
| 2 | L2₹23.6 LAdmitted-Finance | ₹23.6 L | L2 | Admitted-Finance |
| 3 | L3₹26.4 LAdmitted-Finance | ₹26.4 L | L3 | Admitted-Finance |
| 4 | L4₹26.8 LAdmitted-Finance | ₹26.8 L | L4 | Admitted-Finance |
| 5 | L5₹34.5 LAdmitted-Finance | ₹34.5 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AJAYA KUMAR SAMAL AND CO L1 | A.J. ENGINEERING L2 | PUSPA POWER PRESS WORKS L5 | GREATWAVE MARINE SERVICES PVT LTD L4 | MAA JI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 50 | M3. | 400 ₹20,000 | 435 ₹21,750 | 1,000 ₹50,000 | 350 ₹17,500 | 800 ₹40,000 |
| 2.00 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand | 15.5 | M3 | 1,540 ₹23,870 | 1,600 ₹24,800 | 500 ₹7,750 | 1,350 ₹20,925 | 500 ₹7,750 |
| 3.00 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 20 | M2 | 455 ₹9,100 | 500 ₹10,000 | 400 ₹8,000 | 540 ₹10,800 | 400 ₹8,000 |
| 4.00 | Brick work with 1st class bricks in cement mortar (1:4) in ground floor. (consider 3rd corrigenda & Addenda page -1, SL-3) | 4 | M3 | 5,600 ₹22,400 | 5,800 ₹23,200 | 8,000 ₹32,000 | 8,200 ₹32,800 | 8,000 ₹32,000 |
| 5.00 | Labour for hoisting and placing in proper position (up to 1st floor level) departmental R.S. joists, channels, angles. Tees, plates etc. including fitting and fixing same with bolts and nuts, if necessary (but excluding cost of such bolts and nuts) (a) Add extra for each additional floor over 1st floor. | 80 | QNL | 350 ₹28,000 | 410 ₹32,800 | 1,200 ₹96,000 | 730 ₹58,400 | 1,200 ₹96,000 |
| 6.00 | Hire and labour charges for shuttering with centering and necessary staging… (a) 25 mm to 30 mm thick wooden shuttering | 25 | M2 | 560 ₹14,000 | 600 ₹15,000 | 400 ₹10,000 | 795 ₹19,875 | 400 ₹10,000 |
| 7.00 | Reinforcement for reinforced concrete work in all sorts of structures..(a) For works in foundation and upto roof of ground floor, (i) Tor steel/Mild Steel, (II). Other than SAIL/ TATA/RINL. (2nd Corrigenda & Addenda Page-02, SL-1) | 0.8 | MT | 91,000 ₹72,800 | 1,10,000 ₹88,000 | 1,20,000 ₹96,000 | 1,20,000 ₹96,000 | 1,00,000 ₹80,000 |
| 8.00 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering... (As per Rate Analysis) | 5.9 | M3 | 6,650 ₹39,235 | 7,000 ₹41,300 | 12,000 ₹70,800 | 8,200 ₹48,380 | 11,000 ₹64,900 |
| 9.00 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar.. (ii) With 1:4 cement mortar, (a) 20 mm thick plaster. (3rd Corrigenda & Addenda Page-50, SL-1) | 60 | M2 | 280 ₹16,800 | 300 ₹18,000 | 300 ₹18,000 | 270 ₹16,200 | 200 ₹12,000 |
| 10.00 | Neat cement punning 1.5mm thick | 60 | M2 | 105 ₹6,300 | 120 ₹7,200 | 200 ₹12,000 | 65 ₹3,900 | 150 ₹9,000 |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
24 Jan 2026, 6:00 pmClosed
Mr. Ashim Kumar Dey,Sr. Manager (Contract) GRSE
Mr. Ashim Kumar Dey,Sr. Manager (Contract) GRSE
AUGMENTATION WORK OF MAIN PUMP HOUSE AT GRSE FOJ UNIT
2025_GRSE_98709_1
SCC/AKD/OT/PUMP HOUSE/141R/ET-3357
Open Tender
Miscellaneous Services
100 days
As per tender document
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
GARDEN REACH SHIPBUILDERS and ENGINEERS LIMITED
₹43,000
Yes
FOJ UNIT, CIVIL ENGINEERING DEPT.
14 Feb 2026
30 Dec 2025
27 Jan 2026
30 Dec 2025
24 Jan 2026
15 Jan 2026
6 Jan 2026
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
GRSEInstructionsToBidderForOnlineBidSubmission.pdf
Additional Documents • 0.22 MB
MATRIXs3357.xls
Tender Documents • 0.55 MB
BOQ_108275.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid