| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | L1 | Accepted-AOC Agreed | |
| 2 | Rejected-Technical | - | Rejected-Technical L2Rejected |
| Sl No | Description | Qty | Unit | NAUSHAD PS L1 | SHANTO PAULOSE L2 |
|---|---|---|---|---|---|
| 1.00MAINTANANCE | |||||
| 1.00 | 15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet | 40.6 | sqm | 79.97 ₹3,246.78 Lowest | 86.37 ₹3,506.62 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 3.94 | cum | 2,129.84 ₹8,402.22 Lowest | 2,300.23 ₹9,074.41 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.38 | cum | 3,671.89 ₹1,410.01 Lowest | 3,965.64 ₹1,522.81 |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 7.29 | cum | 1,197.33 ₹8,722.55 Lowest | 1,293.12 ₹9,420.38 |
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 1 | each | 379.56 ₹379.56 Lowest | 409.92 ₹409.92 |
| 1.01 | OD449100/2025-2026:Engaging Manmazdoor fo cleaning works. | 2 | each | 1,082.18 ₹2,164.36 Lowest | 1,168.75 ₹2,337.5 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 34.42 | cum | 359.72 ₹12,380.12 Lowest | 388.5 ₹13,370.62 |
| 1.01 | OD446501/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site (
60.7.1 ) | 16.84 | cum | 3,993.46 ₹67,269.83 Lowest | 4,312.94 ₹72,651.47 |
| 1.01 | OD449656/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 3.8 | cum | 1,715.88 ₹6,520.34 Lowest | 1,853.15 ₹7,041.97 |
Tender Value
₹16.9 L
EMD Value
₹42,371
Closing Date
7 Mar 2026, 12:00 pmClosed
Assistant Engineer
Office of Assistant Engineer LSGD Vathikudy
VATHIKUDY GP 2025-26 - IMPROVEMENTS OF VARIOUS ANGANWADY IN VATHIKUDY GP ( 118/026)-
2026_LSGD_841553_2
5/AE/TND/LID/EW/VTY/25-26
Open Tender
Civil Works - Buildings
Item Rate
Vathikudy G.P
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,371
Yes
30 Sept 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MAINTANANCE | |||||
| 1.001 | 15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet | 40.6 | sqm | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 3.95 | cum | - | - |
| 1.003 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.38 | cum | - | - |
| 1.004 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 7.29 | cum | - | - |
| 1.005 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 1 | each | - | - |
| 1.006 | OD449100/2025-2026:Engaging Manmazdoor fo cleaning works. | 2 | each | - | - |
| 1.007 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 34.42 | cum | - | - |
| 1.008 | OD446501/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site (
60.7.1 ) | 16.85 | cum | - | - |
| 1.009 | OD449656/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 3.8 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.02 MB
BOQ_1419233.xls
BOQ • 0.34 MB
viewsbd.pdf
Tender Documents • 1.67 MB
viewnit.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .