Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | L1 | Accepted-AOC L1 PARTY | |
| 2 | L2₹14.2 L+₹38,589.24 (2.80%)Rejected-AOC | L2 | Rejected-AOC L2 PARTY |
Tender Value
₹13.0 L
EMD Value
₹32,600
Closing Date
27 Feb 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HOU(TP/TSP)
KMML CHAVARA
Construction of interlock paved road connecting Barge unloading jetty and the road nearby. Area grading, compaction, providing GSB, Providing and laying 80 mm thick interlock pavement etc.
2023_KMML_555916_1
KMML/TP/PROJ/C/T/06/2022 Dated 25/01/23
Open Tender
Civil Works - Roads
Item Rate
60 days
KMML CHAVARA
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,950
₹32,600
13 Jul 2023
15 Feb 2023
28 Feb 2023
15 Feb 2023
27 Feb 2023
15 Feb 2023
15 Feb 2023 - 27 Feb 2023
Area clearing 2.2.2.A : Clearing and Grubbing Road Land<br> Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. <br> (II) By Mechanical Means <br> (A) In area of non-thorny jungle
2.3.A.2 : Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A.Lead upto 100 m(ii)Girth above 600 mm to 900 mm
Earth work excavation 3.5.3 : Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
3.15.2 : Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Granular Sub Base 4.1.A.1 : Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
Interlocking 55.23 : Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
Steel reinforcement cement grout applying for Kerb od257265/2022_2023 : Applying protective coating over steel reinforcement using cement grout as per direction of Engineer-in-charge including all material, labour charges etc. Cement grout shall be applied on reinforcement steel after thoroughly cleaning. painted area of steel shall be considered for payment.
Steel reinforcement for Kerb od258546/2022_2023 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level(The required reinforcement steel shall be supplied by KMML at our stores)<br>Thermo - Mechanically Treated bars of grade Fe-500D or more
Shuttering for kerb 5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
RCC For Kerb od313441/2022_2023 : Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of OPC/PPC Cement,centering, shuttering and finishing.<br>1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size)(The required OPC/PPC Shall be supplied by KMML at our store).
KURIAN KOSHY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .