Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical validated |
| 2 | Accepted-Technical | Accepted-Technical validated |
| 3 | Accepted-Technical 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | Accepted-Technical Validated |
| 4 | Accepted-Technical STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | Accepted-Technical validated |
| 5 | Accepted-Technical C 301 SHREE BALAJI RESIDENCY BEHIND SANGATH SILVER APARTMENT SABARMATI GANDHINAGAR HIGHWAY MOTERA AHMEDABAD 380005 | AHMEDABAD | AHMEDABAD | GUJARAT | 380005 | Accepted-Technical validated |
Tender Value
₹42 Cr
EMD Value
₹15 L
Closing Date
19 Jun 2026, 6:00 pmClosed
Chief Engineer Jodhpur Zone
HQ CE Jodhpur Zone MES Opp MH Hospital Rasala Road Jodhpur
PROVN OF OTM ACCN PH ONE OF TWO PHS AT AHMEDABAD CANTT
2025_MES_744410_1
800619/AMD/E8
Open Tender
Civil Works
Lump-sum
730 days
GE (A) Ahmedabad
PROVN OF OTM ACCN PH ONE OF TWO PHS AT AHMEDABAD CANTT
8 documents required · 8 mandatory
₹3,000
Yes
GE (A) AHMEDABAD
₹15 L
Yes
HQ CE Jodhpur Zone
22 Aug 2026
13 Dec 2025
26 Jun 2026
27 Mar 2026
19 Jun 2026
12 Jun 2026
13 Dec 2025 - 27 Dec 2025
29 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage (+ or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 29 to 30 | 1 | LUMP SUM | 39,21,68,600 | ₹39,21,68,600 |
| 2 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTH WORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 31 to 32 | 1 | LUMP SUM | 62,08,561.01 | ₹62,08,561.01 |
| 3 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY WORKS " as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 33 to 34 | 1 | LUMP SUM | 11,34,424.43 | ₹11,34,424.43 |
| 4 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 35 to 39 | 1 | LUMP SUM | 88,31,589.81 | ₹88,31,589.81 |
| 5 | Lump sum price worked out by the contractor for " ROAD/PATH/ CULVERT WORKS " as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 40 to 42 | 1 | LUMP SUM | 1,66,76,053.98 | ₹1,66,76,053.98 |
| 6 | Lump sum price worked out by the contractor for "AREA DRAINAGE WORKS" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 43 | 1 | LUMP SUM | 32,59,549.08 | ₹32,59,549.08 |
| 7 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL WORKS" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from Sl page No. 44 to 45 | 1 | LUMP SUM | 22,72,534.94 | ₹22,72,534.94 |
| 8 | Lump sum price worked out by the contractor for " COMPOUND WALL, FENCING AND GATE WORKS" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No.46 to 48 | 1 | LUMP SUM | 84,47,201.58 | ₹84,47,201.58 |
| - | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 49 | 1 | LUMP SUM | 3,03,074.76 | ₹3,03,074.76 |
| - | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 50 to 52 | 1 | LUMP SUM | 35,29,849.15 | ₹35,29,849.15 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TENDER800619.pdf
Tender Documents • 3.13 MB
BOQ_833540.xls
BOQ • 0.37 MB
ARGD2.pdf
Additional Documents • 15.13 MB
ARGDRG1.pdf
Additional Documents • 12.74 MB
ARGDRG3.pdf
Additional Documents • 18.11 MB
STRGDRG.PDF
Additional Documents • 18.30 MB
TDDRG.pdf
PDF • 11.59 MB
pdf_0005.pdf
PDF • 0.17 MB
12.pdf
PDF • 10.94 MB
123.pdf
PDF • 21.25 MB
800619DRG.pdf
PDF • 3.30 MB
tender800619.pdf
PDF • 13.73 MB
corrgno16800619.pdf
PDF • 0.16 MB
corrgno15800619.pdf
PDF • 0.16 MB
corrgno14800619.pdf
PDF • 0.16 MB
CorrNo13800619.pdf
PDF • 0.08 MB
corrgno12800619.pdf
PDF • 0.15 MB
CorrNo11800619.pdf
PDF • 0.09 MB
corrgno10800619.pdf
PDF • 9.63 MB
corrgno09800619.pdf
PDF • 0.15 MB
corrgno08800619.pdf
PDF • 0.15 MB
corrgno07800619.pdf
PDF • 0.85 MB
CorNo06800619.pdf
PDF • 1.00 MB
800619CorrNo05.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .