Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹29.2 L+₹62,065.82 (2.17%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 3 | L3₹30.4 L+₹1.8 L (6.44%)Accepted-AOC | L3 | Accepted-AOC L3 | |
| 4 | L4₹32.0 L+₹3.5 L (12.2%)Accepted-AOC | L4 | Accepted-AOC L4 |
Tender Value
₹34.7 L
EMD Value
₹50,000
Closing Date
20 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Roads Division,Kasaragod
GENERAL-RM-2022-23 CLUSTER II One Year RC-Kanhangad Section RM 2022-23- Zone II -One year Running Contract for various PWD Roads under Roads section Kanhangad in Kasaragod district- in 8 road stretches for a length of 45.20km
2023_PWD_565120_1
D3-TD/37/E-tender/2022-23
Open Tender
Civil Works - Roads
Item Rate
365 days
Kasaragod
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹50,000
Yes
18 Apr 2023
9 Mar 2023
23 Mar 2023
9 Mar 2023
20 Mar 2023
9 Mar 2023
Amount
Appendix A - Initial Rectification
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
OD128767/2022-2023:Provding,laying and rolling of close-graded premix surfacing material 20mm thickness composed of 11.2 mm to 0.9 mm (type-A) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course om a previously prepared base, including mixing in a suitable plant , laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical specifications clause 509 of MORD
Appendix B- PRE-MONSOON WORKS
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means
OD128741/2022-2023:Engaging man mazdoor whenever required.
OD128742/2022-2023:Engaging Mate
OD128743/2022-2023:Engaging hydraulic excavator 0.9 cum capacity
OD128744/2022-2023:Engaging truck
Appendix C - Preventive Maintenance
5.11.b:Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous emulsion (SS) and water on a road surface including cleaning of the surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface. Type - II - (4 6 mm thickness) Filling of surface cracks 1 - 3 mm and preventive / renewal treatments.
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.
OD128746/2022-2023:Supplying ready mixed tar macadam pothole filler including all cost materials from trivandrum to PWD roads section office kanhangad( 50kg bag)
OD128747/2022-2023:CARRYING AND LAYING READY MIXED TAR MACADAM POTHOLE FILLER FROM PWD SECTION OFFICE STORE TO VARIOUS PWD ROADS INCLUDING ALL LABOUR AND CONVEYANCE CHARGES ETC COMPLETE(50kg bag)
OD256402/2022-2023:Engaging labour as per requirement for conducting/reporting routine inspections and to take neccessary instructions as applicable following the guidelines of running contract all along the route for a day of inspection covering entire reach specified in the agreement and as directed by the departmental officer at site
OD256403/2022-2023:Hiring of inspection vehicle; wherein charges applicable as per utilization per km run to and fro at a frequency as detailed in the guidance of running contract along the route convenient to cover entire reach specified in the agreement and as directed by the departmental officer at site.
Appendix D- Proactive Maintenance with Emergency Works
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
3.13.1.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
8.43:Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001
OD128769/2022-2023:Provding,laying and rolling of close-graded premix surfacing material 20mm thickness composed of 11.2 mm to 0.9 mm (type-A) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course om a previously prepared base, including mixing in a suitable plant , laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical specifications clause 509 of MORD
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
MOHAMMED KUNHI K
M.A IQBAL
M ABDHUL BASHEER
Bidder Name
M.A IQBAL
K.M AHAMMED
MOHAMMED KUNHI K
M ABDHUL BASHEER
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_833514.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .