Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
16 Jul 2026, 5:00 pm7d left
EXECUTIVE OFFICER, PHULBANI MUNICIPALITY
EXECUTIVE OFFICER, PHULBANI MUNICIPALITY
CONSTRUCTION OF CREMATORIUM AT MOHANTY SAHI. WARD NO. 4
2026_ORULB_132799_15
EO-PLBM-1-2026-27
Open Tender
Civil Works - Buildings
90 days
PHULBANI MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹9,000
Yes
8 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. | 83.73 | Cum | 282.89 | ₹23,686.38 |
| 2 | Filling foundation and plinth with sand and wel watered & rammed etc . Complete including cost of sand . | 23.81 | Cum | 658.32 | ₹15,674.6 |
| 3 | Cement Concrete (1:3:6) by using 4cm. Size B.H.G. metal including cost, conveyance etc. complete. | 11.56 | Cum | 7,085.81 | ₹81,911.96 |
| 4 | CC (1:2:4) by using 12 mm size hard granite Crusher broken chips including laying, hoisting, Centring & shuttering with all cost, conveyance etc. complete. | 6.47 | Cum | 8,673 | ₹56,114.31 |
| 5 | Supplying all labour & T&P for R.C.C. work of M 20 using 20mm and down graded hard granite Crusher broken chips including laying, hoisting, Centring & shuttering with all cost, conveyance etc. complete. | 15.67 | Cum | 7,134.12 | ₹1,11,791.66 |
| 6 | Supplying all labour & T&P for cutting, bending & binding of M.S.rod and tying the grills in position including cost, conveyance of M.S.rod and binding wire etc complete. | 15 | Qtl | 9,425.24 | ₹1,41,378.6 |
| 7 | 6mm thick plaster (1:4) including all cost conveyance etc. | 31.38 | sqm | 220.7 | ₹6,925.57 |
| 8 | 20 mm thick cement plaster (1:4) for stone work. Per 1 Sqm. | 31.38 | sqm | 313.72 | ₹9,844.53 |
| 9 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentalingthen after casting including cost of materials complete. 1. mass concrete,footing | 18.72 | sqm | 249.83 | ₹4,676.82 |
| 9.2 | Column / beam | 78.42 | sqm | 1,235.72 | ₹96,905.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_600038.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid