Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹15,980
Closing Date
31 Aug 2026, 5:00 pmDue tomorrow
Office of XEN PMGSY Rajouri
Office of XEN PMGSY Rajouri
Permanent Restoration of road from L022-DHANIDHAR TO KAPAKHAH PKG.No.JK-12-402
2026_JKRRD_149292_1
EE/PMGSY/R/26 DT.21-08-2026
Open Tender
CIVIL
Percentage
Rajouri
Permanent Restoration of road from L022-DHANIDHAR TO KAPAKHAH PKG.No.JK-12-402
2 documents required · 2 mandatory
₹600
Yes
Office of XEN PMGSY Rajouri
₹15,980
Yes
Office of XEN PMGSY Rajouri
31 Aug 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavating for structure as per drawings and technical specifications clause 301.2 including setting out construction of shoring and bracing, removing of slupms and other delirious material and disposal upto lead of 50 mtr, dressing of sides and bottom and back filling in trenches with excavate suitable material including de-watering if any upto 3 mtr depth in all kinds of soil | 112.43 | Cum | 256.85 | ₹28,877.65 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.6 | Cum | 5,202.9 | ₹23,933.34 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (with 15% Boulder) | 8.55 | Cum | 5,014.24 | ₹42,871.75 |
| 4 | Polygonal/Random Rubble Masonry uncoursed brought to course in 1:6 fine sand mortar in foundation and plinth with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 71.49 | Cum | 5,402.9 | ₹3,86,253.32 |
| 5 | Polygonal/Random Rubble Masonry Laid Dry uncoursed brought to course in foundation and plinth With bond stone. | 42.83 | Cum | 3,262.6 | ₹1,39,737.16 |
| 6 | Providing and laying Coping/flooring 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 17.22 | Sqm | 416.5 | ₹7,172.13 |
| 7 | Back filling behind R/wall Abutment wing wall Return wall with available stone from earthwork complete as per drawing & technical specification clause 1204.3.8 labour rate. | 44.53 | Cum | 578.15 | ₹25,745.02 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings etc. mass concrete. | 9 | Cum | 286.35 | ₹2,577.15 |
| 10Carriage/consumption of material. | |||||
| 10.1 | Sand for an average distance of 140 km by MT | 33.66 | Cum | 1,734.74 | ₹58,391.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_234884.xls
BOQ • 1.02 MB
26.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].