Loading…
Loading…
Tender Value
₹3.6 L
EMD Value
₹9,100
Closing Date
10 Sept 2026, 3:00 pmDue today
Divisional Engineer-(Elec-I), Tirupati
elc1div
Hiring of Scaffolding for the work of Hiring of additional illuminations forparking areas for Srivari Annual and Navarathri Brahmotsavams near Alipiri premisses, Tirupati for the year2 0 2 6 - 2 7 . (Part-B:Scaffolding)
985926
161/DE(Elec.)-I/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
TIRUPATHI
7 documents required · 7 mandatory
₹129
₹9,100
5 Sept 2026
5 Sept 2026
5 Sept 2026
Part - B (Scaffolding)
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 10 meter.
1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places,
2.Erection should be completed before Two days of commencement of the Festival / Utsavam.
3. The TTD has not responsible for theft and fire accident.
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates.
5. The measurements shall be given for the front view of the scaffoldings.
6. 10% extra will be paid for 4-mada streets at Tirumala.
7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs)
8.The above rates are excluding GST
For Ten days (For Annual Brahmotsavams)
For Ten days (For Navarathri Brahmotsavams)
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 20 meter.
1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places,
2.Erection should be completed before Two days of commencement of the Festival / Utsavam.
3. The TTD has not responsible for theft and fire accident.
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates.
5. The measurements shall be given for the front view of the scaffoldings.
6. 10% extra will be paid for 4-mada streets at Tirumala.
7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs)
8.The above rates are excluding GST
For Ten days (For Annual Brahmotsavams)
For Ten days (For Navarathri Brahmotsavams)
Supply of Man mazdoor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 161 NEW.xlsx
TENDER_DOCUMENT • 0.16 MB
161.docx
TENDER_DOCUMENT • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .