Loading…
Loading…
Tender Value
₹12.1 L
EMD Value
₹13,000
Closing Date
8 Jun 2026, 6:00 pm3d left
Office of the Executive Engineer, Bhavnagar Irrigation Division, Bhavnagar
KHARO IRRIGATION SCHEME:-Improvement of Existing box culvert At Ch.270 mt of Kharo left bank feeder main canal (Second Attempt)
309652
3 For 2026-27
Open
Civil Works - Water Works
Bhavnagar
8 documents required · 7 mandatory · 1 optional
₹900
EXECUTIVE ENGINEER, BHAVNAGAR IRRIGATION DIVISION BHAVNAGAR
₹13,000
30 May 2026
30 May 2026
30 May 2026
8 Jun 2026
30 May 2026
e Quantit Rate In
specification and reference to book of Unit Amt.
m y figures
specifications)
ITEM NO.01
Dismantling of RCC work viz. slab, beam, lintel,
barrel, staircase, etc. including removing the steel
1 from the dismantled portion without damage to 15.045 Cum 1362.0000
reinforcement sorting and stacking of useful and
unuseful material from the dismantled material as
directed etc comp.
ITEM NO.02
Dismantling stone/brick masonry & stacking of
2 useful and unuseful material from the dismantled 40.25 Cum. 616.0000
materials as directed etc complete.
(a) In cement mortar
ITEM NO.03
Excavation in all sort of strata and formations incl.
depositing the unuseful excavated stuff as and
where directed incl sorting and stacking useful
materials as directed upto 30 mt lead etc.
complete incl. dewatering. ( Depth 0 TO 3.0 mt )
(For all type canal & foundation trenches of C.D.
ITEM NO.04
Prov. & Laying in position "NOMINAL MIX' cement
concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C. work
incl. necessary formworks centering scaffolding
compaction by mechanical vibrator,curing as
directed with all lead & lift etc complete
FOR GENERAL PURPOSE
C) Concrete 1:2:4 and MSA-40mm
(Reg. SOR 24-25 Pg No.24 It. No. 12-C)
ITEM NO.05
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed
aggregate by mass and machine mix for R.C.C/CC
work including necessary formworks centering
5 scaffolding compaction by mechanical vibrator, 54.70 Cum 5596.0000
curing as directed with all lead& lift etc complete
Excluding the cost of reinforcement FOR SOLID
SLAB OF ROAD BRIDGE , C) Concrete grade M-25
and MSA-20mm
(Reg. SOR 24-25 Pg No.26 It. No.20(c))
ITEM NO.06
Prov. & Laying in position "NOMINAL MIX' cement
concrete using cement, sand and crushed
6 aggregate by mass and machine mix for C.C. work 67.70 Cum. 4452.0000
incl. necessary formworks centering scaffolding
compaction by mechanical vibrator,curing as
directed with all lead & lift etc complete
E) Concrete grade 1: 1.5 :3 and MSA-20mm
(Reg. SOR 24-25 Pg No.24 It. No. 12E)
Providing, cutting, bending, binding and fixing in
position as per drawing. TMT BAR , reinforcement
for R.C.C. works and anchor bars incl cost of black
annealed 16 to 18 BWG M.S. Wire etc.complete
with all lead and lift.
(b) Fe-500 (Reg. SOR-24-25 Pg No. 21 It. No. R-1)
Item No:-8 Construction of Granular Sub Base
(GSB) by providing Well graded material of
grading-II, spreading in uniform layers on
8 prepared surface, mixing, watering and 10.00 Cum. 677.9400
compacting etc. complete as per specification or
as directed.
Type - A, "W" : Metal Beam Crash Barrier
(Providing and erecting a "W" metal beam crash
barrier comprising of 3 mm thick corrugated
sheet metal beam rail, 70 cm above road/ground
level, fixed on ISMC series channel vertical post,
9 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 8.00 Rmt 3468.3400
m high, 1.1 m below ground/road level, all steel
parts and fitments to be galvanised by hot dip
process, all fittings to conform to IS:1367 and
IS:1364, metal beam rail to be fixed on the vertical
post with a spacer of channel section 150 x 75 x
mm, 330 mm long complete as per clause 810)
ITEM NO.10
White washing with lime on wall surface (one
coats) to give an even shade including thoroughly
10 booming the surface to remove all dirt, dust; 144.00 Rmt. 5.9893
mortar drops and loose scales of lime wash and
other foreign matter. (R & B SOR-24-25 Pg No.128
It. Code. 18002 )
ITEM NO.11
Providing Photography and drone Videography of
11 the work as per the instruction of engineer in 1.00 Job 5000.0000
I/Weam/are willing to carry out the work at… ....................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(A)For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(in words)………………………………………………….………………………………………………...
(C)Net Tendered Amount (A-B) (in figure) ………………………………
(in words)………………………………………………….………………………………………………...
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labor cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
i.e 5449.00 /M.T mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Irrigation Sub Division no.1 Bhavnagar Irrigation Division
Palitana Bhavnagar
Signature of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Existing box culvert At Ch.270 mt of Kharo I S.pdf
BOQ-KIS.pdf
Tender Notice No.03 For 2026-27.pdf
Download all tender documents and submit your bid