Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.9 L+₹45,466.92 (7.06%)Admitted-Fee/PreQual/Technical/Finance | -9.00% | ₹6.9 L+₹45,466.92 (7.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Hard copy not submitted. |
Tender Value
₹7.6 L
EMD Value
₹15,160
Closing Date
29 Jul 2026, 4:00 pmClosed
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Laying and fitting of distribution pipe line and FHTC to each house hold under the up-gradation/retrofitting of WSS Wakha (Additional (scheme id 8317612) (under JJM).
2026_PWD_19203_12
Short E-tender- 45 of PHE Division Kargil of 2026-27
Open Tender
Pipes and Pipe related activities
Percentage
15 days
Wakha
Refer to NIT
3 documents required · 3 mandatory
₹76
Payable To Executive Engineer PHE Division Kargil
₹15,160
5 Aug 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed. | |||||
| 1.01 | All kind of soil 70% | 134 | Cum | 350 | ₹46,900 |
| 1.02 | Ordanary rock 25% | 47.8 | Cum | 550 | ₹26,290 |
| 1.03 | Hard Rock (by Chesling) 05% | 9.56 | Cum | 1,700 | ₹16,252 |
| 2Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: | |||||
| 2.01 | All kind of soil 70% | 315 | Cum | 350 | ₹1,10,250 |
| 2.02 | Ordanary rock 25% | 113 | Cum | 750 | ₹84,750 |
| 2.03 | Hard Rock (by Chesling) 05% | 22.5 | Cum | 1,800 | ₹40,500 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) nallah ncluding all carriage complete.. | 22.5 | Cum | 7,500 | ₹1,68,750 |
| 4 | Earth filling from barrow pits in place of hard rock protion and behind R/ wall as per the direction of site Engineer, Incharge Including carriage complete. | 45 | Cum | 350 | ₹15,750 |
stage.html
html • 0.02 MB
finance_45708.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.59 MB
BOQ_45708.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .