Loading…
Loading…
Tender Value
₹5.6 L
EMD Value
₹11,219
Closing Date
18 Jun 2026, 3:00 pmClosed
The Executive Engineer, DIV-I, AMC
o/o the Executive Engineer, DIV-I, AMC
Improvement of open area by decorative paver block in Western Club Shib Sani Kalimandir at A.K. Road under Ward No-35, AMC.
2026_SAMC_73711_1
19/EE/DIV-I/AMC/2026-27
Open Tender
Civil Works
Percentage
60 days
Agartala
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
₹11,219
12 Jun 2026
12 Jun 2026
18 Jun 2026
12 Jun 2026
18 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) includingdressing of sides and ramming of bottoms, lift upto 1.5 m,including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | 1 | cum | 231.6 | ₹231.37 |
| 2 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I Sand filling | - | cum | 1,177.3 | - |
| 3 | Providing and laying dry flat brick flooring in required pattern complete. | - | sqm | 701.2 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | 10,570.6 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level:- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 1 | cum | 11,693.5 | ₹11,681.81 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or
more | - | kg | 103.9 | - |
| 7 | First class brick work in foundation and plinth
including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | cum | 9,845.2 | - |
| 8 | Providing and fixing Marble stone in floors over 20 mm thick bed of cement mortar 1 : 4 ( 1 cement : 4 fine sand) jointed with ordinary cement slurry including pointing with white cement mixed with of matching shade,
including rubbing and polishing etc. all complete as per direction of Engineer-in-charge. 14 mm thick Marble stone Agaria White marble | - | sqm | 2,531.1 | - |
| 9 | 60 mm thick factory made c.c. interlocking paver block of M-35 GradeProviding and laying factory made coloured chamfered edge
Cement Concrete paver blocks of required strength, thickness &size/ shape, made by table vibratory method using PU mould, laidin required colour & pattern over 50 mm thick compacted bed ofsand, compacting and proper embedding/laying of inter lockingpaver blocks into the sand bedding layer through vibratorycompaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern,finishing and sweeping extra sand in footpath, parks, lawns, driveways or light traffic parking etc. complete as per specifications &
approval/ direction of Engineer-in-Charge. | - | sqm | 1,264.6 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
DNIT19ShibSaniKaliMandir.pdf
Tender Documents • 4.06 MB
BOQ_75019.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .