| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹22.0 L+₹2,726 (0.12%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | DURAISAMY DURKKAIYAPPAN L2 | MAHENDRAN R L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work : CONSTRUCTION OF 100000 LITRES CAPACITY OHT ( 7.50M STAGING ) & EPL AT THIRUMUKUDALORE H/O SOMUR | |||||
| 2.00Construction 100000 lts OHT 7.50m staging (sub estimate) | |||||
| 3.00Earth work excavation below G.L. and depositing on bank within an initial lead of 2.00 m and an initial lift of 1.00 for the following classification of soil | |||||
| 4.00 | 1st depth of 2 m | 69.6 | Cu.m. | 247.32 ₹17,213.47 | 246.12 ₹17,129.95 Lowest |
| 5.00 | 2nd depth of 2 m | 7.59 | Cu.m. | 258.93 ₹1,965.28 | 257.73 ₹1,956.17 Lowest |
| 6.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | 3.48 | Cu.m. | 5,243.44 ₹18,247.17 | 5,242.24 ₹18,243 Lowest |
| 7.00 | Supplying&filling with clean River sand in layer of 15cm thick, well consolidated including watering etc.complete for foundation | 5.22 | Cu.m. | 1,592.18 ₹8,311.18 | 1,590.98 ₹8,304.92 Lowest |
| 8.00RCC 1:1.5:3 (one cement,one and half snd and three 20mm HBG stone)for column fotting excluding the cost of reinforcement and centering and shuttering but including curing finishing, etc.complete | |||||
| 9.00 | 1.50 m to 4.50m below GL | 8.05 | Cu.m. | 9,178.96 ₹73,908.99 | 9,177.76 ₹73,899.32 Lowest |
| 10.00 | 0m to 1.50m below GL | 5.16 | Cu.m. | 9,049.27 ₹46,730.43 | 9,048.07 ₹46,724.23 Lowest |
Tender Value
Refer Docs
EMD Value
₹22,200
Closing Date
17 Sept 2025, 3:00 pmClosed
BDO(B.Pt), Karur
BDO(B.Pt), Karur
CONSTRUCTION OF 100000 LITRES CAPACITY OHT 7.50M STAGING and EPL AT THIRUMUKUDALORE in SOMUR
2025_RDTN_602281_1
CONSTRUCTION OF 100000 LITRES CAPACITY OHT ( 7.50M STAGING ) and EPL AT THIRUMUKUDALORE in SOMUR
Open Tender
Civil Works - Others
Item Wise
90 days
Karur Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,200
Yes
26 Sept 2025
10 Sept 2025
17 Sept 2025
10 Sept 2025
17 Sept 2025
10 Sept 2025
Amount
Name of the Work : CONSTRUCTION OF 100000 LITRES CAPACITY OHT ( 7.50M STAGING ) & EPL AT THIRUMUKUDALORE H/O SOMUR
Construction 100000 lts OHT 7.50m staging (sub estimate)
Earth work excavation below G.L. and depositing on bank within an initial lead of 2.00 m and an initial lift of 1.00 for the following classification of soil
1st depth of 2 m
2nd depth of 2 m
PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL.
Supplying&filling with clean River sand in layer of 15cm thick, well consolidated including watering etc.complete for foundation
RCC 1:1.5:3 (one cement,one and half snd and three 20mm HBG stone)for column fotting excluding the cost of reinforcement and centering and shuttering but including curing finishing, etc.complete
1.50 m to 4.50m below GL
0m to 1.50m below GL
0m to 4.50m From GL
4.50m to 7.32m From GL
7.32m &10.98m from GL
Centering, soffits of RCC works including strutting and shuttertting Charges etc. complete for the following
Below GL (Plane surface)
0 - 3.3 m ht (plane surface)
3.31 - 4.30 m ht (plane )
6.31-7.30m ht (plane)
Curved surface
Square Column:
Column below G.L.
Column 0 to 3.30 m height above G.L.
Colum above 3.3m to 4.3 ht from GL
Column above 4.30 m upto 5.30 m
Column above 5.30 m upto 6.30 m
Column above 6.30 m upto 7.30 m
Circular column
Column below G.L.
Column 0 to 3.3 m height above G.L.
Column above 3.3 m to 4.3 m height from G.L.
Column above 4.30 m upto 5.30 m
Column above 5.30 m upto 6.30 m
Column above 6.30 m upto 6.80 m
Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods.
UP TO 16 MM DIA
Painting two coats to the exposed surface of SR using cement paint
Supply,delivery and fixing in position of MS ladder outside the tank
Providing RCC inside ladder as per approved design (vide separate sheet)
Providing PVC Ventilating Arrangements Mosquito Prrof nylon Net with 110mm PVC Cowl etc complete
Supplying and fixing of manhole cover with frame of size 0.60 m x 0.60 m in RCC 1:1.5:3 and ms angle.
Supplying and fixing of cut stone in CM 1:3 below inlet pipe
Supply,delivery and fixing of pipes for OHT connections including All Charges
Supply and cost of 90mm PVC pipe 4 KSC including all cost of materials and transport charges etc .,complete
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard spec
Laying and jointig of P.V.C and G.I pipe into the trench with proper grading and alignment and all labour charges etc,,complete
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
DURAISAMY DURKKAIYAPPAN (BID ID -1458389)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .