Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹27.8 L
EMD Value
₹28,000
Closing Date
7 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
Appointing Agency for providing services of Skilled & Unskilled staff, for Operation & Maintenance of Canal Gate & Irrigation management in the command of Karjan Right Bank Main Canal, under jurisdiction of Irrigation Project Sub Division no. 29, Rajpipla during Irrigation Season 2026-27
367825
32 of 202627
Open
Civil - All
Works
Narmada
9 documents required · 8 mandatory · 1 optional
₹1,500
Executive Engineer Irrigation Project Dn. No.4
₹28,000
23 Nov 2026
23 Nov 2026
23 Nov 2026
7 Dec 2026
23 Nov 2026
120 days
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
aregiventoprovidea commonbasisforbidding.Thebasisofpayment willbethe actual
quantities of work ordered and carried out, as measured by the Contractor and
verified by the Engineer and valued at the rates and prices tendered in the
pricedBill of Quantities, where applicable, andotherwise at such rates andprices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in sofar
as it is otherwise provided under the Contract, include all constructionalplant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. TheratesandpricesshallbequotedentirelyinIndianCurrency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complyingwith the provisions ofthe Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuantto
Clause29oftheInstructionsto Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item DescriptionofItem(withbrief Quantity Unit RateIn Amount
No specification and reference to figures
book of specifications)
Providing services of Skilled staff, for
Operation & Maintenance of Canal Gate
& Irrigation management in the Man- 665.88
command of Karjan Right Bank main
Canal, under jurisdiction of IPSD No.-
Providing services of Unskilled staff,
for Operation & Maintenance of Canal
Gate & Irrigation management in the 3600 Man- 639.718
2 command of Karjan Right Bank Main days
Canal, under jurisdiction of IPSD No.-
I/Weam/arewillingtocarryouttheworkat… ............................... %above/belowpercent
bewritteninfiguresandwords)oftheestimatedratementionedabove.Amountofmy/our
tender works out as under.
Service charge should be 3.85% or above.
Estimatedamountputto tender Estimatedamountputto tender
Deduct………%below Add………%Above
Inwords Inwords
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
andreferencetobookof In In
specifications) figures Words
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)……………………………… (in
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with brief details of work asdirected by the
Engineer-In-Charge for which no extra payment shall be made.
2 Thelabourcesswillbe deductedasperprevailingrulesi.e.1%ofthework done.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsof bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R. NO.: MIS102010/17/K1 Dated:30/07/2018asstatedin
S.O.R.thereforeinR.C.C.itemswherethereisachangeasperactualmixdesignthecost of
difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Irrigation Project Subdivision No. 29 Irrigation Project Division No.
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT manpower.pdf
SBD manpower 29.pdf
tech spe manpower.pdf
BOQ manpower.pdf
spe condition manpower.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .