Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
5 Dec 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Ex Engineer ESSD Tangmarg
Electric Special Sub Division Tangmarg
Improvement of HT/LT network at ward No 1 and Ward 3 at Yall Under PRI Grants 2023-24.
2023_PDD_237865_1
Fresh E-NIT No.SSDT 48 of 2023-24,Dated 22/11/2023
Open Tender
Electrical Works
Turn-key
45 days
Improvement of HT/LT network at Yall
Please refer Tender documents.
4 documents required · 4 mandatory
₹270
Yes
Major Head (0801-PDD) (AEE Tangmarg)
₹8,000
Yes
6 Dec 2023
22 Nov 2023
6 Dec 2023
22 Nov 2023
5 Dec 2023
23 Nov 2023
22 Nov 2023 - 23 Nov 2023
Amount
Supply , Transportation and errection of 9MTR long ST Poles (410 SP-33) completely errected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit. (as per REC Standard)
Supply, Transportation and errection of 8MTR long ST Poles (410-SP 15) completely erected in the pit of 1/5th of the pole length including excavation and back filling of the pole pit . (as per REC standard)
Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR weasel Conductor, (30mm2 ACSR Conductor) as per REC standard.
Supply, transportation and fixing of GI Channel /Angle Iron for Cross Arms, Braces, Transformer Belt, F-Top, Collers etc for Sub Station and poles (Complete Job including Nuts & Bolts and Washers)
Supply and fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Earthing of Poles Complete by Spike earthing Rod 20mm 2.5mtr long with GI strip 25x3mm (as per REC Standards)
Supply and fixing of LT Shackle Insulators with G.I Mukhi Clamps (Scaffolding G.I LT Clamps) including nuts and bolts as per REC standard
Supply, Carriage up to site, Installation, testing and Commissioning of danger Plates
Supply, Carriage up to site, Installation, testing and Commissioning of anti-climbing devices with clamps
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.5 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 9 MTR ST Pole
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.45 cum/pole (Pit 600x600x1433.3 mm) for 8 MTR ST Pole
Poviding and Painting of ST Poles with one coat of red oxide and two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc.
Supply, Carriage up to site, Installation, testing and Commissioning of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc.
Pre, during and post execution geo tagged photographic evidence consisting of 5x7 inch photographs in coffee table book (covering each pole/Sub Station)
ABDULLAH AND CO
M/S Aftab Electronics
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .