| 1 | L1₹43.2 LAccepted-Finance LANE NO 03 PRAGATI VIHAR RISHIKESH | ₹43.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹46.5 L+₹3.3 L (7.56%)Accepted-Finance | ₹46.5 L+₹3.3 L (7.56%) | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical H NO 159 VILL AND P O BHAUWALA NEAR S N PUBLIC SCHOOL RAJAWALA ROAD DEHRADUN UTTARAKHAND 248007 | DEHRADUN | UTTARAKHAND | 248007 | - | - | Not Admitted-Fee/PreQual/Technical Others-Tender Fee and EMD NOT SUBMITTED IN ORIGINAL |
| Sl No | Description | Qty | Unit | Himalayan Power Solution Company L2 | KOTHARI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Tower No. 14 of 132 kV D/C Purkul–Jhajhra-Majra Line:- | |||||
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts. | 232.25 | m3 | 1,250 ₹2,90,312.5 | 825 ₹1,91,606.25 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ; 1 :2 :4 ( 1 Cement : 2 Coarse Sand :4 graded stone aggregate 20 mm nominal size ) (M15) | 114 | m3 | 18,500 ₹21,09,000 | 18,450 ₹21,03,300 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ; 1 :3 :6 ( 1 Cement :3 Coarse Sand :6 graded stone aggregate 20 mm nominal size ) (M10) | 8.4 | m3 | 15,500 ₹1,30,200 | 14,250 ₹1,19,700 Lowest |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (M20) | 6.25 | m3 | 22,500 ₹1,40,625 | 21,320 ₹1,33,250 Lowest |
| 6.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement :36Coarse Sand :12 graded stone aggregate 20 mm nominal size ) up to plinth level with Cement mortar1:6(1 Cement : 6 coarse sand) | 87.5 | m3 | 12,000 ₹10,50,000 | 10,850 ₹9,49,375 Lowest |
| 7.00 | MS Steel Bar (including supply) | 0.5 | MT | 95,000 ₹47,500 Lowest | 1,10,000 ₹55,000 |
| 8.00Tower Nos. 12Z-I of 132 kV S/C Purkul–Jhajhra Line & 12Z-II of 132 kV S/C Purkul–Majra Line:- | |||||
| 9.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts. | 60 | m3 | 1,250 ₹75,000 | 825 ₹49,500 Lowest |
| 10.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ; 1 :2 :4 ( 1 Cement : 2 Coarse Sand :4 graded stone aggregate 20 mm nominal size ) (M15) | 5 | m3 | 18,500 ₹92,500 | 18,450 ₹92,250 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
31 Dec 2025, 6:00 pmClosed
SE O AND M CIRCLE DDUN
SE O AND M CIRCLE DDUN
Work of Strengthening and repairing of Tower Foundations at Tower No 14 of 132 kV D C Purkul Jhajhra Majra Line Tower Nos 12Z I of 132 kV S C Purkul Jhajhra Line and 12Z II of 132 kV S C Purkul Majra Line and Tower No 16 of 132 kV S C Khodri Dhakr
2025_PTCUX_90294_1
T 59 SE O and M CR DDun 2025 26
Open Tender
Electrical Works
Item Wise
60 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EE O AND M DIV YAMUNA COLONY PTCUL DEHRADUN
₹1.3 L
23 May 2026
24 Dec 2025
2 Jan 2026
24 Dec 2025
31 Dec 2025
24 Dec 2025
Tower No. 14 of 132 kV D/C Purkul–Jhajhra-Majra Line:-
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ; 1 :2 :4 ( 1 Cement : 2 Coarse Sand :4 graded stone aggregate 20 mm nominal size ) (M15)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ; 1 :3 :6 ( 1 Cement :3 Coarse Sand :6 graded stone aggregate 20 mm nominal size ) (M10)
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (M20)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement :36Coarse Sand :12 graded stone aggregate 20 mm nominal size ) up to plinth level with Cement mortar1:6(1 Cement : 6 coarse sand)
MS Steel Bar (including supply)
Tower Nos. 12Z-I of 132 kV S/C Purkul–Jhajhra Line & 12Z-II of 132 kV S/C Purkul–Majra Line:-
Tower No. 16 132kV Khodri-Dhakrani Line:-
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ; 1 :2 :4 ( 1 Cement : 2 Coarse Sand :4 graded stone aggregate 20 mm nominal size ) (M15)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ; 1 :3 :6 ( 1 Cement :3 Coarse Sand :6 graded stone aggregate 20 mm nominal size ) (M10)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_106986.xls
BOQ • 0.28 MB
TENDERDOCT59.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .