Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC LOWEST ONE ACCEPTED | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹3.2 L
EMD Value
₹7,998
Closing Date
14 Nov 2022, 5:00 pmClosed
Assistant Engineer
Assistant Engineer LID and EW Section Kodom Belur GP
Ayurvedha Hospital
2022_LSGD_525245_16
AE/LSGD/KB/04/2022-23
Open Tender
Civil Works - Buildings
Item Rate
150 days
Belur
Please refer Tender documents.
7 documents required · 7 mandatory
₹710
Yes
₹7,998
Yes
17 Dec 2022
7 Nov 2022
16 Nov 2022
7 Nov 2022
14 Nov 2022
7 Nov 2022
Amount
MAINTENANCE WORK
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD222000/2022-2023:Laterate masonry with neatiy dressed latrate ston e of sixe 35*20*20cm nearest sixe in cement mortor foundation and besement including all cost of materials labour charges etc
OD221999/2022-2023:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
14.64.1:Finishing walls with water proofing cement paint of required shade:Old work ( one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
OD222042/2022-2023:Supplying and fixing 150mm dia pvc rain water gutter semi circular section circular includding fitting with MS flat supporters at 1m intervaletc.complete
OD222048/2022-2023::Providing and laying 60mm thick factory made cement concrete interlocking paver block made by block machine with strong vibratory compaction of approved size design and shape laid in required colour and pattern over and including 50mm thick compacted bed of stone aggregate 6mm nominal size filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. vertically including cost and conveyance of all materials all labour charges, fabricating etc. complete. (Modified 16.68 by replacing Sand bed 6mm stone aggregate bed)
RAKESH RAGHAVAN
Bidder Name
Mohammed Ashraf T T
RAKESH RAGHAVAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_757169.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .