Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SIDDHI HOUSE NR SASUJI DINING HALL OPP LAL BUGALOW OFF C G ROAD NAVRANGPURA AHEMDABAD GUJARAT 380006 | AHMEDABAD | AHMEDABAD | GUJARAT | 380006 | Admitted-Finance |
| 2 | Admitted-Finance 2ND ROSHAN TOWER S B SHOP BISTUPUR AREA EAST SINGHBHUM JHARKHAND | BISTUPUR | EAST SINGHBHUM | JHARKHAND | 831001 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Feb 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
As per NIT
As per NIT
Package 11 LuPech Incoming Power Facility for LuPech (J18) Project, IOCL Gujarat Refinery
2021_REFHQ_145535_1
077154C/T/LuPechJ18/PACKAGE11
Open Tender
Lump Sum TurnKey
Lump-sum
480 days
Gujarat
As per NIT
5 documents required · 5 mandatory
Exempted
As per NIT
25 Mar 2022
28 Dec 2021
7 Feb 2022
28 Dec 2021
5 Feb 2022
13 Jan 2022
28 Dec 2021 - 3 Jan 2022
4 Jan 2022
180 days
Amount
Execution of complete scope of work on Lump sum turn Key basis for the Package Tender as per the scope of the bidding documents which includes Project Management, Consistency Checks, Power System Studies as mentioned in Bidding Documents, Site development and enabling jobs, Topography Survey, Soil Investigation and underground scanning mentioned in the bid and co-ordination for the same with Owner/PMC, Total Procurement (including first fill of consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all equipment pertaining to LuPech Incoming Power Facility including civil, Structural, HVAC, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation and Painting, Obtaining all Statutory Approvals Pre-commissioning & Mechanical Completion, Preparation of operating manuals, Training of Owner’s O&M personnel, consumables for 6 (six) months operation, Contract closure activities, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during defect liability period. For detailed scope, refer the relevant sections of the Bidding Document
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (DETAILED DESIGN AND ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAKUP OF SP-1 )
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for AC UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DC Battery Charger as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Gas Detection System (GDS) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HVAC/Pressurization System as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR PACKAGE-11 AS PER BIDDING DOCUMENT
No Load losses @ rated voltage (PL_no)
Full load losses (Copper + stray loss) at 75˚C and at ONAF Rating (PL_fl)
Auxiliary Loss (PL_ax)
Rajesh Power Services Pvt Ltd.
Rajesh Power Services Pvt Ltd.
Siemens Limited
Rajesh Power Services Pvt Ltd.
Rajesh Power Services Pvt Ltd.
Siemens Limited
Rajesh Power Services Pvt Ltd.
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .