Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.1 LRejected-Finance | ₹3.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 LRejected-Finance | ₹3.1 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Champa Devi L2 | Chitar Singh L1 | Vikal Sood L3 |
|---|---|---|---|---|---|---|
| 1.00Providing and laying cement concrete 1:2:4 (1cement :2 sand :4 graded stone agg. 20mm nominal size) and curing complete excluding the cost of form work in | ||||||
| 1.01 | Foundation, footings, bases of columns and the like mass concrete in all leads and lifts. | 0.38 | Cum | 12,500 ₹4,750 | 11,999 ₹4,559.62 | 12,500 ₹4,750 |
| 1.02 | Walls any thickness but not less than 0.1 mtrs. thickness attached pillasters , plinths and string courses etc. from top of foundation level upto floor two level in all leads and lifts . | 0.5 | Cum | 13,900 ₹6,950 | 13,000 ₹6,500 | 14,000 ₹7,000 |
| 2.00 | Steel work rivetted in built up sections including cutting,hoisting, fixing,in position and applying a priming coat of red lead paint . In beams joists,channels angles,tees,flats with connectiong plates or angle cleats as in main and cross beams hip and jack rafters purlins connected to common raffers and the like in all leads and lifts . | 1,489.3 | Kg. | 199 ₹3.0 L | 190 ₹2.8 L | 200 ₹3.0 L |
Updated dates
Tender Value
₹2.3 L
EMD Value
₹4,662
Closing Date
1 Apr 2026, 11:00 amClosed
EE Jal Shakti Division Katrain
EE Jal Shakti Division Katrain
( SH-C/O Providing and fixing M.S. Grating over drain) under NABARD
2026_HPIPH_132224_23
EE Katrain 109561-600 dated 20.03.2026
Open Tender
Civil Works
60 days
Katrain
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
Yes
₹4,662
9 Apr 2026
23 Mar 2026
1 Apr 2026
23 Mar 2026
1 Apr 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Providing and laying cement concrete 1:2:4 (1cement :2 sand :4 graded stone agg. 20mm nominal size) and curing complete excluding the cost of form work in | - | - | - | - | itemH1Code1 | |
Foundation, footings, bases of columns and the like mass concrete in all leads and lifts. | 0.38 | Cum | - | - | itemH1Code2 | |
Walls any thickness but not less than 0.1 mtrs. thickness attached pillasters , plinths and string courses etc. from top of foundation level upto floor two level in all leads and lifts . | 0.5 | Cum | - | - | itemH1Code3 | |
Steel work rivetted in built up sections including cutting,hoisting, fixing,in position and applying a priming coat of red lead paint . In beams joists,channels angles,tees,flats with connectiong plates or angle cleats as in main and cross beams hip and jack rafters purlins connected to common raffers and the like in all leads and lifts . | 1,489.3 | Kg. | - | - | code1.05 |
stage.html
html • 0.04 MB
techsummary_195536.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Form8.pdf
Tender Documents • 1.19 MB
Form6.pdf
Tender Documents • 0.36 MB
Terms.pdf
Tender Documents • 0.12 MB
BOQ_195536.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid