| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.2 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹28.9 L+₹65,562.77 (2.32%)Rejected-AOC | 2 | Rejected-AOC 2 | |
| 3 | 3₹29.2 L+₹94,305.11 (3.34%)Rejected-AOC 417 SHAHPUR NIJ MORTA DISTT GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | 3 | Rejected-AOC 3 | |
| 4 | 4₹29.9 L+₹1.7 L (5.85%)Rejected-AOC 255T SMARAT ASHOK NAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | 4 | Rejected-AOC 4 | |
| 5 | 5₹30.4 L+₹2.1 L (7.50%)Rejected-AOC | 5 | Rejected-AOC 5 |
Tender Value
₹33.3 L
EMD Value
₹66,700
Closing Date
10 Oct 2023, 11:00 amClosed
EXECUTIVE ENGINEER
EE RCD BAREILLY
RAJWAH FARIDPUR KE KM 27.792 PAR STHIT VRB BOX CULVERT KE PUNARNIRMAN KA KARY
2023_UPIDC_845728_1
03/EE/RCD/2023-24
Open Tender
Civil Works - Bridges
Item Rate
60 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹66,700
8 Nov 2023
4 Oct 2023
10 Oct 2023
4 Oct 2023
10 Oct 2023
4 Oct 2023
Amount
Earth work in foundation in dry soil including lift up to 1.50 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-In-Charge.
Shuttering for C.C. blocks and concrete including cost of shuttering, material, labour and T&P required for proper completion of work etc.
Suppling and Laying C.C.1:2:4 (M-15) with cement,coarse sand & 20 mm down graded stone grit including cost of all material,labour and T&P etc. complete but excluding cost of shuttering
Centering & Shuttering For R.C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc.
HYSD Fe-415 Steel Bar as reinforced concrete wrought to required shape as necessary including bending for proper completion of work and including supply of all steel and wastage and over lapping & hooks.
Laying C.C. 1:1.5:3 (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering.
Laying R.C.C. 1:1:2 (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Supplying and Laying Tarfelt sheet below aproach slab as paper bearing including cost of all material labour and T&P required for proper completion of work.
Supplying & Fixing 100 MM dia PVC pipe for Drain Spouts including cost of all material, labour and T&P etc.required for proper completion of work.
Providing weep holes in structure including cost of all material (100 mm dia P.V.C. pipe etc.), labour and T&P etc. required for proper completion of work.
Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer-In-Charge.
Supplying, laying and consolidation 150 mm thick loose to 100mm of brick ballast size 20 mm to 40 mm by hand roller including cost of all , labour and T&P etc( old dismenteld brick used for floor apron.required for proper completion of work.
M/s Barkati Construction company
M/S OM ENTERPRISES
M/s Chandrapal Singh
m/s mohd.sajid thekedar
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .