| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.5 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ARK GEO DRILL ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00 | Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security etc. complete upto Parong Dam Site as per directions of Engineer-in-charge. | 6 | Job | 1,92,000 ₹11,52,000 Lowest |
| 2.00 | Making Approach Path and Cutting of Steps in hilly terrain including cost of labour and T&P complete. For 3.0 m wide path | 22 | per 100m length | 6,020 ₹1,32,440 Lowest |
| 3.00 | Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. Up to 500 m lead. | 3 | Each Machine | 47,000 ₹1,41,000 Lowest |
| 4.00 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation upto 100m depth | 280 | mtr | 12,800 ₹35,84,000 Lowest |
| 5.00 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth. | 100 | mtr | 20,050 ₹20,05,000 Lowest |
| 6.00 | Construction of Floating Platform of size 9.0 m x 9.0 m using heavy duty steel drums of industrial use including cost of allied materials, labour, T&P complete as per direction of engineer-in charge. | 1 | Nos | 7,00,400 ₹7,00,400 Lowest |
| 7.00 | Water permeability tests at different depth: Upto 100m. | 94 | Each | 5,250 ₹4,93,500 Lowest |
| 8.00 | Water permeability tests at different depth: From 100m -300m. | 33 | Each | 10,000 ₹3,30,000 Lowest |
| 9.00 | Fabrication and supply of seasoned wooden Core Box of size 1.5 m x 0.3 m x 0.1 m with wooden separators, hinges, handles etc. complete in all respect as per directions of engineer-in-charge. | 64 | Each | 3,200 ₹2,04,800 Lowest |
| 10.00 | Providing and laying cement concrete 1:2:4 (1cement:2 Coarse sand:4 stone aggregate 20mm nominal size) excluding the cost of centring and shuttering in: Foundation & Plinth. | 1.01 | Cum | 7,800 ₹7,878 Lowest |
Tender Value
₹87.9 L
EMD Value
₹1.8 L
Closing Date
24 Sept 2026, 5:00 pmClosed
Group Senior Manager (E/PnC)
Siang Lower HE Project,NHPC Office Complex, Adjacent to Smart City Office, Pasighat, East Siang District Arunachal Pradesh-791102
Exploratory Drilling Works of 380m length (03 Nos. holes at 60m each and 01 No. Hole at min 200m) at Left and Right Banks of USMSP at Parong Dam Axis
2026_NHPC_915581_1
NH/SIANGLOWER/NIT/2026/04
Open Tender
Civil Works
Item Rate
120 days
Siang Lower HE Project, Pasighat.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
NHPC Limited
₹1.8 L
Yes
6 Oct 2026
4 Jul 2026
28 Sept 2026
4 Jul 2026
24 Sept 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security etc. complete upto Parong Dam Site as per directions of Engineer-in-charge. | - | Job | 1,92,010.12 | - |
| 2 | Making Approach Path and Cutting of Steps in hilly terrain including cost of labour and T&P complete. For 3.0 m wide path | - | per 100m length | 6,049.06 | - |
| 3 | Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge. Up to 500 m lead. | - | Each Machine | 47,755.83 | - |
| 4 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation upto 100m depth | - | mtr | 12,894.07 | - |
| 5 | Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge. In hard rock formation beyond 100 m and up to 300 m depth. | - | mtr | 20,057.46 | - |
| 6 | Construction of Floating Platform of size 9.0 m x 9.0 m using heavy duty steel drums of industrial use including cost of allied materials, labour, T&P complete as per direction of engineer-in charge. | - | Nos | 7,00,418.74 | - |
| 7 | Water permeability tests at different depth: Upto 100m. | - | Each | 5,253.14 | - |
| 8 | Water permeability tests at different depth: From 100m -300m. | - | Each | 10,187.9 | - |
| 9 | Fabrication and supply of seasoned wooden Core Box of size 1.5 m x 0.3 m x 0.1 m with wooden separators, hinges, handles etc. complete in all respect as per directions of engineer-in-charge. | - | Each | 3,183.73 | - |
| 10 | Providing and laying cement concrete 1:2:4 (1cement:2 Coarse sand:4 stone aggregate 20mm nominal size) excluding the cost of centring and shuttering in: Foundation & Plinth. | - | Cum | 7,732.5 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.13 MB
BOQ_962582.xls
BOQ • 0.36 MB
TenderDoc.pdf
Tender Documents • 4.22 MB
Corrigendum07.pdf
PDF • 0.49 MB
Corrigendum06.pdf
PDF • 0.49 MB
Corrigendum05.pdf
PDF • 0.49 MB
Corrigendum05.pdf
PDF • 0.49 MB
BOQ_962582.xls
PDF • 0.41 MB
Corrigendum 1 (Parong)-signed.pdf
PDF • 0.58 MB
Corrigendum_4.pdf
PDF • 0.63 MB
Corrigendum_4.pdf
PDF • 0.63 MB
Corrigendum2.pdf
PDF • 0.56 MB
Corrigendum2.pdf
PDF • 0.56 MB
BOQ_962582.xls
PDF • 0.41 MB
Corrigendum 1 (Parong)-signed.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .