Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC | L1 | Accepted-AOC Agreement executed |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
14 Nov 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer Inland Navigation Division Kollam
Kollam thodu Reach 6 Urgent rectification at the right bank of Kollam Thodu part of WCC in between Ch 7310 to Ch 7350 km General Civil Work
2022_Irrig_517733_2
IRR/KP/TR/5308/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
120 days
Kollam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
12 Jan 2023
4 Nov 2022
17 Nov 2022
4 Nov 2022
14 Nov 2022
4 Nov 2022
Amount
Rectification work
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD12330/2022-2023:Demolishing/Chipping cement concrete manually / by mechanical means without damaging the piles, including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
OD12331/2022-2023:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth,with all leads and lifts, disposed earth to be levelled and neatly dressed. All kinds of soil
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
OD12332/2022-2023:Providing and conveying Pre-cast reinforced cement concrete piles of specified size in M-25 cement concrete to carry safe working load not less than specified,including centering,shuttering,etc.complete but excluding the cost of steel reinforcement.(Length of pile for payment shall be measured from top of the shoe to the bottom of the pile cap). 300 mm x200 mm piles.<br>Details of cost for 20m length of pile.(Based on DSR 20.5.1)<br>MATERIAL:<br>Concrete - 0.30 x 0.20 x 20 = 1.20 cum
OD12335/2022-2023:Driving and installing Pre-cast reinforced cement concrete piles of any size and length in M-25 cement concrete, etc.complete (Based on DSR 20.5.1)
OD12338/2022-2023:Providing,conveying,hoisting and fixing up to floor five level, precast reinforced cement concrete in slabs including setting in cement mortar 1:3(1 cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of reinforcement, with machine batched and machine mixed design mix M-25 grade cement concrete (based on DSR 5.16 )For precast slab(Higher) -- 2.20 x 1.10 x0.06 m Details of cost for one precast slab -- 2.0 x 0.9 x0.08 m Quantity of concrete(1: 1.5:3) = 2.0 x 0.90 x 0.08 =0.144 cum Area of form work: sides 2 x 2.0 x 0.08=0.32 sides 2 x 0.90 x 0.08 =0.144 Total area =0.464 sq.m Total area =0.396 sq.m
OD12337/2022-2023:Providing,conveying,hoisting and fixing up to floor five level, precast reinforced cement concrete in slabs including setting in cement mortar 1:3(1 cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of reinforcement, with machine batched and machine mixed design mix M-25 grade cement concrete (based on DSR 5.16 )<br>For precast slab(Lower) size -- 2.20 x 1.00 x0.08 m Quantity of concrete(1: 1.5:3) = 2.0 x 0.90 x 0.08 =0.144 cum Area of form work: sides 2 x 2.0 x 0.08 =0.32 sides 2 x 0.90 x 0.08 =0.144 Total area =0.464sq.m
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Bidder Name
P SURESH BABU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_755904.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .