Executive Engineer, Salinity Control Division, Porbandar
Providing Consultancy & other allied services for renovation & restoration work of canal network of Kalindri Irrigation Scheme in Taluka Kutiyana of District Porbandar.
305047
04 of 2026-27
Open
Civil Works - Others
Works
Porbandar
11 documents required · 9 mandatory · 2 optional
₹900
Executive Engineer, Salinity Control Division, Porbandar
₹20,000
14 May 2026
14 May 2026
14 May 2026
28 May 2026
14 May 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder, Conditions
of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to
provide a common basis for bidding. The basis of payment will be the actual quantities of work
ordered and carried out, as measured by the Contractor and verified by the Engineer and
valued at the rates and prices tendered in the priced Bill of Quantities, where applicable, and
otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it is
otherwise provided under the Contract, include all constructional plant, layout, supervision,
materials, erection, maintenance, insurance, profit, taxes and duties, together with all general
risks, liabilities and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities
are stated or not. The cost of Items against which Contractor has failed to enter a rate or price
shall be deemed to be covered by other rates and prices entered in the Bill of Quantities (in
case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the items
provided in the priced Bill of Quantities, and where no Items are provided the cost shall be
deemed to be distributed among the rates and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated or
summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill of
8. The method of completed work of payment shall be in accordance with the specification for
Road and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to Clause
of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting, or the
use of metal wedges and sledgehammers, or the use of compressed air drilling for its removal,
and which cannot be extracted by ripping with a tractor of at least 150 kw with a single rear
mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with brief Quantity Unit Rate in Amount
No. specification and reference to Figures
book of specifications)
1 Survey of V.R.B, syphone, 4.00 Per 45,000.00
Aqueduct, H.R & C.R. Gate, Outlet, Structure
Pipe Drain with fixing TBM At
least two nos. including Contour
and prepare Data sheet provided
by Engineer in charge with
Submission The Same including
Transportation, Labour Charge etc
2 Carrying out detailed 15.00 Per 25,000.00
topographical Survey of canal Km.
using total station and taking cross
section detail at 30 m interval on
straight canal and 10 m on curve
and for same prepare plan in
which cover all details like as
canal dimensions, side road detail,
Right of way, tree, electric pole,
structure boundary and etc.
including preparing L/S & C/S,
level sheet with all necessary
calculation of cutting/ filling as
per proposed cross section and
instruction of Engineer in charge.
with Submission The Same
including Transportation, Labour
Charge etc Complete.
5B) Width between 5.0 M to 10 M
3 Preparing Hydraulics and 3.00 Per 1,62,000.00
structure Desing as per relevant No.
codal Provision of H.R & C.R gate
Desing with Submission The Same
& Approval from Concern
Authority including
Transportation, Labour Charge
etc. Complete. (Excluding Soil Test
(8A) Below 20 Lac
(8B) Between 20 Lac to 50 Lac. 1.00 Per No. 1,73,000.00
4 Preparing Hydraulics and 1,50,00,000.00 % of total 1.50
structure Desing as per relevant estimated
codal Provision of V.R.B., Syphon, value
Aqueduct, Pipe Drain, Culverts etc.
with Submission The Same &
Approval from Concern Authority
including Transportation, Labour
Charge etc. Complete. (Excluding
5 Preparing Estimate, Technical 2,50,00,000.00 % of total 1.50
Sanction (TS), Draft Tender Paper estimated
(DTP) including Technical value
Specification, Item wise
Specification Rate Analysis,
Tender Papers of V.R.B, Syphon,
Aqueduct, H.R. & C.R Gate, Outlet,
Pipe drain, Culvert etc. & Approval
up to Draft Tender paper form
Concern Authority with
Submission in Hard Copies The
Same as per Instruction of
Engineer in Charge (9D) Above
6 Drilling 100 mm dia. bore hole in 10.00 Rmt. 6,500.00
all type of soil strata by machine
drilled method collecting
undisturbed/disturbed soil
sample and performing SPT test,
maximum up to 20 mt. Depth on
ground surface including
mobilization, conveyance, loading
and boarding, computation of SBC
Reporting charges etc. complete.
Including submission of Soft Copy
& 02 hard copy of result
(A) For all type soil
(B) For Soft & Hard Rock 10.00 Rmt. 10,000.00
In words ((Rupees Nineteen Lac Seventy Nine Thousand Only)
Note- Rates are including GST. Bidder should quote his rates accordingly.
I/We am/are willing to carry out the work % above/below percent (Should be written in
figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
In words In words
Signature of Contractor Executive Engineer
Salinity Control Division
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
specification and In In
reference to book of figures Words
specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure)
(C) Net Tendered Amount (A-B) (in figure)
(in . Ex. Engi.
1 The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
as per Govt. G.R. PRC-10/2017 Cement Consumption/16/C Date:- 11/05/2017 as
stated in S.O.R. therefore in R.C.C. items where is a change as per actual mix design
the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
5 The rates to be quoted by the contractor must be inclusive of all duties, taxes, and
other levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
04 of 2026-27.pdf
NEW SBD-Canal survey by consultant.-Kalindri.pdf
BOQ Canal survey by consultant.-Kalindri.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .