Loading…
Loading…
Tender Value
₹17.0 L
EMD Value
₹16,978
Closing Date
11 Jun 2026, 3:30 pm6d left
TENALI MUNICIPALITY
Tenali
Construction of outfall CC Drain from EP No. S/223/A4 towards chrisitan burial ground in nelapadu road ward no 2 of tenali municipality under 15th FC grant united 2025-26 1st installment
942315
07/2026-2027/15th FC
OPEN - NCB
Civil Engineering Works
GUNTUR
7 documents required · 5 mandatory · 2 optional
₹602
₹16,978
3 Jun 2026
3 Jun 2026
3 Jun 2026
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Collection and spreading of Sand including cost and conveyance of all materials to work site all labour charges and stacking to departmental guage etc., complete as per SS
Plain Cement concrete (1:4:8) using 40 mm HBG metal with concrete mixture including cost and convayance of all materials, labour charges, machine mixing charges, and curing charges etc., complete as per S.S.
VRCC M-20 Nominal mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering,t For Bed
VRCC M-20 Nominal mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering,t For Walls
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work as per SS and as Directed by the Departmental Authroties.( APSS No.126)
VRCC M-30 Nominal mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for culvert slabs
Vibrated cement concrete M 30 grade design mix using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification and as Directed by the Departmental Authroties.
Manufacture as per BIS: 12592 E.H.D.-35 with 560mm dia. Clear opening. (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P. F.O.R. destination including loading unloading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt Levies etc., as applicable. I.S.I Mark
Bailing out water from the trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps - 1 HP/Hr.
Carting away the surplus excavated earth from the work site with a lead of 2.00 Km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc. complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Document.doc
TENDER_DOCUMENT • 0.31 MB
drain nelapadu road.xlsx
TENDER_DOCUMENT • 0.90 MB
Download all tender documents and submit your bid