Loading…
Loading…
Tender Value
₹5.2 L
EMD Value
₹6,510
Closing Date
25 Sept 2026, 5:00 pmClosed
Dr. Sunny Rao
Office of the Project Officer,WJ Area
Cleaning in escape route from 500 MH main line to belt TC06 discharge of length 70 mts and in 3A rise from 500 MH mainline to TC07 belt drive of length 60 mtr and Transportation of scrap materials lying in escape route and 3A rise junction to 50 mtr
2026_BCCL_365483_1
BCCL/WJA/MND/SUR/2026-27/20
Open Tender
Miscellaneous Works
Percentage
20 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹6,510
15 Sept 2026
15 Sept 2026
28 Sept 2026
15 Sept 2026
25 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning in escape route from 500 MH main line to belt TC06 discharge of length 70 mts and in 3A rise from 500 MH mainline to TC07 belt drive of length 60 mtr and Transportation of scrap materials lying in escape route and 3A rise junction to 50 mtr in near by old gallery in underground at Moonidih Colliery, W.J. Area. | |||||
| 1.01 | Cleaning in I)Cleaning in escape route from 500 MH main line to belt TC06 discharge of length 70 mts and in 3A rise from 500 MH mainline to TC07 belt drive of length 60 mtr
ii)3A rise from 500 MH mainline to TC-07 belt drive of length 60 Mtr
A)70 mtr x 2 mtr x 1 mtr=140 m³
B)60 mtr x 2 mtr x 1 mtr=120 m³
Total=260.0m³ | 260 | m³ | 1,078.2 | ₹2,80,332 |
| 1.02 | Transportation of scrap materials lying in escape rout and 3A rise junction to 50 mtr in near by old gallery 500 MH mainline Required no of trolley 1 base frame=1 trolle,3 motor=3 trolley,rollers(550/100)5.5 trolley,drum(7/2)=3.5 trolley,bracket (45/15)=3 trolley,Legpost(12/12)=1 trolley,rails/grider(17/10) =1.7 trolley,Belting(240/200)=1.2 trolley
Total Nos of trolley=19.9 Say 20 nos trolley | 20 | trolly | 8,625.6 | ₹1,72,512 |
| 1.03 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR | 1 | Units | 67,926.6 | ₹67,926.6 |
| 2CMPF | |||||
| 2.01 | CMPF, Pension and admin. Charge of Employee Un Skilled surface | 315 | hd | 275.26 | ₹86,706.9 |
| 3 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.59 MB
BOQ_378417.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .