Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 CrAdmitted-Finance | ₹8.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.8 Cr+₹67.8 L (8.36%)Admitted-Finance | ₹8.8 Cr+₹67.8 L (8.36%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SA Infrastructure Consutants Pvt. Ltd. L2 | Technocrats Advisory Services Pvt. Ltd. L1 |
|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | |||||
| 1.01 | Team Leader Cum Senior Highway Engineer (1 No) 1*10=10 | 10 | Man Months | 2,40,000 ₹24,00,000 Lowest | 2,76,000 ₹27,60,000 |
| 1.02 | Resident cum Highway Engineer (2 Nos) 2*10+1*60=80 | 80 | Man Months | 1,62,000 ₹1,29,60,000 Lowest | 2,16,000 ₹1,72,80,000 |
| 1.03 | Bridge /Structural Engineer (1 Nos) 1*10+1*15=25 | 25 | Man Months | 1,62,000 ₹40,50,000 Lowest | 2,04,000 ₹51,00,000 |
| 1.04 | Senior Pavement Specialist (1 No) 1*10=10 | 10 | Man Months | 1,62,000 ₹16,20,000 Lowest | 1,92,000 ₹19,20,000 |
| 1.05 | Senior Quality cum Material Expert (1 Nos)
(1*10)=10 | 10 | Man Months | 1,87,000 ₹18,70,000 Lowest | 1,92,000 ₹19,20,000 |
| 1.06 | Road Safety Expert (1 Nos)
1*7=7 | 7 | Man Months | 1,50,000 ₹10,50,000 | 1,25,000 ₹8,75,000 Lowest |
| 1.07Sub-Professional Staff | |||||
| 1.08 | Survey Engineer (2 Nos)
(2*10)=20 | 20 | Man Months | 70,000 ₹14,00,000 | 60,000 ₹12,00,000 Lowest |
| 1.09 | Assistant Highway Engineer (2 Nos.) 2*10=20 | 20 | Man Months | 70,000 ₹14,00,000 | 40,000 ₹8,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
24 Sept 2025, 3:00 pmClosed
Ankit Loyal
NHIDCL HQ, New Delhi
Consultancy Services as AE for Supervision of widening to 2 (Two) -lane with paved shoulder of Imphal to Jiribam section of NH-37 ( PKG-IV,V,VI,VII) in the state of Manipur on EPC mode
2025_NHIDC_874771_1
NHIDCL/Manipur/AE/I-J (Pkg-4, 5, 6 7)/NH-37/
Open Tender
Consultancy
Item Rate
2100 days
Manipur
Please refer tender Document
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
1 Dec 2025
26 Aug 2025
25 Sept 2025
27 Aug 2025
24 Sept 2025
18 Sept 2025
27 Aug 2025 - 8 Sept 2025
8 Sept 2025
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
Team Leader Cum Senior Highway Engineer (1 No) 1*10=10
Resident cum Highway Engineer (2 Nos) 2*10+1*60=80
Bridge /Structural Engineer (1 Nos) 1*10+1*15=25
Senior Pavement Specialist (1 No) 1*10=10
Senior Quality cum Material Expert (1 Nos) (1*10)=10
Road Safety Expert (1 Nos) 1*7=7
Sub-Professional Staff
Survey Engineer (2 Nos) (2*10)=20
Assistant Highway Engineer (2 Nos.) 2*10=20
Assistant Bridge Engineer (2 Nos) (2*10+1*30)=50
Assistant Quality cum Material Engineer (2 Nos) 2*10+1*30=50
Lab Technician (2 Nos) (2*10)=20
Quantity Surveyor (2 No) (2*10+1*30)=50
Support Staff (inclusive of per diem allowance)
Office Manager cum Accountant (2 No) (2*10+1*60)=80
Steno cum Computer Operator (2 No) (2*10+1*60)=80
Office Boy (1 No) (1*10+ 1*60)=70
Transportation (Fixed Costs)
Scorpio or equivalent 4X4 (not more than 2 years old) (1 nos during Construction Period), 1*10=10 Rate per month
Bolero or equivalent 4x4 vechile (not more than 2 years old) (3 nos during Construction Period and 1 no during Maintenance period/DLP), 3*10+1*60=90 Rate per month
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete
For 10 round trip to Employer's Head Office
For 10 round trip to Employer's regional office.
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
During Construction period (1 Nos) 1*10=10
During Maintenance /DLP period (1 No) 1*60=60
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
Office Supplies during construction period for 1offices 1*10=10
Office Supplies during Maintenance /DLP period for 1 office 1*60=60
Drafting Supplies during construction period for 1 offices 1*10=10
Drafting Supplies during Maintenance /DLP period for 1 office 1*60=60
Computer Running Costs during construction period for 1 offices 1*10=10
Computer Running Costs during Maintenance /DLP period for 1 office 1*60=60
Domestic and International Communication during construction period for 1 offices 1*10=10
Domestic and International Communication during Maintenance /DLP period for 1 office 1*60=60
Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,
During Construction period for 1 nos of offices 1*10=10
During Maintenance /DLP period for 1 no of office 1*60=60
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the Concession Agreement such as Completion Report
Road Survey Equipment
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro Reflectometer
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3287854)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .