| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.8 LAccepted-AOC | ₹41.8 L | L1 | Accepted-AOC Agreement executed vide agreement no.376/25-26 |
| 2 | L2₹42.7 L+₹87,663.09 (2.10%)Rejected-Finance | ₹42.7 L+₹87,663.09 (2.10%) | L2 | Rejected-Finance Agreement executed by L1,hence L2 is rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical L6 |
| 4 | Rejected-Technical NEREVEETTIL HOUSE THRIKKAKARA P O KOCHI 682 021 | ERNAKULAM | KERALA | 682021 | - | - | Rejected-Technical L7 |
| 5 | Rejected-Technical ATHIRA MA THRIKKAKARA MUNICIPALITY KAKKANAD | THRISSUR | KERALA | 680667 | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | N J THOMAS L7 | A.M.ABDUL SALAM L2 | SABU V E L4 | SALIM V M L5 | PRABHUKUMAR CONSTRUCTIONS L3 | sirajudheen L1 | AFKAR T ABDUL RAHIMAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00building | ||||||||||
| 1.00 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. | 854.4 | kg | 3.8 ₹3,246.72 | 3.23 ₹2,759.71 | 3 ₹2,563.2 | 3.44 ₹2,939.14 | 2 ₹1,708.8 Lowest | 3.99 ₹3,409.06 | 3.71 ₹3,169.82 |
| 1.00 | 15.1:Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer - in- Charge. | 20 | cum | 810 ₹16,200 | 712.13 ₹14,242.6 | 500 ₹10,000 | 758.78 ₹15,175.6 | 200 ₹4,000 Lowest | 880.26 ₹17,605.2 | 818.55 ₹16,371 |
| 1.00 | 15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet | 150 | sqm | 73 ₹10,950 | 64.55 ₹9,682.5 | 45 ₹6,750 Lowest | 68.93 ₹10,339.5 | 60 ₹9,000 | 79.97 ₹11,995.5 | 74.36 ₹11,154 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 146.64 | cum | 250 ₹36,660 | 208.42 ₹30,562.71 | 130 ₹19,063.2 Lowest | 222.08 ₹32,565.81 | 250 ₹36,660 | 257.63 ₹37,778.86 | 239.57 ₹35,130.54 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 31.51 | cum | 7,185 ₹2,26,370.61 | 6,417.71 ₹2,02,196.37 | 6,000 ₹1,89,036 Lowest | 6,838.15 ₹2,15,442.75 | 7,000 ₹2,20,542 | 7,932.89 ₹2,49,933.63 | 7,376.79 ₹2,32,413.15 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 41.69 | cum | 9,545 ₹3,97,931.05 | 8,485.41 ₹3,53,756.74 Lowest | 9,500 ₹3,96,055 | 9,041.32 ₹3,76,932.63 | 9,000 ₹3,75,210 | 10,488.77 ₹4,37,276.82 | 9,753.51 ₹4,06,623.83 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.69 | cum | 11,622 ₹1,24,262.42 | 10,332.69 ₹1,10,477.12 | 10,000 ₹1,06,920 Lowest | 11,009.62 ₹1,17,714.86 | 12,000 ₹1,28,304 | 12,772.18 ₹1,36,560.15 | 11,876.85 ₹1,26,987.28 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 43.36 | cum | 12,232 ₹5,30,403.98 | 10,874.69 ₹4,71,548.31 Lowest | 11,000 ₹4,76,982 | 11,587.12 ₹5,02,440.7 | 12,000 ₹5,20,344 | 13,442.14 ₹5,82,878.07 | 12,499.85 ₹5,42,018.5 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 189.6 | sqm | 350 ₹66,360 | 312.4 ₹59,231.04 | 250 ₹47,400 Lowest | 332.87 ₹63,112.15 | 370 ₹70,152 | 386.16 ₹73,215.94 | 359.09 ₹68,083.46 |
Tender Value
₹52.8 L
EMD Value
₹50,000
Closing Date
11 Aug 2025, 6:00 pmClosed
THE ASSISTANT EXECUTIVE ENGINEER
O/o THE ASSISTANT EXECUTIVE ENGINEER,THRIKKAKARA MUNICIPALITY
Ward-8 -Proj NO -323/2025-26 Thrikkakara Muncipality - Construction of new building block at GHS Thenghodu
2025_LSGD_779216_19
LIDEW/AEE/ET/27/2025
Open Tender
Civil Works - Others
Item Rate
180 days
THRIKKAKARA
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
Yes
12 Jun 2026
2 Aug 2025
13 Aug 2025
2 Aug 2025
11 Aug 2025
2 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1281941.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .