| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹2.1 Cr+₹49.1 L (29.8%)Accepted-Finance | ₹2.1 Cr+₹49.1 L (29.8%) | L2 | Accepted-Finance Being L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bidder has not submitted bid as per tender documents |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bidder did not upload shortfall documents as asked |
| 5 | Rejected-Technical | - | - | Rejected-Technical Bidder did not upload shortfall documents as asked |
| Sl No | Description | Qty | Unit | NITHIN SAI CONSTRUCTIONS L1 | D. D. Construction L2 |
|---|---|---|---|---|---|
| 1.00FORMATION WORKS | |||||
| 1.01 | Rough excavation in soil/soil mixed with small boulders getting out and disposing all excavated materials lead up to 6 m and up to 1.5 m deep (by manual means). All as specified in special conditions and particular specifications and as directed by Engineer-in-Charge/ OC Contract. | 576.04 | Cum | 171.1 ₹98,560.44 Lowest | 504 ₹2,90,324.16 |
| 2.00PERMANENT WORKS (PROTECTIVE/IMPROVEMENT WORK) | |||||
| 2.01 | Excavation in trenches not exceeding 1.2 m width and 1.5 m depth in soil/soil mixed with boulders (SMB), including dressing bottom and sides getting out and disposing all excavated material lead upto 6 m and lift upto 1.5 m. (by manual means). | 1,146.3 | Cum | 194.7 ₹2,23,184.61 Lowest | 560 ₹6,41,928 |
| 2.02 | Hard core comprising of broken road metal size 5 cm graded downwards spread in layers not exceeding 15 cm including watering, ramming and finishing to required level and gradient including cost of stone metal. | 337.79 | Cum | 1,829 ₹6,17,817.91 Lowest | 3,136 ₹10,59,309.44 |
| 2.03 | Plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregates of size 4cm graded downwards) in foundation or elsewhere (excluding the cost of centering/shuttering). | 347.97 | Cum | 4,130 ₹14,37,116.1 Lowest | 5,450 ₹18,96,436.5 |
| 2.04 | Plain cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 stone aggregate size 4cm graded downwards) in foundation or elsewhere (excluding the cost of centering/shuttering). | 12.75 | Cum | 4,307 ₹54,914.25 Lowest | 5,825 ₹74,268.75 |
| 2.05 | Centering/Shuttering (Steel) including strutting, propping and removal of formwork | 141.5 | Sqm | 649 ₹91,833.5 | 500 ₹70,750 Lowest |
| 2.06 | Random / Polygonal rubble walling in cement mortar (1:6) brought to course 45 cm high, well bonded (material and labour) | 537.24 | Cum | 4,189 ₹22,50,498.36 Lowest | 6,100 ₹32,77,164 |
| 2.07 | Filling of stones/selected material in layers well packed behind retaining walls, breast walls, abutment/wing walls of bridges or culverts (labour and material). | 201.96 | Cum | 1,062 ₹2,14,481.52 Lowest | 2,442 ₹4,93,186.32 |
Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
30 Mar 2026, 6:00 pmClosed
Chief Engineer Project Chetak
HQ Chief Engineer Project Chetak, C/o 56 APO, Bikaner, PIN 334006
RETENDER 3rd CALL FOR IMPROVEMENT /WIDENING OF INTERNAL ROAD TO IW SPECIFICATIONS WITH BLACK TOP SURFACE INCLUDING INTERLOCKING BLOCK FOOTPATH AT GREF CENTRE AND RECORDS, PUNE, UNDER PROJECT CHETAK IN THE STATE OF MAHARASHTRA
2026_BRO_747484_3
CE (P) CTK/19/2025-26
Open Tender
Civil Works
Works
150 days
As per tender documents
As per tender documents
8 documents required · 8 mandatory
₹0
₹2.3 L
Yes
11 Sept 2026
13 Mar 2026
6 Apr 2026
13 Mar 2026
30 Mar 2026
16 Mar 2026
13 Mar 2026 - 16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FORMATION WORKS | |||||
| 1.01 | Rough excavation in soil/soil mixed with small boulders getting out and disposing all excavated materials lead up to 6 m and up to 1.5 m deep (by manual means). All as specified in special conditions and particular specifications and as directed by Engineer-in-Charge/ OC Contract. | 576.04 | Cum | 10 | ₹5,760.4 |
| 2PERMANENT WORKS (PROTECTIVE/IMPROVEMENT WORK) | |||||
| 2.01 | Excavation in trenches not exceeding 1.2 m width and 1.5 m depth in soil/soil mixed with boulders (SMB), including dressing bottom and sides getting out and disposing all excavated material lead upto 6 m and lift upto 1.5 m. (by manual means). | 1,146.3 | Cum | 10 | ₹11,463 |
| 2.02 | Hard core comprising of broken road metal size 5 cm graded downwards spread in layers not exceeding 15 cm including watering, ramming and finishing to required level and gradient including cost of stone metal. | 337.79 | Cum | 10 | ₹3,377.9 |
| 2.03 | Plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregates of size 4cm graded downwards) in foundation or elsewhere (excluding the cost of centering/shuttering). | 347.97 | Cum | 10 | ₹3,479.7 |
| 2.04 | Plain cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 stone aggregate size 4cm graded downwards) in foundation or elsewhere (excluding the cost of centering/shuttering). | 12.75 | Cum | 10 | ₹127.5 |
| 2.05 | Centering/Shuttering (Steel) including strutting, propping and removal of formwork | 141.5 | Sqm | 10 | ₹1,415 |
| 2.06 | Random / Polygonal rubble walling in cement mortar (1:6) brought to course 45 cm high, well bonded (material and labour) | 537.24 | Cum | 10 | ₹5,372.4 |
| 2.07 | Filling of stones/selected material in layers well packed behind retaining walls, breast walls, abutment/wing walls of bridges or culverts (labour and material). | 201.96 | Cum | 10 | ₹2,019.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
InstructiontoBidders.pdf
Additional Documents • 0.19 MB
BOQ_846712.xls
BOQ • 0.31 MB
Re_TenderDoc328_3rdcall.pdf
Tender Documents • 2.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .