Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | ₹1.3 L | L1 | Accepted-AOC FOUND SATISFACTORY |
| 2 | L2₹1.3 LRejected-AOC MALAYATTOOR NEELEESWARAM GP VILLAGE ROAD IMPROVEMENTS WARD 11 25 26 GENERAL CIVIL WORK 26 | KANNUR | KERALA | 670511 | ₹1.3 L | L2 | Rejected-AOC FOUND SATISFACTORY |
| Sl No | Description | Qty | Unit | V.P. VARGHESE L2 | SUNNY P J L1 |
|---|---|---|---|---|---|
| 1.00Compound Wall Construction and related works | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.04 | cum | 359.72 ₹1,092.83 | 359.07 ₹1,090.85 |
| 1.00 | OD268041/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site(modified 60.7.1) | 6.08 | cum | 3,993.46 ₹24,260.27 | 3,986.27 ₹24,216.59 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.01 | cum | 9,235.97 ₹9,356.04 | 9,219.35 ₹9,339.2 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 55.72 | kilogram | 112.43 ₹6,264.04 | 112.23 ₹6,252.89 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.5 | sqm | 386.16 ₹1,737.72 | 385.46 ₹1,734.57 |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 4.81 | cum | 6,831.14 ₹32,830.46 | 6,818.84 ₹32,771.35 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 82.16 | sqm | 369.76 ₹30,379.48 | 369.09 ₹30,324.43 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 82.16 | sqm | 80.85 ₹6,642.64 | 80.7 ₹6,630.31 |
| 1.01 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 82.16 | sqm | 172.88 ₹14,203.82 | 172.57 ₹14,178.35 |
Tender Value
Refer Docs
EMD Value
₹3,169
Closing Date
14 Oct 2025, 5:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER LID AND EW SECTION MALAYATTOOR NEELEESWARAM GP
Annual Plan Malayattoor GP Proj No 334 25 26 Compound wall construction in anganwadi ward no 3 General Civil Work Work 1
2025_LSGD_805665_3
3/AE/LSGD/MN/25-26
Open Tender
Civil Works - Buildings
MALAYATTOOR NEELEESWARAM GP
PREFER TENDER DETAILS
7 documents required · 7 mandatory
₹555
Yes
₹3,169
Yes
24 Jun 2026
6 Oct 2025
16 Oct 2025
6 Oct 2025
14 Oct 2025
6 Oct 2025
Amount
Compound Wall Construction and related works
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD268041/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(modified 60.7.1)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
V.P. VARGHESE (BID ID -2386189)
Bidder Name
V.P. VARGHESE
SUNNY P J
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid