Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.0 L
EMD Value
₹9,048
Closing Date
30 Nov 2026, 5:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Officer Nofired Area Kalol (PMS)
The work of Compound Wall and Paver Block at New Pump room (Plot No.1/B/2) of Notified area GIDC Kalol (PMS).
368309
01 202627
Open
Construction Works
Works
Panchmahal
₹1,062
Notified Area Officer
₹9,048
23 Nov 2026
23 Nov 2026
23 Nov 2026
30 Nov 2026
23 Nov 2026
120 days
Name of Work: The work of Compound Wall and Paver Block at New Pump room (Plot No. 1/B/2) of
Notified area GIDC Kalol (PMS).
Sr. DESCRIPTION OF ITEM UNIT QTY. Rate Amount
Demolition including stacking of serviceable Cum 1.08 1030.81
1 materials and disposal of unserviceable
materials with all lead and lift. (A) RCC work
(B) Brickwork Cum 4.14 536.09
Excavation for foundation upto 1.5 m Depth Cum 68.00 117.08
including sorting out and stacking of useful
2 material and disposing off the excavated stuff
up to with all lead & lift within estate. (A) Lose
3. Excavation for foundation for depth from 1.5 m Cum 19.00 129.81
to 3.0 m including sorting out and stacking of
useful material and disposing off the excavated
stuff up to with all lead & lift within estate (A)
Loose or soft soil.
4. Providing & Laying cement concrete 1:3:6 (1 Cum 21.00 3168.76
Cement:3 Coarse Sand:6 M/C stone aggregates
20 mm nominal size) and curring complete
including cost of form work in:(a) Foundationa
5. Providing and laying Controlled cement Cum 10.00 4607.95
concrete M 250 and curing complete including
the cost of form work and excluding cost of
reinforcement for RCC work in Foundations,
footings, Base of Columns and Mass Concrete.
6. Providing and laying Controlled cement Cum 8.00 5512.85
concrete M 250 and curing complete including
the cost of formwork and excluding cost of
reinforcement for RCC work in Beam.
7. Providing and laying Controlled cement Cum 6.00 8291.73
concrete M 250 and curing complete in cluding
the cost of formwork and excluding cost of
reinforcement for RCC Column work
8. Providing TMT Bar FE 500D reinforcement for Kg. 2100.00 76.21
RCC work including bending, binding and
placing in position complete upto floor two
9. Brick work using common burnt clay Building Cum 32.00 4061.21
brick having crushing strength not less than
kg/sq. cm. in foundation and plinth in cement
mortar 1:6 (1 Cement: 6 fine sand). (B)
Conventional and Extra for brickwork in
superstructure above floor two level.
Sign of Contractor Chief Officer
N.A, GIDC, KALOL(PMS)
10 20 mm. thick sand faced cement plaster on wall Sqm 270.00 329.29
up to height 10 Meters above ground level
consisting of 12mm thick backing coat of C.M.
1: 3 (1 cement: 3 sand) and 8 mm thick
finishing coat of C.M. 1: 1 (1 cement: 1 sand)
11 Finishing wall with weather proof experior Sqm 770.00 134.84
emulsion paint on wall surface (two coats) to
give a required shape even shade after
thoroughly brushing the surface to remove all
dirt and remains of loose powdered materials.
etc complete. Applying one coat of putty & one
coat of primer of approved brand and
manufacture on new wall surface to give an
even shade including thoroughky brushing the
surface free from mortar dropping and other
foreign matter and sand papered smooth. incl.
filling the all-small holes, cracks, open joints,
undulations and similar other minor defects of
every kind with ready made putty of approved
brand and manufacture and rubbed smooth with
sand paper incl. nece. scaffoldings etc.
complete at all floor levels
12. Providing and Fixing 'Y' Shaped Barbed wire Rmt. 37.00 344.37
fencing on compound wall top with verical
angle of 50x50x6 mmx 0.80 Mtr height, two
cross angles 50x50x6 mm x 0.45 Mtr. Length,
having 3 Horizontal and two diagonal rows of
barbed wire (9.38 kg/100 rmt) on vertical angle
and three horizontal and two diagonal barbed
wire rows on each cross angles incl. cost of
barbed wires, necessary GI stapplings, fixing in
C.C. (1:2:4) blocks of 0.35x0.35x0.20 Mtr. size
on top of compound wall, painting angles with
one coat of anticorrossive primer and two coats
of enamel paint of approved quality, necessary
scaffolding etc. complete as per the direction of
the Engineer in Charge.
13. Providing and fixing pre-cast Rubber dye/steel Sqm. 100.00 698.65
dye molded inter locking concrete paver block
60mm thick with grade of concrete M-40
pnumatic compressed by mechanically pressed
and shot blasted as per approved design
including 35mm Stone dust layer for levelling
and filling the joint with sand in proper line and
level etc competed as directed by Engineer-in-
charge. (The side/End edges paver blocks must
be required machine cut).
14. Providing and fixing iron compound gate as per Kg. 1228.50 92.40
design and given drawing with bolts nuts,
locking arrangements, stoppers, holdfasts,
handles, aldrops etc. incl. cost of welding,
cutting etc. using the M.S. pipes (Heavy duty),
Sign of Contractor Chief Officer
N.A, GIDC, KALOL(PMS)
angles, flats etc. as per drawing incl. fixing in
RCC. column etc. incl. applying a priming coat
of red lead paint and three coats of approved
synthetic enamel paint etc. complete.
15. Excavation for Pipeline trenches for water Cum 12.00 89.00
supply, sewerage line, manhole etc. all with
shoring and struting if required as per required
gradient and time including safety provisions
using site rails and stacking excavated stuff
including up to all required lead cleaning the
site etc. complete for all lifts and in all sorts of
soil and soft murrum (Upto 1.5 m Depth.)
16. P. V. C. - Pipe Providing and supplying in Rmt. 10.00 273.00
standard length ISI mark rigid unplasticised
PVC pipes sulto ing 1 joint including cost of
rings, as per IS specification na 4985/1985
including a local transportation tight charge,
octrol, inspection charges, loading, unloading,
conveyance stores and including cost of
jointing meterial etc. complete (PVC-6 kg/cm2
17. Lowering, laying, fixing and jointing Rmt. 10.00 19.00
PVC/uPVC/CPVC pipes and specials of
following class and diameter including cost of
conveyance from stores to site of works
including cost of labour material, cement
solvent, giving satisfactory hydraulic testing as
per ISI code (110mm dia.)
(B) 75mm dia. Rmt. 10.00 15.00
18. Refilling the pipeline trenches incl. ramming, Cum 12.00 22.00
watering, consolidating desposal of surplus
stuff as directed within a radius of 3 km.
Refilling as directed by Engineer incharge.
I/We am/are willing to carry out the work of at ___________________percent (should be written in
figure and words both) above/ below the Estimated rates mentioned above. (in case there is no
reduction than the word nil should be filled in).
Amount of my/our tender works out as under:
Estimated amount put to Tender Rs 9,04,814.06 Estimated amt. put to Tender Rs
Add % Above Rs. __________ Deduct % Below Rs. _____________
Total Rs. ___________ Net Amount Rs. _____________
(Please strike out which ever is not applicable)
1. AlI work shall be carried out as per the specifications of the NAO or as directed.
2. All the columns in schedule should be filled in ink & the total entries in the last column should
be struck by the contractor under his signature.
3. Rate quoted include clearance of site (Prior to commencement of work and at its close) in all
Respects and hold good for work under all conditions, site, moisture, weather etc.
4. I/We have read the tender/general Specifications/conditions and I/We agree to follow same and
biding to me/us.
5. All rates are including all taxes & charges except GST & only GST will be paid separately.
Sign of Contractor Chief Officer
N.A, GIDC, KALOL(PMS)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP Compound wall Pump room_compressed.pdf
Compound wall Pump room Schedule B.pdf
B1 Agreement Part 1.pdf
B1 Agreement Part 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .