The E.E.(O&M), Sachin Division
Tender for provide knowledge skill person and Overseers for 11kv/22kv underground Cable/Overhead line for HT cable route patrolling, cable safe guarding, cable fault joint pit excavation etc. work as per Instruction of Engineer in charge under Kansad(R) and OOn SDN Under Sachin Division.
273393
SD/O&M/EXP/26/658 Date:03.02.2026
Open
Manpower Supply
Service
Surat
6 documents required · 6 mandatory
₹1,180
Online Payment in DGVCL Sachin Division Account
₹20,000
5 Feb 2026
5 Feb 2026
5 Feb 2026
21 Feb 2026
5 Feb 2026
Sr.No. Description Page No.
1 Tender Notice
2 Qualifying Criteria
3 Special Condition Of Contract
4 Scope of Work
5 Terms & Conditions
6 Annexure A & B
Signature of Contractor
NOTICE INVITING TENDER
Tender No. SD/O&M/EXP/26/658 Date:03.02.2026
Executive Engineer, SACHIN DIVISION, Division Office invites On-line Tenders area of SACHIN
DIVISION. Tender Papers & Specifications may be downloaded from web site
https://tender.nprocure.com (To view, down load and on-line submission). Tender fee and
EMD paid online, for respective tender. “All the relevant documents of tenders to be submitted
Online only. Office addressed for any Inquiry Executive Engineer, Plot No-325, Road No-3,
GIDC Sachin, Near Palival Chokdi, Sachin-394230. “NO COURIER SERVICE OR HAND
DELIVERY” will be allowed.
SD/O&M/EXP/26/658
1 Tender No. / Type of Tender
Tender for provide knowledge skill person and Overseers
for 11kv/22kv underground Cable/Overhead line for HT
cable route patrolling, cable safe guarding, cable fault
joint pit excavation etc. work as per Instruction of
Engineer in charge under Kansad(R) and OOn SDN Under
Sachin Division.
3 Estimated Cost Rs.2228723.00
Tender Fees (Non Refundable) Rs.
5 Earnest Money Deposit Rs.
Date & Place of Pre-Bid Meeting
Last Date of On Line (E-Tendering) Date : 21.02.2026 on
submission of Tender Time : Up to 18.10 Hrs.
Last Date of Received of Tender Date : 21.02.2026 on
Fee & EMD online Time : Up to 18.10 Hrs.
Date of opening of Preliminary Date : 23.02.2026 on
Stage (Tender Fee & EMD) Time : Up to 10.30 Hrs.
Tentative Date of opening of Date : 23.02.2026 on
Technical Bid Time : Up to 11.00 Hrs.
Tentative Date of On line Opening Date : 23.02.2026 on
of Price Bid Time : Up to 11.30 Hrs.
12 Validity of Tender Maximum period of 180 Days
Work Completion Period / Time
13 12 Months from Date of Work order
Every Bidder has to inform their GSTIN No. at the time of payment of applicable fees.
a. Interested Bidders can view these tender documents online. The bidders who are
interested in bidding in these tenders can download tender documents from website
tender.nprocure.com
Signature of Contractor
Bidders, who wish to participate in this tender, will have to register on
tender.nprocure.com. Further, Bidders who wish to participate in online tenders will
have to procure Digital Certificate as per Information Technology Act-2000 using which
they can sign, their electronic bids. Bidders can procure the same from GNFC,
Ahmedabad, who are licensed certifying authority by Government of India and they will
assist them in procuring the same as below mentioned address. Bidders who already
have a valid Digital Certificate need not procure a new Digital Certificate.
n) Code solutions-A division of GNFC Ltd.,
301, GNFC Info tower, S.G. Road, Bodakdev
Ahmedabad – 380054 (Gujarat)
Email: [email protected]
b. All the bidders will be required to pay Tender Fee plus applicable GST as mentioned in
the Tender Document either in Cash (up to Rs. 10,000/- only) at the office address
specified in the tender documents or by RTGS / NEFT / Online.
c. If the EMD amount is more than Rs. 3.0 Lakhs, it should be paid either by RTGS / NEFT /
Online or Demand Draft or Banker’s Cheque or Pay order or Bank Guarantee. Otherwise,
it should be paid either in Cash (up to Rs. 10,000/- Only) at the office address specified
in the Tender Documents or by RTGS / NEFT / Online.
d. In case of payment of EMD is more than Rs. 3.0 Lakhs through Demand Draft or Banker’s
Cheque or Pay order or Bank Guarantee, the scanned copy of original documents shall
be uploaded in preliminary stage and original copy of the same will be submitted only by
Registered Post A.D. or Speed Post and same must be submitted on or Before Schedule
Date and time and ensure that Tender Number must be mentioned on the sealed cover.
Otherwise the offer will not be considered (at the sole discretion of SACHIN DIVISION)
and no any further communication in the matter will be entertained.
e. However, no physical documents required if payment of tender Fee and EMD made
through cash payment, RTGS & NEFT.
f. Further bidders are requested to submit price bid (Schedule: B) on-line only and not to
submit the price bid in physical form. This is mandatory. If price bid is submitted in
physical form, such offer shall be out rightly rejected.
g. It is mandatory for all the bidders to submit their tender documents with all relevant
documents as desired in participation of this bid through on-line (e-tendering) in
schedule time. If tender documents with all relevant documents submitted in physical
form, in that case the online submitted documents shall be considered.
h. Bidders should be in touch with websites https://tender.nprocure.com for intimation
regarding revision/corrigendum/Amendment in tender till due date of online
submission and thereafter. No separate information shall be sent in this regards and
also not publish in newspaper. The directives and amendments issued by SACHIN
DIVISION will have superseding effect to relevant section and specifications.
i. Any technical questions, information & clarification that may be required pertaining to
this inquiry should be referred to Executive Engineer, Division Office, “SACHIN DIVISION”
Plot No-325, Road No-3, GIDC Sachin, Near Palival Chokdi, Sachin-394230
Signature of Contractor
j. SACHIN DIVISION reserves the right to reject any OR all tenders without assigning any
reasons thereof.
k. Bank Details for Tender Fee and EMD Payment:
Performa of R.T.G.S. Details:-
Sr.N Particulars Requisite Details
1 Name of Bank BOB
Sachin-2(Hojiwala Estate), Surat
2 Name of Branch
3 IFSC Code BARB0SACHIN
4 Name of Account Dakshin Gujarat Vij Company Ltd
Sachin-2(Hojiwala Estate)
5 Account No(Cash
Credit Account)
Executive Engineer
Sachin Division Office, Surat
Download Tender Documents in (PDF Format) which consists of:
Instructions to Bidder
General Conditions of Contract
Schedule “B” indicating the quantities, rates & items, drawing if any.
Appendix and Annexure
Technical Specifications & GTP’s
To view the PDF file please use “Acrobat Reader” software which can be
downloaded from “Adobe “website.
Signature of Contractor
Qualifying Criteria
1. The bidder have to pay tender fee.
2. The bidder have to pay EMD.
3. Contractor should produce evidence of experience of having successfully completed similar
works during the last Seven years ending last day of month previous to the one in which
applications are invited should be either of the following in Govt., /Semi Govt., along with
certified copies of documentary evidence, preferably photo copy of orders secured from
DGVCL/MGVCL/UGVCL/PGVCL/GSECL/GETCO/DISCOMs/GEB/Central/State
Government/Semi-Government, private utilities involved in electricity distribution which has
to government approved licensee and satisfactory completion certificate from respective
department thereof:-
a) Three similar completed works costing not less than the amount equal to 40% of the
estimated cost.
b) Two similar completed works costing not less than the amount equal to 50% of the
estimated cost.
c) One similar completed works costing not less than the amount equal to 80% of the
estimated cost.
4. The bidder having P.F. code no. and PAN No. The copy of the same to be submitted.
5. The bidder have to submit the copy of latest solvency certificate issued by any
nationalized/schedule bank amounting 20% of estimated cost. The solvency certificate should
not be issued before 1 year from the scheduled date of opening of technical bid.
6. The bidder have to submit the copy of GST registration certificate.
7. The bidder have to be submit the copy of last three years I.T returns.
The Bidders shall submit documentary evidences in support of all above
Qualification criteria, failing which the bid will be rejected.
Following documents only are to be submitted in physical form:
1) Tender Fee and EMD Cover:
1. Tender fee , EMD, List of similar types orders executed as per mentioned in qualification
criteria, PF No, GST No, IT returns, PAN Card, Work completion details. DGVCL reserves
right to reject any OR all tenders without assigning any reasons thereof. (It is mandatory
for all bidders to upload scanned copies of original (Notarized/ Self Attested copies of
original- as specified in tender document) documents in online electronic forms (e-
tendering) in scheduled time with bid and physical documents not submitted in any
The price bid must be submitted strictly as per Schedule-B. The Price bid must be opened as
per the specified time and date of opening of the price bid.
Bidders shall submit Price physical form.
Above covers must be enclosed in a main cover duly sealed and duly super scribed the tender
for “Tender for provide knowledge skill person and Overseers for 11kv/22kv underground
cable / overhead line for HT cable route patrolling, cable safe guarding, cable fault joint pit
excavation etc. work as per Instruction of Engineer in charge Under Surat (Sachin) Division
under Sayan & Kosad s/dn under Sachin circle.” DGVCL at Surat. Any technical question,
information and clarification that may be required pertaining to this inquiry should be referred
to E.E. (O&M), Sachin Dn., Surat. DGVCL reserves the right to reject any or all tenders without
assigning any reasons thereof.
Signature of Contractor
The bidder must also submit the list of ongoing works along with name of owner, name of
work, order amount, commencement date, time limit, due date of completion and expected
date of completion.
The time limit of contract shall be 3 months from the date of start of services and is extendable
by the authority incase required by the DGVCL for further 3 months without obtaining of any
confirmation from contractor. The DGVCL reserves the right to terminate the contract at any
time without assigning any reasons by giving 30 days’ notice in written.
No tender shall be accepted / opened in any case after the due date and time of receipt of
tender, irrespective of delay due to postal services or any other reasons and the company shall
not assume any responsibility for late receipt of tender.
1. All taxes like welfare cess and any other taxes including works contract tax etc. in respect
of this contract and also any statutory variation in future towards above mentioned taxes &
any other taxes if levied in future by statutory authority applicable to the this contract shall
be payable by the contractor and DGVCL will not entertain any claim whatsoever in this
The rates will be "Excluding the GST'. The reimbursement against “GST" will be paid to the
contractor as per Govt., rules & regulations.
The proof of payment made by the contractor to the appropriate department shall be submitted
to DGVCL, failing which appropriate amount shall be withheld on getting information/instruction
from the concerned department.
If the successful bidder fails to submit a Security Deposit within 15 days after the date of LOI of
the contract or fails to sign the contract agreement, then the EMD amount will be forfeited by
Sachin DIVISION without any notice or proof of damages etc
Sr.No. Details. Nos.of persons.
1. Skilled Labours.
Total Persons: - 6 Nos
Labour shall be in Uniform with identity card of the company and behave with good
Signature of Contractor Executive Engineer (O&M)
With seal Sachin Division
Signature of Contractor
DGVCL Sachin Dn. office.
SPECIAL CONDITION OF CONTRACT:-
Tender for the work of:- “Tender for provide knowledge skill person and
Overseers for 11kv/22kv underground cable / overhead line for HT cable
route patrolling, cable safe guarding, cable fault joint pit excavation etc. work
as per Instruction of Engineer in charge Under Kansad(R) and OOn S/dn
under Sachin Division.’’
Name of Contractor:-___________________________
1. Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms and
conditions of the Tender contract for works as applicable and in default thereof forfeit and pay to
the DGVCL the sum of Money due.
2. The full value of the “Earnest Money deposit” paid herewith should be absolutely forfeited to
the DGVCL should I/we do not deposit the full amount of specified security deposit.
Executive Engineer (O&M)
Sachin Division
Signature of Contractor
DGVCL Sachin Dn. office.
NAME OF WORKS:- “Tender for provide knowledge skill person and Overseers
for 11kv/22kv underground cable /overhead line for HT cable route patrolling,
cable safe guarding, cable fault joint pit excavation etc. work as per
Instruction of Engineer in charge Under Kansad(R) and OOn S/dn under
Sachin Division under.’’
DGVCL shall pay the bill every month as per agreed rate plus Government GST applicable from
Income tax and other taxes, if any in respect of Contractor income arising from this contract, shall
be deducted at source as applicable. Contractor should quote GSTN in the tender form.
3. Terms of Payment
The contractor shall submit the bills with original within 5 days on completion of each month.
4. Price variation
No price variation is given on any rise or fall of material or labour prices. The rates quoted by the
contractor shall be based on the current price of material and labour
5. Security Deposit
1. The bidder has to pay Security Deposit 5% of the order value and it is to be paid in B.G /
D.D in favour of DAKSHIN GUJARAT VIJ COMPANY LTD., Surat on acceptance of order.
2. In case of any liability arising to the DGVCL on account of the default on your part in carrying
out various functions, the same will be deducted while refunding security deposit.
3. No interest shall be paid by the DGVCL on Security Deposit.
4. The S.D. shall be refunded after satisfactory completion of the contract. The DGVCL reserves
the right to recover any dues outstanding against the Tenderer from the S.D. or towards any loss
caused to the DGVCL owing to negligence or default of the Tenderer, his servants or agents. The
refund shall be done only on production of No Objection Certificate from the concerned officers.
6. Legal aspects
1. Agreement: As per company rules, contractor will have to enter into an agreement on Stamp
Paper of Rs. 300.00 with the company in prescribed format before execution of work. The cost of
stamp fees shall be borne by the Successful Tenderer.
2.The Tenderer will have to execute an Indemnity Bond on Stamp paper of Rs. 300/- at his cost
before commencement of order stating that for any accidents or damages to the contractor's
staff / equipments or any other persons/vehicle due to non observance of safety measures, DGVCL
shall not be responsible.
3. In case of any dispute or any discrepancy, the decision of the E.E (O&M),DGVCL Sachin will be
final and binding to the Tenderer.
4. The Tenderer must follow all the rules, regulations and enactment of the Labour Laws relating
to engagement of persons by him.
5. The contractor shall obtain comprehensive insurance policies for all his workers in respect of all
the insurable liabilities under the workman Compensation Act Fatal Accident, Personal Injuries Act,
Natural Hazardous, Riots/arson etc
6. The contractor shall obtain necessary license, registrations as legally required.
7. DGVCL shall entitle to recover full amount from contractor for expenses incurred on account of
compliance of any statutory provision or breach of contract.
8. The contractor shall not sublet the contract to any other party. If it is found, subletting the
contract, then S.D. will be forfeited and party will be black listed.
9. All disputes in connection with the Tender/Contract shall be subject to the jurisdiction of the
court situated at Surat.
8. Staff Employment:-
The contractor shall employ adequate number of experienced staff at office for daily supervision
and the maintenance of various registers and records required under the law and contract. The
maintenance for supervision shall be admissible.
9. Contractor to Indemnity the DGVCL Company:-
The contractor shall indemnity the Company & every member officer & employees of the Company
also. Engineer in charge his staff against proceedings claims, demands, and costs & expenses what
so ever arising out of or in connection with the matters referred herein above elsewhere & against
all actions. Proceedings claims, demand coats & expenses which may be made against the DGVCL
or Government for or in respect of or formance of his obligation under the contract documents.
The DGVCL shall not be liable for in respect of or in consequences of any accident or injury to any
workmen or other person in the employment of contractor or his sub contractor & the contractor
shall indemnity & keep indemnified The Company against all each damage & compensation &
against all claims , demands, proceedings costs, charges & expenses what so ever in respect
thereof in relation there to.
10. Work compensation & employer’s liability insurance:-
Insurance shall be affected for all the contractor’s employees engaged in the performance of his
contract if any of the work is subject the contractor shall require the sub contractor to provide
workmen’s employees unless such employees are covered under the contractor’s insurance.
11. Site visit: The bidder is advised to visit the site and examine the site conditions and the area.
Where in the work is proposed to be carried out and to get his acquainted himself on his own
responsibility for all information that may be necessary for quoting the tender bid and entering in
to contract. All cash and liabilities arising out of the site visit shall be at bidder account
12. Terms of payment: 100% payment will be released within 15 days after receipt of
certified Bills to our F&A team after fulfilling all technical and HR Compliances. You have
to submit all technical documents to our technical team & HR Compliances relevant
documents to our HR Team so that same can be forwarded to F&A team for further
14. The DGVCL reserves the right to terminate this date of contract at any time during its
pendency without giving notice of termination or any reasons thereof.
15. The DGVCL will be entitled to deduct directly from the bills, to be paid to the contractor any
sum payable by you & which sum / sums the DGVCL is required to pay a principal employer on
account of your default in respect of all liabilities referred to in above clauses.
16. Nothing in the contract document stated shall any wise constitute workmen/employee of the
contractor / subcontractor as or to be workman/ employee of the power, or place obligation or
liability in respect of any such workman/employee upon the DGVCL.
Note: The prevailing Act at the time of execution
1. The E.E (O&M), DGVCL Sachin reserves the right to reject any OR all the tenders without
assigning any reasons thereof.
2. PAN No. and GST may be shown separately (Xerox copy).
3. The Tenderer shall make his own arrangement for the Boarding and lodging of his
4 The contractor shall deploy only those personnel, who bear a good moral character,
Behavior, health and pleasing personality.
5. The Tenderer shall ensure that representative on his behalf deputed by him should be in
touch with E.E (O&M), DGVCL Sachin / DE (Tech-2) with regard to detailing of work etc.
6. The rates quoted by the Tender, the schedule of rates must include all charges of every
type such as Fuel, Levies, Maintenance, Repairs, or contractor’s servant / agent wages etc.
18. If the work carried out by the contractor is found satisfactory then the time limit may be
extended to three months as per the company rules. The decision of extension solely
remains with DGVCL, contractor has no right to claim for extension.
Signature of Contractor
The scope of work shall include but limited to patrolling surveillance coordination and site
interaction to prevent third party damages pertaining to DGVCL Underground network in area of
AllS/dn under Sachin Division
Supervision and control of manpower is with contractor and all wages and reimbursements will be
made by service provider labour directly
1) Contractor have to provide 4 Nos. of cable watcher to oversee the UG HT network for route
patrolling, cable safe guarding, cable fault joint pit excavation etc. For 30/31 days and also
Maintain the reliever to ensure that the working of each person should be 8 hours and 26 days.
2) The above rate for 8 hours working in shift schedule as per DGVCL Requirements., Man power
Deployment will be as per DGVCL Requirement, Contractor is bind to supply man power as per
DGVCL Requirement, DGVCL should intimate the requirement in advance.
3) The rate is including the payment of 4 national holidays per year (26 th January, 1th may, 15th
August ,& 2nd October ). In case your employee works with prior approval of DGVCL officer on
these national holidays you need to pay the wages as per statutory requirements (double
wages) & the same will be reimbursed by DGVCL.
4) You have to provide necessary PPE items: safety shoes, helmet, gloves, uniform & rain coats
5) Patrolling of cable routes for assignee sites by Engineer in charge
6) Supervision for joint pit/ Trial pit Excavation of cable fault.
7) Supervision during cable safe guarding activity.
8) Cable watcher must continuously present during HDD work and Excavation work on cable by
any external utilities and ask them to take care while excavation of their work.
9) Inspection of all Bridge/ Khadi by Cable watcher where cable network exist for prevention of
cable from fire.
10) If any excavation site found/abnormality found on route, Cable watcher will inform to JR.
Engineer Dy. Engineer and discuss with excavation agency at site, and share information of
cable route drawing, date etc. at site. Cable watcher will report immediately if any at site.
11) Agency has to provide and fix route marker after each and every excavation prior approval of
engineer in charge as per DGVCL norms.
12) During patrolling Cable watcher will note down site, route of excavation, name of agency, no.
of cable, condition of route makers & caution board and submit the information to engineer for
Planning and monitoring.
13) Cable watcher will report to concerned engineer daily in the morning & review the information
related to excavation site. Cable watcher will also submit detail report of visit in the evening/
next day morning to sectional head.
14) After Completion of open Excavation work at any utilities, Cable watcher remains present and
ensure the work to cover HT cable with RCC Half round muff and back filling in proper manner.
Patrolling of Every HT cable route assigned should be done in each shift for 365 days.
15) You have to the bill as per actual attendance of cable watcher.
16) Cable watcher must comply with the following terms:
a. Cable watcher’s should be skilled or trained person and Know detail of cable router.
b. Cable watcher must keep smart Mobile phone android with Watts App facility
c. Cable watcher must have a two wheeler motorbike with driving license, PUC and all
other necessary document for vehicle for filed visit. 30km travelling per day
d. Cable watcher must be ready to work during night hours (including working in all
shift duty as per DGVCL requirement).
17) Cable watcher shall carry out work as per DGVCL standard operating procedure.
18) Cable watcher must co-ordinate with other utility regarding their planning for excavation every
19) Cable watcher will report to concern engineer by telephonic and entry in register daily in the
morning and review the information related to excavation sites. He also shall submit report of
site visit detail at the end of every month to engineering charge.
20) You have to provide 4 nos. Overseers (workers) to oversee the UG transmission network and
over head line for route patrolling, cable safeguarding, cable fault joint pit excavation etc. for
30/31 days and also maintain the reliever to ensure that the working of each person should be
8 hours and 26 days (round the clock service , i.e.; in shift duty & general shift).
21) The rate is including the payment of 4 national holidays per year (26th January, 1st May, 15th
August & 2nd October). In case your employee works with prior approval of DGVCL on these
national holidays, you need to pay the wages as per the statutory requirements (double wages)
& the same will be reimbursed by DGVCL
22) You have to provide necessary PPE items: safety shoes, helmet, gloves, uniform & raincoat etc.
23) Patrolling of assigned Cable routes for every day.
24) Supervision and execution for joint pit/ trial pit Excavation of cable fault.
25) Supervision during cable safe guarding activity.
26) Overseer must continuous present during HDD work and Excavation work on cable by external
utilities and ask them to take care while execution of their work.
27) Inspection of all Bridge/Khadi by Overseer where cable network exist for prevention of cable
28) If any excavation site found / abnormality found on route, overseer will inform to deputed
Executive and Assistant Manager and discuss with the excavation agency at the site, and share
information of cable route drawing, data etc. at site. Overseer will report immediately if any at
29) During patrolling overseer will note down site, route of excavation, name of agency, no. of
cables, condition of route makers & caution Board and submit the information to engineer for
planning and monitoring.
30) Overseer will report to concerned engineer daily in the morning & review the information
related to excavation sites. Overseer will also submit detail report of visit in the evening/Next
Day morning to the sectional Head
31) After Completion of Open Excavation work at any Utilities, Overseer remains present and
ensures the work in proper manner with Pre cast and sand filling.
32) Every 11/22 KV cable route should be patrolling minimum twice in a day & Once in a night for
33) You have to raise the bill as per actual attendance of cable watcher. Additional penalty will be
applicable as above if the absent is more than 5% per month.
34) Overseer must comply with the following terms:
a. Overseers should be skilled or trained person and knows details of cable routes having
minimum 1 month experience.
b. Overseer must keep Smart Mobile Phone with Watts App and GPS Facility for
c. Overseer must have a two wheeler for field visit. Minimum 25 to 30 KM travelling per days
d. Overseer must be ready to work during night hours (shift duty as per DGVCL
e. Overseer must work after duty hours as per DGVCL requirement (Over Time charges will
35) You shall engage required contract workers (overseers). As per your own and independent
assessment/requirement. Including Supervisory for executing the contract work in conformity
with the best engineering practices/standards. Requirements of work contract provisions and
safety your workers shall have adequate qualification for execution of work at site.
36) You will be solely responsible for control in all respect over workers and directing them
monitoring their performance rewarding them or taking any disciplinary action.
37) You have to get access Cards for your workers issued before start of work/deployment of
workers at site You will ensure that you or your workers are allowed to work in DGVCL
premises/site on behalf of DGVCL with identity Card issued by DGVCL HR Department only.
38) Sub-contracting of work will not be permitted under any circumstances. However if the
contractor intends to outsource some part some part of the work being not of core
competencies the same shall be outsourced with prior written consent of DGVCL in such cases
DGVCL decision the sub-contracting be considered final.
39) You will abiding with all the applicable Govt. Rules and Regulations as they stand at present
and as may be amended from time in future for this work including E.S.I.,P.F
Workmanship Compensation Act Shop & Establishment Act Factories Act and Building &
other Construction Workers Regulation Act etc any non-compliance in adherence of
above Act/Law will at your cost and risk.
40) You shall maintain all registers, documents, certificates; statements, returns, etc. required
under various laws Government orders/notification application to the Contractors
41) Communication to DGVCL as per contingency plan in case of any accident during execution of
42) Your PAN No. & GST Registration No. Should be quoted on bill.
43) You will have to provide reconciliation of all material issued from DGVCL Stores along with the
excess and recovered material every week to concerned user and Store in charge You have to
return excess material to the DGVCL store However in case of material found short in
reconciliation the cost for the same will be deducted your bills.
44) You will be required to cover all your workers under Personal Accident Policy for Rs. 3, 00,000/-
per worker and submit the same to the DGVCL HR office at the time of reporting before
commencing of work.
45) You shall carry out the work based on latest state of art technology available for safe and
quality work. if you fail in providing safe working method environment as per DGVCL Safety
Rules and guidelines or your workers found in bad workmanship, incorrect and unsafe
procedures or not working as per the direction or SOW, DGVCL shall impose penal actions
including penalties as per penalty matrix attached with this order. Additionally, any non-
compliance by DGVCL office during work audit will also be subject to penal actions as per the
penalty matrix.
46) The contractor shall ensure that all the near misses occurred during execution of the contract
are reported time to time to DGVCL any hazard spotted while on job shall be reported to
DGVCL for further mitigation. In case of unsafe act, safety intervention shall be done by
contractor. Contractor shall also carry out the work place inspection of DGVCL’s working site.
Any incident / accident shall be reported to DGVCL as per incident reporting guidelines.
47) No child labour below 18yrs of age shall be employed by the contractor during the execution of
48) Contractor’s personnel shall not smoke or resort to misuse of drugs, medicines, tobacco or
alcohol while on duty. Contractor shall also ensure that in no case the ability of his employees
to carry out their assigned duty is impaired by use of the substances mentioned herein.
49) Safety aspects should be followed as per the norms of DGVCL.
50) Very high standard of OWNER’s health, safety & environment management system shall be
observed in the connected services by the contractor and workman engaged by the contractor.
51) Taxes including GST, if applicable, will be payable by the supplier in addition to Liquidated
Damages/ All penalties.
52) The DGVCL reserve the right to terminate this contract immediately, for any breach by the
contractor, of any terms and condition of this contract or for any reason deemed fit and proper
by the DGVCL without paying any compensation thereof with seven days notice period however
DGVCL is entailed for satisfactory services from contractor under this Contract beyond the said
notice period also, until alternate arrangement in this respect is made by the DGVCL.
53) Force Majeure: DGVCL shall not be in default if failure to perform any obligation hereunder is
caused solely by supervening conditions beyond the DGVCL reasonable control, including acts
of God, civil commotion, strikes, acts of terrorism, labor disputes and governmental or public
authority’s demands or requirements.
54) Acceptance of this order implies and includes acceptance of all terms and conditions
enumerated in this work order in the technical specification and drawings made available to
you consisting of general conditions, detailed scope of work, detailed technical specification &
detailed equipment, drawing.
1) OWNER can recover penalty amount from monthly invoices, if the CONTRACTOR
neglects to execute his duties as per the SOW&TS or unnecessary delays
completion of work during execution of CONTRACT. The amount of such recovery
shall be as shown below for the given parameters or mutually determined in
consideration of the consequence of CONTRACTORS’ neglect.
2) The following critical parameters describe the system performance and service level
expectations and requirements du implementation phase of CONTRACT. The service
level includes target performance measures, unacceptable measures and the related
penalties for not meeting required service levels.
3) DGVCL reserves the right to terminate the contract at any stage of non-compliance
Sr. Parameter Service Level Agreement Penalty
1 Attending Within City Limit Municipal a) 1% of monthly bill amount for non-
excavation area: Responding to total adherence to SLA.
intimation and intimations/ calls within 60 b) If consecutive 3 months of poor
closing call. minutes. For at least 97% performance is found CONTRACT
calls received in 1 month. may be subjected to termination
Other than municipal area: ( at the discretion of DGVCL)
Responding to total
calls within 120 minutes
least 97% calls received in
2 Under Ground No underground cable a) One time Labour wages per day on
Cable damage at all known sites. 1 incident in order.
damaged b) 1.5 time Labour wages per day on
2 incident in order.
c) 2.0 time Labour wages per day on
3rd and onwards incident in order.
d) CONTRACT may be subjected to
termination on frequency of
damage in order (at the discretion
3 Documentation Submission of patrolling a) Rs. 1000 if CONTRACTOR fails to
report, third party office submit reports in three consecutive
coordination report, damage working days in a month
visit report and third party b) Rs. 7000 if CONTRACTOR fails to
proactive calling report as submit reports for seven days
per DGVCL requirement consecutive working days in a
4 Providing Providing mobile phones to a) Rs.1000/- Per instance for up to
service for staff with internet NC’s
auxiliary scope connection, individual b) Continuous poor performance may
of CONTRACT vehicle with petrol, lead to termination of CONTRACT
providing camera,. (at the discretion of OWNER)
5 HSSE DGVCL’s life saver a) Rs. 500 per instance of non-
Compliance compliance compliance to DGVCL’s life savers
(restricted to one per day for same
6 Shortage of Nos. of person should have a) Per person 2 times of wages
manpower work in shift duty & general
shift as mentioned in
TERMS & CONDITIONS REGARDING URBAN LAWS & OTHER RELATED MATTERS.
1. Wages to be paid & time of payment etc. by the contractor:-
The contractor shall pay minimum of as per latest minimum wages act or as may be specified
hereafter or rates fixed under the minimum wages act whichever is higher. The wages of every
contract labour employed by him under this contract shall be paid by him before the expiry of 7 th
day of the last of the month in respect of which the wages are payable (i.e. wages of month have
to be paid him in the first week of the next month.) The payment shall be discharge in the
presence of Management representative during the working hours in factory premises & the
contractor shall get entries certificated in the register of wages by the representative of the Board.
Any default will result in cancellation of contract forthwith or else the contractor shall be
punishable to the extent of Rs. 100 / fine per each day.
2. LABOUR LAWS:-
Person below age of 18 years shall not be employed for the work.
No female worker shall be employed in the night shift between 7 p.m to 6 a.m
Contractor shall maintain a valid labour license under the contract labour (Regulation & abolition)
act for employing necessary manpower to be required by him. In the absence of such license the
contact shall comply with as under.
1. Payment of contribution by way of employer’s contribution towards provident fund, family
pension scheme, Deposit linked insurance scheme, Administrative charges etc. at the rates
applicable from time to time by Government of Gujarat / Government of India or other statutory
2. Payment of deposit in respect of each contract labour at the rate of Rs.30/ with the office of
frame there under of labour as per control labour. (Regulation & abolition) Act.
3. License fee as prescribed under the control labour (Regulation & abolition) Act & rules frame
there under depend upon the number of workmen employed by the contractor.
4. Paid leave facility & wages as per the provision of the factories act at the rate of one day for
every 20 days of working.
5. Identity cards as prescribed under the facilities act with photo affixed there to the same for
identification.
6. Payment of retrenchment compensation notice pay & other liabilities as per URBAN disputes Act.
Any payment to the contractor’s employees arising out of any claim or disputes under the URBAN
dispute act 1947 or any other labour laws.
7. Payment of compensation in case of accident injury.
8. Provision of ereche if the female labour employed are more than 30 numbers.
9. Maternity leaves as per the provision of maternity Benefit Act.
3. Provident fund & Family pension scheme:-
The contractor shall submit along with his bill (month wise) a statement regarding deductions
against employees provident fund & family pension scheme in respect of each concerned against
employee. Provident fund & family pension scheme at the rate of 8.33% (or at the rate made
applicable by the Government from time to time) of the wages. The contractor’s contribution & his
workers contribution towards provident fund, family pension scheme shall be deposited by the
contractor with Regional provident fund commissioner, Ahmedabad.
4. Deposit Link Insurance:-
The contractor shall have to deposit 0.5% of the wages in respect of employees who is a member
of the provident fund as the contribution to the Deposit link insurance scheme with Regional
provident fund commissioner, Ahmedabad.
5. Administrative charges:-
Administrative charges for monitoring provident fund A/C shall be deposited by the contractor with
Regional provident fund commissioner, Ahmedabad at the rates applicable.
6. Workmen’s compensation fund & employer’s liability Insurance :-
The contractor shall cover all his employees under workmen’s compensation fund & under the
liability insurance.
The contractor shall employ adequate number of experience staff at site for daily supervision & for
maintenance of various register & records required under the law & contract. No payment for
supervision shall be admissible.
7. Contractor to Indemnity the DGVCL Company :-
The contractor shall indemnity the Company & every member officer & employees of the Company
also. Engineer in charge his staff against proceedings claims, demands, and costs & expenses what
so ever arising out of or in connection with the matters referred herein above elsewhere & against
all actions. Proceedings claims, demand coats & expenses which may be made against the DGVCL
or Government for or in respect of or formance of his obligation under the contract documents.
The DGVCL shall not be liable for in respect of or in consequences of any accident or injury to any
workmen or other person in the employment of contractor or his sub contractor & the contractor
shall indemnity & keep indemnified The Company against all each damage & compensation &
against all claims , demands, proceedings costs, charges & expenses what so ever in respect
thereof in relation there to.
8. Work compensation & employer’s liability insurance:-
Insurance shall be affected for all the contractor’s employees engaged in the performance of his
contract if any of the work is subject the contractor shall require the sub contractor to provide
workmen’s employees unless such employees are covered under the contractor’s insurance.
The DGVCL reserves the right to terminate this date of contract at any time during its pendency
without giving notice of termination or any reasons thereof.
The DGVCL will be entitled to deduct directly from the bills, to be paid to the contractor any sum
payable by you & which sum / sums the DGVCL is required to pay a principal employer on account
of your default in respect of all liabilities referred to in above clauses.
9. For tracking and monitoring location and activity of cable watcher
Necessary software shell be design and developed by IT department, DGVCL corporate office,
and its access should be given all SDO and contractor
Signature of Contractor
Other Conditions
1. Contract booklet of DGVCL for general terms and condition of this work is available for reference
in the corporate office Surat and binding by the contractor. The contractor quoting for this tender
is deemed to have gone through this book of contract booklet and so will be treated as binding of
2. The successful contractor has to execute an agreement with the DGVCL on stamp paper in
prescribed Performa of the company. The cost of stamp paper are to be borne by the contractor.
3. The successful contractor has to give indemnity bond on stamp paper in prescribed Performa of
DGVCL. The cost of stamp papers is to be borne by the contractor.
4. The contractor employing more than 10 workmen on any day of preceding 6 months as contract
labour shall be required to obtain requisite license at his own cost from the appropriate licensing
officer before undertaking contract work. The contractor shall be solely liable and responsible for
the compliance with the required under the contractor labour(Abolition Regulation) Act 1970 and
rules there under.
Executive Engineer (O&M)
Sachin Division
Signature of Contractor
NAME OF WORK :- Tender for provide knowledge skill person and Overseers
for 11kv/22kv underground cable / overhead line for HT cable route
patrolling, cable safe guarding, cable fault joint pit excavation etc. work as
per Instruction of Engineer in charge Under Kansad(R) and OOn S/dn under
Surat (Sachin) Division.
Particulars Rate (Rs.)
No. compliances
[A] Basic + DA [A]
3 PF 12% BASIC,DA 12.00%
4 PF ADMIN. CHARGES 1.61% 1.16%
5 ESIC 4.75% BASIC,DA 4.75%
6 LEAVE WAGES BASIC,DA(1.75) 6.73%
4 Paid Hoiday (4 in a Year) 1.28%
8 BONUS 8.33 % BASIC ,DA (Max. 3500/-) 8.33%
[B] Statuory Charges [B]
10 SITE ALLOWANCE / Over Head Cost
11 PPE (Safety Shoes) 10.00%
12 Smart Mobile with Internet
13 Transportation (two Wheeler)
14 Other Charges (proff. Tax, LWF & Others)
15 Personnal Accident Policy @ 3,00,000
[C] Other Charges [C]
[D] Daily Wages [D]=[A+B+C]
16 Service Charges
Total Manpower Cost (Per Day)
Rates are excluding labour PF
1. Applicable GST shall be payable extra.
2. Payment will be made within 15 days after submission of bill as per availability of fund.
3. Duty hours 8 Hours (round the clock in shift duty and a general shift)
4. Labour must be in uniform and should behave in good manners.
5. Basic rate as per Gujarat Minimum Wages Act Rise in basic rate shall be applicable as per
change made by government.
Executive Engineer (O&M)
Sachin Division
Sub:- Tender for provide knowledge skill person and Overseers for 11kv/22kv
underground cable / overhead line for HT cable route patrolling, cable safe guarding, cable
fault joint pit excavation etc. work as per Instruction of Engineer in charge under
Kansad(R) and OOn s/dn under Sachin Division.
Sr No Descripton Qty Qty Unit Rate Days Amt
1 Tender for provide knowledge skill 3 3 Nos 928.75 365
person and Overseers for
11kv/22kv underground cable /
overhead line for HT cable route
patrolling, cable safe guarding,
cable fault joint pit excavation etc.
work as per Instruction of
Engineer in charge Under Surat
(Sachin) Division under Alls/dn
under Surat city circle.
2 Labour charge for excavation of 300 300 Mtr 109 1
cable trench of 600mm width x
1200mm depth, in any type of soil
for laying of cable of size up to
240 mm2 (For additional cable
200 mm additional width shall be
considered i.e. half trench length
is to be considered)
3 Labour charge for laying of 11kV / 300 300 Mtr 171 1
22 kV XLPE Cable of size up to
240 mm2 & preparation of sand
layer 100mm thick, in the cable
trench & covering the cable with
150 mm dia (Inner), thickness
mm, 1.0 meter long RCC half
round muffs and providing and
fixing of 4inch width yellow colour
polyethylene tape with printing
"CAUTION ELECTRIC CABLE
BELOW" at 0.75 m depth from
ground surface after laying cable
in trench. This will provide
indication that electric cable is
passing underground so as to
protect cable from mechnical
injuries, refilling the same, as per
Instruction of Engineer in Charge
4 Providing & fixing concrete stone 30 30 Nos 446 1
route marker of 300 mm width x
150 mm thick x 650 mm height
embedded in earth at least
mm below & 350 mm above
ground level respectively at
distance approx 50 meters along
the length of cable. The RCC
concreting (1:2:4)(all necessary
maeterials will be in bidder's
scope) of route marker is to be
carried out 300 mm width x
mm thick x 300 mm below ground
level as per instruction of EIC.
The route marker should be with
name of company with approved
yellow colour-DGVCL. The
distance from marker to cable and
cable depth with feeder name
etc., marked with arrow sign is to
be painted on it.The route marker
is to be fixed at location near to
any fixed permanent location (not
necessary to fix exact on top of
cable) as per instruction of EIC.
5 Extra working hour after 8 hour in 0 hour
emergecy situation suject to piror
approval of concern engineer in
charge (Pre Hours)
I am willing to carry out of work at -----------------------% above/Below.
(Including All Taxes as per Govt. & Company’s rules and regulation and Excluding GST)
Executive Engineer (O&M)
Sachin Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Knowledge Skill Person TENDER 658 03.02.2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .