Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance 101 1ST FLOOR SANGEETA KALAMBE 4 ANTRAA TOWER BAIDYANATH SQUARE NAGPUR NAGPUR MAHARASHTRA 440009 UDYAM MH 20 0003190 27AAJCS6710M1ZX R S MSME STATUS AS VERIFIED | 440009 | -2.50% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical documents not ok |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical documents not ok |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
27 Apr 2026, 5:00 pmClosed
ACE Govindpur area
GM office, Govindpur area3 , bilbera sonardih
Strengthening of Khodo river bed by laying Movement Absorption Flexible Lining (MAFL Lining) at Jogidih Colliery (300 m) along with 5 (five) years comprehensive maintenance period at no additional cost to company, commencing from the date of comple
2026_BCCL_358260_1
BCCL/GM/AR III/ACE/E-NIT/ 26-27/01/49-74
Open Tender
AMC WORKS
90 days
Govindpur area
Please refer Tender documents.
2 documents required · 2 mandatory
₹2.6 L
20 May 2026
13 Apr 2026
29 Apr 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
13 Apr 2026 - 27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil work | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic xcavator)/manual means oveareas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) includinggetting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directedby Engineer-in-charge. | 3,333.6 | m3 | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming
and watering, lead up to 50 m and lift upto 1.5 m. | 833.4 | M3 | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of
centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone
aggregate 20mm nominal size derived from natural sources). | 555.6 | M3 | 1 | ₹555.04 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.85 MB
BOQ_371135.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid