Loading…
Loading…
Tender ID
Tender Value
₹9.2 L
EMD Value
₹9,250
Closing Date
6 Feb 2026, 4:00 pmClosed
Superintending Engineer, Transmission Circle GETCO Jambuva
Work of Painting of structures and foundations of various KV Class equipment and Gantry in Switchyard with supply of approved make Distemper paint and Anti rusting black paint at 220KV Chandrapura S/S under Godhra AM division & 400KV Asoj S/S under Jambuva AM Division under Jambuva Circle
265606
JTC / 25-26 /n- 239
Open
Electrical
Works
Vadodara
13 documents required · 13 mandatory
₹590
Yes
Gujarat Energy Transmission Corporation Limited
₹9,250
Yes
16 Jan 2026
16 Jan 2026
16 Jan 2026
6 Feb 2026
16 Jan 2026
Name of work : Work of Painting of structures and foundations of various KV Class equipment and
Gantry in Switchyard with supply of approved make Distemper paint and Anti rusting black paint at 220KV
Chandrapura S/S under Godhra AM division & 400KV Asoj S/S under Jambuva AM Division under
TECHNICAL SPECIFICATION
( TO BE SUBMITTED ONLINE through N-Code
Web site - https://tender.nprocure.com )
Seal & Signature of Bidder
TENDER NOTICE No –JTC/25-26/n-239
Superintending Engineer, Transmission Circle GETCO Jambuva ( Address of the office - Gujarat Energy Transmission
Corporation Limited, Circle Office, 220kv Jambuva sub-station compound, N.H. No-8, PO:- Jambuva, Tal & Dist:
Vadodara.-390 014 ) invites “On line Tenders” (e-tendering) for the purchase/ works of following items. Tender Papers
& Specifications may be down loaded from Web site https://tender.nprocure.com (For view, down load and on line
submission) and GUVNL/GETCO web site www.guvnl.com (For View & download only).
All tender documents, scanned copies of original documents (Notarized / self-attested copies of original – as
specified in tender document) along with scan copy of transaction slip of payment made through RTGS/NEFT
for Tender Fee & EMD shall be unloaded through on line only ( which is mandatory) on (n) procure portal.
Bidders shall compulsorily pay tender fee and EMD through RTGS/NEFT only. No any physical documents,
Demand Draft / Banker’s cheque or Pay order for tender fee and EMD to be submitted by bidders.
All the bidders, in respect of tender item must have vendor registration with the GETCO or their any subsidiary
company viz. prior to the date of opening of technical bid of the tender, otherwise their bids will not be considered
eligible for technical scrutiny and their technical bids will not be opened.
Sr. Description
1 Tender No.: JTC / 25-26 /n-
2 Purchase/Work of Work of Painting of structures and foundations of various
KV Class equipment and Gantry in Switchyard with
supply of approved make Distemper paint and Anti
rusting black paint at 220KV Chandrapura S/S under
Godhra AM division & 400KV Asoj S/S under Jambuva
AM Division under Jambuva Circle
3 Tender Fee (non-refundable) Rs. 590.00 ( Rs. 500.00 + GST Rs.90 .00 )
4 Estimated cost inclusive GST in Rs. Lacs Rs.
5 Earnest Money Deposit amount in Rs. Rs.
6 On line (E-tendering) tender/ offer submission last 06.02.2026
date up to 16.00 hours only (This is mandatory)
7 Date of opening online technical bid at 16:10 06.02.2026
8 Tentative Date of on – line opening of Price bid, (if Shall be intimated separately.
possible), at 11.00 Hours
9 Prices Firm Basis
10 Validity of offer 180 Days
11 Time limit 45 Days
12 Appropriate / Registration Class GETCO registered contractor of any class
1 All tender documents, scanned copies of original (Notarized / self-attested copies of original – as specified in
tender document) documents along with scan copy of transaction slip of payment made through RTGS/NEFT
for Tender Fee & EMD shall be uploaded through on line only (which is mandatory) on (n) procure Portal. No
any physical documents , Demand Draft / Banker’s cheque or Pay order for tender fee and EMD will be
2. Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on or before due date
and time of submission of tender .Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay
order will not be accepted and no any further communication in the matter will be entertained.
3. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in scheduled time.
4. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain legible
(readable) and should not be password protected.
Seal & Signature of Bidder
5. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on bidder’s letterhead),
Tender acceptance letter (on bidder’s letterhead), price bid, tender documents specified in the tender must
be submitted through online on n-procure portal (mandatory) (All the documents to be duly self attested by
the bidder). For any differences or wrong entry bidder shall be sole responsible for that documents.
6. Tender will be evaluated on the basis of Data / Details / Documents submitted by the bidders though online
7. The bidders are required to upload complete technical bid duly filled, sealed & signed by bidder ( all the
appendices (annexure)/forms etc). This is intended for transparency and speedy evaluation of the bids.
Instead of simply confirming/attached in bid/refer physical offer, the bidder shall fill in the particulars against
appropriate place in respect of each line appearing in Technical bid (In the absence of required details in
uploaded tender documents, technical bid , the purchaser has every right to evaluate the bids accordingly and
bidder cannot raise any objection against any point during evaluation).
8. In case of short submission of documents with bid and / or clarification if any required from the bidder,the
required details / documents may be asked from the bidder in physical form.
9. Payment of Tender Fee and Earnest Money Deposit (EMD ) : The EMD and Tender fee plus GST as
applicable shall be paid through RTGS/NEFT only .
1) Payment of Tender fee , EMD through RTGS/NEFT : For the payment through RTGS/NEFT the scan
copy of payment made (transaction slip of payment made) shall be uploaded online with the Tender
documents on n-procure portal.
2) Bidder has to provide following detail on the same date of payment made so that receipt can be
generated at below mentioned e-mail ids:
Sr. No. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
8 GST Registration No.
3) GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of Account GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
12. Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will not be accepted. Also,
Tender fee and EMD received after due date and time as specified in the tender will not be accepted/opened
irrespective of delay due to any reasons and the Corporation shall not assume any responsibility for late receipt
13. Tender without EMD and tender fee plus GST as applicable shall be rejected.
14. Bidders are requested to remain in touch with the n-procure portal for any amendment/corrigendum or
extension of due date etc.
15. The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason thereof.
Any technical questions, information and clarification that may be required pertaining to this enquiry should be
referred to: The Superintending Engineer (TR), Gujarat Energy Transmission Corporation Limited, Circle office
Seal & Signature of Bidder
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (TR)
C.O., GETCO, Jambuva
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe” website
In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if
training required for participating in online tender, they can contact the following office: (n) Procure
Cell, (n) code solutions-A division of GNFC Ltd., 403, GNFC Infotower, S.G. Road, Bodakdev Ahmedabad
–380054 (Gujarat ).
079-26857321 / 40007533, Email: [email protected]
Seal & Signature of Bidder
TENDER No: JTC / 25-26 /n-239
Name of Work : Work of Painting of structures and foundations of various KV Class equipment and
Gantry in Switchyard with supply of approved make Distemper paint and Anti rusting black paint at
220KV Chandrapura S/S under Godhra AM division & 400KV Asoj S/S under Jambuva AM Division
under Jambuva Circle
Sr. No. Document Code Part Page No.
1 Tender Notice - I
2 Technical Bid - I
3 Integrity Pact - I
4 Instructions to Tenderers ITB I
5 Qualification Requirement -
6 General Conditions of Contract GCC I
7 Erection Conditions of Contract ECC I
8 Special Conditions of Contract with SCC I
Declaration Form
9 Technical Specifications TSP II A
10 Technical Data sheets TDS II B
11 Various Annexures -
Seal & Signature of Bidder
Seal & Signature of Bidder
(A) INSTRUCTIONS TO THE BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Baroda hereinafter called ‘GETCO’/
‘OWNER’ intends to receive bids for Work of Painting of structures and foundations of various
KV Class equipment and Gantry in Switchyard with supply of approved make Distemper paint
and Anti rusting black paint at 220KV Chandrapura S/S under Godhra AM division & 400KV
Asoj S/S under Jambuva AM Division under Jambuva Circle as detailed in the accompanying
specifications in accordance with Terms and Conditions herein. The bids shall be prepared
and furnished as per these Instructions.
2.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/liable for
these costs irrespective of the course and conclusion of this Bidding.
3.0 BID DOCUMENTS
Details of Documents
The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
4.0 Knowing the Bid Documents
4.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein,
which may in any manner, affect the scope & content of work and the costs thereof. Submission of a
Bid not substantially responsive to the Bid Document in all respects and/or failure to furnish all
information required by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
5.0 Clarifications on Bid Documents
5.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications or
is in doubt as to the true meaning of any part, he shall make a request, in writing not later than the
date of pre Bid discussion, to the owner in triplicate. The owner will issue explanations, interpretations
and clarifications as deemed fit in writing as a response to this request. On receipt of such
interpretations/clarifications, the Bidder may submit his Bid within the date and time stipulated in the
Bid invitation, All such explanations, interpretations and clarifications from the Owner shall be deemed
as part of Bid Documents and shall invariably accompany the Bidder’s proposal.
5.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his
representative(s) will not in any way be binding on the Owner.
6.0 Amendment of bidding document:
6.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at
his own initiative or in response to a clarification requested by the intending Bidder, modify the Bidding
Document with amendment(s).
6.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have received
the Bidding Document at the address contained in the letter of request for issue of Bidding document
from the Bidders. Owner will bear no responsibility or liability arising out of non-receipt of the same in
time or otherwise.
Seal & Signature of Bidder
6.3 In order to afford prospective bidders reasonable time in which to take the amendment into account
in preparing their bids, the Owner may, at his discretion, extend the deadline for the submission of
6.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration
by the Bidders while they submit their bids and shall invariably enclose such documents as a part of
7.0 PREPARATION OF BIDS
7.1 Language of Bid:
The Bid prepared by the Bidder and all correspondence and documents relating to the Bid, exchanged
by the Bidder and the Owner, shall be written in the English language, provided that any printed
literature furnished by the Bidder may be written in another language so long as accompanied by an
English translation of its pertinent passages. Failure to comply with this may disqualify a bid. For
purposes of interpretation of the bid, the English translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding
any printed/typewritten text of their own.
8.0 Local Conditions:
8.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which
may have any effect on the execution of the Contract covered under these documents and
specifications. The Owner shall not entertain any request for clarifications from the bidders, regarding
such local conditions.
8.2 It must be understood and agreed that such factors have properly been investigated and considered
while submitting the proposals. No claim for financial adjustment to the Contract awarded under these
specifications and documents will be entertained by the owner. Neither any change in the time
schedule of the Contract nor any financial adjustments arising thereof shall be permitted by the Owner,
which are based on the lack of such clear information or its effect on the cost of the works to the
9.0 Documents comprising the Bid:
etc. furnished in the Bidding Documents, indicating, for the services to be rendered, a brief description
of services, quantity and price.
9.2 All tender documents, scanned copies of original (Notarized / self-attested copies of original – as
specified in tender document) documents along with scanned copy of original document for Tender
Fee & EMD shall be uploaded through on line only (which is mandatory) on (n) procure Portal to
establish that the Bidder meets the Qualification Requirements as detailed in ANNEXURE -I. No
physical documents to be submitted by the bidder.
9.3 Complete technical bid / Tender Documents / formats are to be filled in all respects. Same shall be
sealed and signed by the Company Authorized Signatory wherever specified and scanned copies of
original (Notarized / self-attested copies of original – as specified in tender document) documents
along with scanned copy of original document shall be uploaded through on line only (which is
mandatory) on (n) procure Portal.
9.4 Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on before
due date and time of submission of tender. Tender fee and EMD paid though Demand Draft /
Banker’s cheque or Pay order will not be accepted and no any further communication in the
matter will be entertained.
9.5 In case of short submission of documents with bid & / or clarification if any required from the bidder,
the required details/ documents may be asked from bidder in physical form.
9.6 It shall be sole responsibility of the bidder that the uploaded scanned documents ( in PDF form)
remain legible & should not be password protected.
9.7 Bidder shall have to upload scanned copies of complete technical bid filled in all respect and sealed
and signed by Company Authorized Signatory through on line only (which is mandatory) on (n) procure
10.0 Bid Price:
10.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate price
Schedules, enclosed in bid proposal sheets for erection, testing and commissioning, and other
services it proposes to furnish under the contract. The % age above/below indicated shall be
Seal & Signature of Bidder
inclusive of all taxes and duties applicable inclusive of GST applicable on required inputs and
10.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease
11.0 Price Basis:
11.1 The Price shall be quoted on firm basis.
11.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract and
shall not be subject to variation on any account save for change in quantity. A bid submitted with an
adjustable price quotation shall be treated as non-responsive and rejected.
12.0 Taxes and Duties:
12.1 Goods and Service Tax (GST):
12.1.1 The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on
a given taxable goods and/or services within the original contractual delivery period. The amount
and% of GST and Cess as applicable should clearly be indicated separately. (GST/Cess means all
applicable Tax/Cess under GST Laws. GST Laws means IGST Act, GST(Compensation to the State
for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017and all related ancillary
12.1.2 You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder, certifying
that you have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall
not claim any such Refund, on a future date, from the concerned Authorities and if, any Refund, in
respect of such GST and Cess, is claimed by you, it will be immediately passed on to the COMPANY,
without COMPANY making any specific Claim, for the same, either from the Department or from you.
12.1.3 The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and
Cess is not mentioned clearly unless the bidder has opted for Compostion Scheme under GST Act,
which should be clearly indicated in the price bid. COMPANY may at its discretion consider such offer
with presumption of highest applicable rate of VAT/GST/Cess prevailing when the price quoted is
inclusive of GST and Cess.
12.1.4 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of
the Supplier from Composition scheme during the tenure of the contract, the rate mentioned in the
price bid shall be final and any additional GST will have to be borne by the tenderer. In no case
additional amount towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
12.1.5 Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance
of tender only and any deviation in the same shall not be accepted. Further, any additional liability of
GST (later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over
and above as charged in the invoice shall be borne by the Supplier/Contractor. However, any refund
received by the supplier / contractor on account of GST charged from the company; such refund shall
have to be passed on to the company, along with interest if any. Such refund along with interest needs
to be passed on suo-moto by the supplier / contractor.
12.1.6 Further, the Company has a right to recover the amount of GST along with penal interest at the rate
of 15% per annum if GST charged is not paid / short paid to the government or fail to upload the
details or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within the
stipulated time limit.
12.1.7 In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
12.1.8 INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Creditand / or due to inclusion of any
other additional item of their inputs / input services under the ambit of the Input Tax Credit provisions
under the GST Act, subsequent to the date of submission of the offer, the same should be passed on
to COMPANY and you should inform such changes to COMPANY from time to time.
12.1.9 GST, other taxes and other levies and duties including custom duty solely in respect of
the transaction between the owner and the contractor under this contract, if any, shall be
included in the bid price. These shall also be indicated separately wherever applicable
as mentioned in the Tender.
12.2 As regards the income Tax, surcharge on income tax and any other corporate tax, including GST if
any ,the owner shall not bear any tax liability whatsoever. The bidder shall be liable and responsible for
payment of such taxes as attracted under the provisions of the law.
Seal & Signature of Bidder
12.3 Notwithstanding the tax liabilities as per the sub-clause 12.1 above the owner shall have the right to
make deduction at source from the amounts payable to the contractor in respect of Income Tax (on the
cost of items of supply included in the works contract) as may be mandatory in terms of the law. The
owner shall not bear any liability in this regard but shall issue necessary certificate in respect of such
deduction made.
12.4 In case any tax or duty is newly introduced by the Government applicable for this contract with effect
from the next day of the date submission of the bid and if the contractor is required to pay additional tax
or duty, then the owner shall reimburse the contractor the additional tax or duty so paid by the contractor
against submission by the contractor of documentary evidence to the satisfaction of the owner. This
provision will not be applicable to transaction between the contractor and his sub-contractors and will
be applicable only to the direct transaction between the contractors and owner. Besides the said
statutory variation, no other statutory variation shall be payable by the owner.
12.5 The owner’s liability for all taxes and duties including GST under the contract shall be limited to those
indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as
per Clause No. 12.10 para.
12.6 If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced by
reasons of the making, passing or promulgation of any law after the date of submission of bid or by any
order, regulation or bye-law having the force of law the amount of such increase or reduction shall be
added to or deducted from the “Contract Price” as the case may be for direct transactions between
contactor & owner, and not for bought out items. It is the Bidders responsibility to furnish details of
taxes, duties, levies etc. applicable as on the date of submission of the bid.
12.7 No claim for any increase towards the statutory variation regarding enhancement of existing tax or duty
or introduction of a new tax or duty applicable shall be entertained by the Owner during the extended
period of contract, if any, provided the extension of the contract is required by causes attributable to the
12.8 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of a
new tax or duty will be applicable only to the direct transaction between the contractor and the owner.
12.9 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat
the applicability of Entry Tax, GST in respect of this work and include the same in the quoted price. The
Owner in this regard will entertain no separate claim, as it is the responsibility of the Bidder to pay all
12.10 In addition, the conditions detailed under Special Conditions of Contract shall apply.
13.0 Time Schedule:
13.1 The basic consideration and the essence of the contract shall be strict adherence to the time schedule
for performing the specified works.
13.2 The Owner’s requirements of completion schedule for the Works are mentioned in the accompanying
Special Conditions of Contract.
13.3 The completion schedule as stated in the special conditions of contract shall be one of the major
factors in consideration of the bids.
13.4 The owner reserves the right to request for a change in the work schedule during pre- award
discussions with successful bidder.
13.5 The successful bidder will be required to prepare detailed Bar chart and finalize the same with the
owner as per the requirement of Clause no 27.0 of GCC
14.0 Contract Quality assurance:
14.1 The Bidder shall include in his proposal the Quality Assurance Program containing the overall quality
management and procedures which he proposes to follow in the performance of the Works during
various phases as detailed in relevant clause of the General Technical Conditions.
14.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed for the
execution of the Contract will be mutually discussed and agreed and such agreed Program shall form
a part of the Contract.
14.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being
supplied wherever specifically indicated in the tender document shall supply only from those vendors.
Such details shall be accompanied by their list of previous supplies made performance reports etc.
However, in case of orders are placed, specific approval shall be obtained from the owner for the
vendor-supplied materials. The quality assurance program shall be furnished for each material
separately for approval.
15.0 Insurance:
Seal & Signature of Bidder
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled
Insurance, in General Terms and Conditions of Contract and in Erection Conditions of this Part-I.
Bidder’s attention is specifically invited to these clauses. Bid price shall include all the costs in fulfilling
all the insurance liabilities under the Contract.
16.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment
tools & tackles etc. which he proposes to bring to site for the purpose of erection, handling, testing
and commissioning including performance and guarantee tests of the equipment. If any such
equipment is listed anywhere else in the proposal and not specially mentioned in the above schedule,
it shall be deemed to have been included in the Bidder’s proposed scope of supply.
17.0 Brand Names:
17.1 The specific reference in these specifications and documents to any material/equipment by brand
name makes or catalogue number shall be construed as establishing standards of quality and
performance and not as limiting competition. However, Bidders may offer other similar
material/equipment provided they meet the specified standard, design and performance requirements.
The Bidder shall furnish adequate technical information about such alternative material equipment to
enable the Owner to determine its acceptability. The Owner shall be the sole judge on the acceptability
or otherwise of such alternatively material/equipment.
17.2 The bidder shall note that standards for workmanship material and equipment, and reference to brand
name of catalogue numbers designed by the Owner in its Technical Specifications are intended to be
descriptive only and not restrictive. The Bidder may substitute alternative standards, brand name
and/or catalogue numbers in its bid, provided that it demonstrates to the Owner’s satisfaction that the
substitutions are substantially equivalent or superior to those designed in the Technical Specification.
18.0 Bid Security/EMD:
The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of estimated
cost to be paid as under:
a) Payment of Earnest Money Deposit ( EMD ) can be accepted by RTGS/ NEFT only.
1. In case of payment through RTGS/NEFT the scan copy of payment made (transaction
slip of payment made) shall be uploaded online with the Tender documents on n-
procure portal.
2. Bidder has to provide following detail on the same date of payment made so that receipt
can be generated at below mentioned e-mail ids:
Sr. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3. GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
Seal & Signature of Bidder
6 Name of Account GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
18.1 The offer should be valid for a minimum period of 180 days from the date of opening of technical bid.
18.3 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be
made payable to the Owner without any condition whatsoever.
18.4 The Owner as non-responsive will reject any bid not secured in accordance with Para 18.1 above. No
exemptions are made in the furnishing of the security.
18.5 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three
months from the date of submission of tender whichever is later.
18.6 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
18.7 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
b) If a bidder refuses to accept the contract or fails to commence the works including supplies
within thirty days of letter of award of contract)
19.0 Format of Bid:
19.1 The original and all copies of the bid shall be typed or written in indelible ink and shall be signed by
the Bidder or a person or persons duly authorized by the Bidder to sign the Contract. The letter
of authorization shall be indicated by written power-of-attorney accompanying the bid. All
pages of the bid, except for un-amended printed literature, shall be initiated by the person or persons
signing the bid.
19.2 Complete technical bid / all Tender Documents / formats are to be filled in all respects. Same shall be
sealed and signed by the Company Authorized Signatory wherever specified and scanned copies of
original (Notarized / self-attested copies of original – as specified in tender document) documents along
with scanned copy of original document shall be uploaded through on line only (which is mandatory) on
(n) procure Portal. No physical documents to be submitted by the bidder
19.3 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initiated by the person or persons signing
19.4 The bid shall contain no interlineations, erasures or overwriting except as necessary to
correct errors made by the Bidder, in which case such corrections shall be initiated by the
person or persons signing the bid.
19.5 Bids shall be submitted as under:
Complete Technical Bid, Tender documents as per QR , Price Bid and transcation slip for
payment made for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only.
20.0 Signature of Bids:
20.1 The bid must contain the name, residence and place of business of the person or persons making the
bid and must be signed and sealed by the Bidder with his usual signature. The names of all persons
signing should also be typed or printed below the signature.
20.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name, followed by the signature(s) and designation(s) or the authorized partner(s) or other
authorized representative(s).
20.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by
the President/Managing Director or by the Secretary or other person or persons authorized to bid on
behalf of such Corporation/Company in the matter.
20.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’,
‘Agent’ or other designation without disclosing his Principal will be rejected.
20.5 If it is found that two or more persons who are connected with one another either financially or as a
principal and agent have bid under different names without disclosing their connection then such bids
will be liable for rejection. Satisfactory evidence of authority of the person signing on behalf of the
Bidder shall be furnished with the bid.
20.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
20.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
21.0 Submission of bids:
Seal & Signature of Bidder
21.1 Complete Technical Bid, Tender documents as per QR , Price Bid and transcation slip for
payment made for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only.
Price Bid : Technical & Price bid shall be submitted ‘online’ only through n-code.
21.2 The Technical Bid and accompanying documents, RTGS/ NEFT transaction slip for payment made
for tender fee and EMD shall be uploaded ( scanned copies of original document ) through on line
only (which is mandatory) on (n) procure Portal by the bidder.
21.3 Address of the Owner is as under:
The Superintending Engineer
GETCO, Circle Office,
220kv Jambuva sub-station compound.
NH -8, Jambuva PIN CODE-
22.0 Deadline for submission of bids:
22.1 The Bidders have to submit the bid documents with detail of payment of tender / Fee /EMD
paid though NEFT / RTGS by online mode only as per schedule closing date of submission
22.2 The Owner may, at its discretion, extend this deadline for the submission of bids by
amending the Bidding Document in which case all rights and obligations on the Owner and
Bidders previously subject to the deadline will thereafter be subject to the deadline as
23.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
24. Modification and withdrawal of bids:
24.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of
the modification or withdrawal is received by the Owner prior to the deadline prescribed for submission
24.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of clause 23.0. The envelope should clearly indicate whether the
modification is for the Technical bid or the Price bid. No bid modifications notice by Telex/Grams/Fax
shall be entertained by the Owner.
24.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of
24.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the expiration
of the period of bid validity specified by the Bidder on the Bid Form. Withdrawal/modification of a bid
during this interval may result in the Bidder’s forfeiture of its bid security.
25.0 Information required with the proposal:
25.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of each principal
item of equipment proposed to be furnished and erected. The bid should also contain drawings and
descriptive materials indicating general dimensions, materials from which the parts are manufactured,
principles of operation, the extent of pre-assembly involved, major construction equipment proposed
to be deployed, method of erection and the proposed erection organizational structure.
25.2 The above information shall be provided by the Bidder in the form of separate sheets, drawings,
catalogues, etc. in five copies.
25.3 Any bid not containing sufficient descriptive material to describe accurately the equipment proposed
may be treated as incomplete and hence rejected. Such descriptive materials and drawings submitted
by the Bidder will be retained by the Owner. Any major departure from these drawings and descriptive
material submitted will not be permitted during the execution of the Contract without specific written
permission of the Owner.
25.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement of the
equipment or any other matter will not be considered.
25.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to provide
additional information and data as deemed necessary by the Bidder.
Seal & Signature of Bidder
25.6 The Bidder, along with his Proposal, shall submit a list of recommended erection equipment and
materials which will be required for the purpose of erection of equipment and materials supplied under
25.7 In case the ‘Proposal’ information contradicts specification requirements, the specification
requirements will govern, unless otherwise brought out clearly in the technical commercial deviation
26.0 BID OPENING AND EVALUATION
Opening of bids by owner:
26.1 The Owner will open the technical bids online on Date of opening online technical bid.
26.2 The Bidder’s names, Technical modifications, bid withdrawal and such other details as the Owner, at
his discretion may consider appropriate, will be announced in the Technical Bid Opening.
26.3 Price bid will be open ‘online’ only through n-code after technical scrutiny of tender.
Technical bid and Price bid will be open ‘online’ only through n-code.
27.0 Purpose of evaluation of bids:
27.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these
specifications and documents. All technically responsive bids shall then be examined to determine
the LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
27 ( A) Policy for bids under consideration:
27.A.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until
such time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids
are under consideration, Bidders and/or their representatives and other interested parties are advised
to refrain from contacting by any means, the owner and/or his employee’s representatives on the
matters related to Bids under consideration.
27.A.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing and
no change in the price or substance of the bid shall be sought, offered or permitted.
28.0 Preliminary Examination:
28.1 The Owner will examine the bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have
been properly signed, and whether the bids are generally in order.
28.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the
unit price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a
discrepancy between the total bid amount and the sum of total costs, the latter shall prevail and the
total bid amount will be corrected accordingly. If there is a discrepancy between words and figures,
the amount advantageous to the Owner will prevail. If the Bidder does not accept the correction of the
errors as above, his Bid will be rejected and the amount of Bid Security will be forfeited. The Bidder
the case of any inconsistency in the prices furnished in the specified prices schedules to be identified
in Bid Form for this purpose, the Owner shall be entitled to consider the highest price for the purpose
of evaluation and for the purpose of award of Contract use the lowest of the prices in these schedules.
28.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid
to the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one which
conforms to all the terms and conditions of the Bidding Document without material deviations. A
material deviation is one which affects in any way the prices, quality, quantity or delivery period of the
equipment, completion of works or which limits in any way the responsibilities or liabilities of the Bidder
of any right of the Owner as required in these specifications and documents. The Owner’s
determination of a bid’s responsiveness shall be based on the contents of the bid itself without
recourse to extrinsic evidence.
28.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
28.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking
Seal & Signature of Bidder
29.0 Evaluation of Price Bids:
29.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition will
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of
b) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost Compensation
for Deviations.’
30.0 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall
be derived as under:
Differential Price (DP)=n1F1+n2F2…+nn Fn, where F1, F2…Fn are the various factors in Indian
Rupees per unit of parameter differential or deficiency in the equipment and services offered as
stipulated in these specifications: n1, n2…nn are the respective parameter differential or deficiency in
the corresponding units to be determined from the Bidder’s proposal. The above factors and
corresponding units of parameter differential are derived from the Technical Specifications, Data
sheets and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value
(D) and from the Bidding Document while evaluating the bids. In determining the Rupee value of the
deviations the Owner will use parameters consistent with those specified in the specifications and
documents and or other information as necessary and available to the Owner.
30.1 Comparison of Bids
The bids shall be compared on the basis of lumpsum prices (i.e., for erection services to be rendered
as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value of erection cost including other
components if any.)
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
evaluated bid and, as a result of this comparison, the lowest bid will be selected for the award of the Contract.
31.0 AWARD OF CONTRACT
31.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further that
the Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall be the
sole judge in this regard.
32.0 MATCHING OF END COST:
32.1 In case the GETCO decides to award contract on matching end-cost basis, the bidder has to reduce
all the quoted rates proportionately. The reduction on overall basis will not be accepted (i.e. all unit
rates of erection schedule shall be reduced proportionately by difference in percentage). The
confirmation for matching end cost shall be given within 7 (seven) days from the letter from GETCO.
32.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with
the terms and conditions specified in the accompanying Technical Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
Seal & Signature of Bidder
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject
all bids at time prior to award of contract, any without thereby incurring any liability to the affected
Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the grounds for the
Owner’s action.
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will
notify the successful Bidder in writing by registered letter or cable or telex or FAX, to be confirmed in
writing by registered letter, that its bid has been accepted.
34.2 The notification of award will constitute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 36.0,
the Owner will promptly notify each unsuccessful Bidder and will discharge its bid security, pursuant
to Clause 18.0.
35.0 Signing of contract:
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the
Owner will send the Bidder the detailed of Award, incorporating all agreements between the parties.
35.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same with date
and return it to the Owner.
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be
signed within 30 (Thirty) days of notification of Award.
36.0 Contract Performance Guarantee:
36.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be
required to furnish a performance guarantee in form of Bank guarantee from a Public Sector Indian
bank/Scheduled, Commercial Bank in the form to be furnished. The guarantee amount shall be equal
to ten percent (10%) of the Contract price and it shall guarantee the faithful performance of the
Contract in accordance with the terms and conditions specified in these documents and specifications.
the guarantee shall be valid up to 90 days after the end of Warranty Period.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment
furnished and erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors and
installed by him shall be free from all defects in design, material and workmanship and shall upon
written notice from the Owner fully remedy free of expenses to the Owner such defects as
developed under the normal use of the said equipment within the period of guarantee specified in
the relevant clause of the General Terms and Conditions in the Part-I / Special Conditions of
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract.
However, it is not to be construed as limiting the damages under clause entitled “Equipment
Performance Guarantee” in Technical Specifications, Part-II and damages stipulated in other clauses
in the Bid documents.
36.4 The performance guarantee will be discharged without any interest at the end of guarantee period,
unless otherwise specified in Special Conditions of Contract.
37.0 Scope of the proposal
37.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering
all the equipment erection and other installation services specified under the accompanying Technical
Specifications. It will include among others as specified therein the following: -
a) Receipt of equipments and material from GETCO’s store, transportation, storage, preservation and
conservation of equipment at the Site.
b) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
c) Reliability tests and performance and guarantee tests on completion of commissioning.
37.2 No deviation whatsoever to certain conditions of the bidding documents permitted by the Owner and
therefore, the Bidders are advised that while making Bid Proposals and quoting prices these
conditions may appropriately be taken into consideration. Bidders are required to furnish a certificate
in this regard as per the format provided in Special Conditions of Contract in a separate sealed
envelope containing Bid security, which shall accompany the Technical Bid. Any Bid not
accompanied by such certificate shall be rejected by the Owner and shall not be opened.
Seal & Signature of Bidder
37.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence
37.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data
Sheets and specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid
Proposal Sheets.
37.5 The scope of work is Work of Painting of structures and foundations of various KV Class
equipment and Gantry in Switchyard with supply of approved make Distemper paint and Anti
rusting black paint at 220KV Chandrapura S/S under Godhra AM division & 400KV Asoj S/S
under Jambuva AM Division under Jambuva Circle as per standard specification and standard
practice of GETCO and as per EIC.
Qualification Requirement
To be qualified for award, the bidder shall provide following satisfactory evidence to the Owner of his capability
and adequacy of resources:
1) Registration : The Bidder shall be strictly a GETCO registered contractor of any class
2) Experience : The bidder should produce evidence of having experience in executing similar nature of work
OR experience for painting of H-frame DP structures / Towers OR painting of Power Transformers / Reactor
with GETCO within last 3 financial years. Bidder shall have to submit work contract along with satisfactory
completion certificate from respective department
3) Electrical Contractor Licence with latest validation
4) Payment of Tender fee and EMD.
5) GST registration certificate. (Certificate of Provisional GST registration shall not be accepted).
6) Details of Proprietorship / Partners/Directors of the Firm/Company. Partnership deed, MOA, BR, if
7) Copy of power of attorney as the case may be.
8) PF registration
9) The Bidder should have to submit copy of PAN card.
10) Profit Loss and Balance sheet & IT returns of Last three financial years.
11) Latest bank solvency certificate from any Nationalized/Scheduled Bank of a sum of minimum 20 % of the
estimated cost shown in the tender.
1. Complete Technical bid ,all tender documents (Scan copy of notarized/self-attested as per tender
specification) ,RTGS/ NEFT transaction slip for payment made for tender fee and EMD to be submitted
on line only (which is mandatory) on (n) procure Portal. No physical documents to be submitted by the
2. The above-cited requirements are only indicative. The owner reserves the right to requisition any other
relevant information and also reserves the right to reject the Bid proposal of any Bidder, if in the
Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to perform the Contract
satisfactorily.
3. All above Qualification Requirement documents must be submitted online with Self attested by Bidder
(With seal & signature of bidder).
1. The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering
all the services specified under the accompanying Technical Specifications.
2. The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, technical Data
Sheets and specified elsewhere.
3. The above work shall be done as per GETCO’s approved drawing/layout.
Seal & Signature of Bidder
4. Necessary field quality plan of GETCO shall be implemented and necessary documentation shall also
be maintained as per GETCO’s norms and instruction of EIC. If required field quality plan shall be
available at field offices.
5. During the work safety check list shall be followed. Necessary check list will be available at our field
6. Successful bidder has to appoint site Engineer to maintained site register & FQP as per ISO.
7. All work should be done accordingly to ISO & FQP and all require documents including Filled FQP,
testing results etc. should be submitted while handing over the completed work.
8. The quantity mentioned in price bid is tentative and may vary in actual work order.
9. The scope of work is Work of Painting of structures and foundations of various KV Class equipment
and Gantry in Switchyard with supply of approved make Distemper paint and Anti rusting black paint
at 220KV Chandrapura S/S under Godhra AM division & 400KV Asoj S/S under Jambuva AM Division
as per standard specification and standard practice of GETCO and as per EIC.
10 Detail of work is as under :
1.Distempering Work:
Providing two coats of Oil Bound Distemper (O.B.D.)/Weatherproof distemper of approved brand and white
colour over RCC Foundation.
Before distempering, the surface shall be thoroughly brushed to remove mortar droppings, dust, dirt, and all
foreign matter.
Surface preparation shall include making the surface even, smooth, and properly sand-prepared.
2. Anti-Rusting / Anti-Corrosion Treatment:
One coat of good quality Anti-rusting / Anti-corrosion Black Paint of standard approved make (Asian / Berger
/ Nerolac) shall be applied to the bottom part of the structure up to 300 mm height from the finished ground
The surface shall be thoroughly cleaned and prepared to remove rust, dust, grease, or any other foreign
material before applying the coat.
Superintending Engineer
GETCO, Jambuva, C.O.
Seal & Signature of Bidder
GENERAL TERMS AND CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its group
companies. i.e. GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL and shall include its legal
representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works
and shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Sub-Contractor’ shall mean the person named in the Contract for any part of the Works or any person
to whom any part of the Contract has been sublet by the Contractor with the consent in writing of the
Engineer and will include the legal representatives,successors and permitted assigns of such person.
1.5 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to
time for the purpose of the Contract.
1.6 The terms ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials to be
issued to the Contractor under the Contract.
1.7 ‘Works’ shall mean and include taking delivery of line materials labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.8 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract
and such other schedules and drawings as may be mutually agreed upon.
1.9 ‘Site’ shall mean and include the land and other places on, into or through which the works and the
related facilities are to be erected or installed and any adjacent land, paths, street or reservoir which
may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.10 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the contract
agreement for the entire scope of the works.
1.11 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the works
including erection, testing and putting into satisfactory operation including successful completion of
performance and guarantee tests to be performed at Site by the Contractor including cost of
1.12 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to
inspect the equipment; stores or Works under the Contract and/or the duly authorized representative
1.13 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice issued
by the Owner notifying the Contractor that his bid has been accepted.
1.14 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.15 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.16 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined
shall mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.17 Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or
seal as the case may be.
1.18 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As
Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and
phrases of like importance are used the approval, judgment, direction etc. is understood to be a
function of the Owner/Engineer.
1.19 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
1.20 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine
and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract
1.21 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and
Guarantee Tests, as specified in the accompanying Technical Specifications or otherwise agreed in
Seal & Signature of Bidder
1.22 ‘Guarantee Period’ shall mean the period during which the Contractor shall remain liable for repair or
replacement of any defective part of the works performed under the Contract.
1.23 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which
cannot be detected during inspection, testing etc, based on the technology available for carrying out
1.24 ‘Drawing’, ‘Plans, shall mean all:
a) Drawings furnished by the Owner to the Contractor during before execution of work / the progress
of the work; and
b) Engineering data and drawings submitted by the Contractor during the progress of the work
provided such drawings are acceptable to the Engineer/Owner after duly approved.
1.25 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter
of the Contract.
1.26 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.27 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
1.28 Terms and expressions not herein defined shall have the same meaning as are assigned to them in
the Indian Sale of Goods Act (1930), failing that in the Indian Contract Act (1872) and failing that in
the General Clauses Act (1897) including amendments thereof, if any.
1.29 In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance Security’.
1.30 GST / Cess means all applicable tax / cess under GST Laws ,GST laws means IGST Act, GST (
compensation to the state for loss of Revenue ) Act, CGST Act, UTGST Act & SGSCT Act, 2017 and
all related ancillary legislations.
1.31 Works contract means a contract for composit supply & covered under the definition of works contract
as defined under section 2 ( 119) , of the CGST act , 2017 or SGST act ,2017 & similar provisions,
applicable under the UTGST act, 2017 & the IGST act ,
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by provisions in other
parts of the Contract.
The works carried out under this Contract shall conform to the all statutory regulation and provisions
the acts, mentioned in the Technical Specifications, and, when no regulations or standard is mentioned,
to the authoritative regulations or standards/ Act, appropriate to the works and such stipulations shall
be the latest issued by the concerned institution.
4.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices,
correspondences, operating and maintenance instructions, drawings or any other writing shall be
written in English language. The Metric System of measurement shall be used exclusively in the
5.0 CONTRACT DOCUMENTS
Seal & Signature of Bidder
5.1 The term Contract Documents shall mean and include the following which shall be deemed to form
an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract and all other documents included under Volume- I
and the Special Conditions of Contract.
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) All the materials, literature, data and information of any sort given by the Contractor along with
his bid, subject to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and special terms
and conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred to
the Engineer whose decision shall be considered as final and binding upon the parties.
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or
on behalf of the Owner in connection therewith, to any person other than a person employed by the
Contractor in the performance of the Contract. Disclosure to any such employed person shall be made
in confidence and shall extend only so far as may be necessary for the purpose of such performance.
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the
site, dimensions, quantity, quality or other information, concerning the works unless prior written
permission has been obtained from the Owner.
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain
the property of the Owner and shall be returned (in all copies) to the Owner on completion of the
Contractor’s performance under the Contract if so required by the Owner.
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will
be treated as a single Contract.
Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect of all
the equipment material equipment/materials given by the owner after observing standard store
procedures for transport from owner’s stores, insurance, unloading storage handling at site installation
testing & commissioning.
7.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch documents
be required to execute an Indemnity Bond in favor of the Owner in the form acceptable to the SE(TR)
GETCO Jambuva for keeping the equipment in safe custody and to utilize the same exclusively for
the purpose of the said Contract. Samples of Performa for the Indemnity Bond will be furnished during
award of Contract.
7.3 The Contract shall in all respects be construed and governed according to Indian Laws.
7.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of
deviations or modifications under the Contract(s).
8.0 JURISDICTION OF CONTRACT
Seal & Signature of Bidder
8.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Vadodara shall
have exclusive jurisdiction in all matters arising under this Contract.
9.0 EXECUTION OF CONTRACT:
9.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
9.2 The Agreement, unless otherwise agreed to, shall be signed within 10 days of the acceptance of the
Letter of Award, at the office the Owner at Jambuva on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate power of
attorney and other requisite materials. In case the Contract is to be signed beyond the stipulated time,
the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
9.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one
signed original and the rest will be retained by the Owner.
9.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings, and
descriptive materials submitted with the bid, to form a part of the Contract immediately after issue of
Letter of Award
9.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
10.0 ENFORCEMENT OF TERMS
10.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be construed to be a waiver
of such provisions, rights or options or in any way to affect the validity of the Contract. The exercise
by either party of any of its rights herein shall not preclude or prejudice either party from exercising
the same or any other right it may have under the Contract.
11.0 COMPLETION OF CONTRACT
11.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the
clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
12.0 TIME – THE ESSENCE OF CONTRACT
12.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner without
or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the
essence of the Contract. The Contractor shall so organize his resources and perform his work as to
complete it not later than the date agreed to.
12.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate
number of activities covering various key phases of the work such as field erection activities within
five (5) days of the date of Notification of Award. This network shall also indicate the interface facilities
to be provided by the Owner and the dates by which such facilities are needed. The Contractor shall
discuss the network so submitted with the Owner and the agreed network shall form part of the
Contract documents. During the performance of the Contract, if in the opinion of the Engineer, proper
progress is not maintained, suitable changes shall be made in the Contractor’s operations to ensure
proper progress without any cost implication to the Owner. The interface facilities to be provided by
the Owner in accordance with the agreed network shall also be reviewed while reviewing the progress
of the Contractor.
12.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by the Contractor
as directed by the Engineer.
12.4 Subsequent to the finalization of the network, the Contractor shall make available to the Engineer a
detailed program in line with the agreed Contract network. Such program shall be reviewed, updated
and submitted to the Engineer every month thereafter.
12.5 The above bar charts/ program shall be compatible with the Owner’s computer environment and
furnished to the Owner on such media as may be desired by the Owner.
13.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement
given by the respective construction sub division unless otherwise provided in the notification of
Seal & Signature of Bidder
14.0 PENALTY FOR DELAY
14.1 If the Contractor fails to successfully complete the work within the time fixed under the Contract, the
Contractor shall pay to the Owner as penalty a sum specified for each specified period of delay. The
details of such penalty are brought out in the accompanying Special Conditions of Contract (SCC).
14.2 Any delay that may take place in work execution beyond Contractual cutoff date stated as per
stipulated delivery period shall be subject to the penalty at the rate of ½ % of the delayed work value
plus applicable taxes (if any) per week or part thereof, with a ceiling of 10 % of the total contract value
plus applicable taxes (if any), detailed in the Special Conditions of Contract (SCC).
14.3 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be
entitled to deduct the amount of Penalty for delay from the amounts payable to the Contractors under
any bills raised under this contract or any other contract with the GUVNL and its Subsidiary
Companies i.e. GETCO, GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the
Owner to adjust the amount of Penalty of delay against any Bank Guarantee furnished by the
Contractor under this contract or any other contract with GUVNL and/or its subsidiary companies.
14.4 The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
15.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss
or damages, repairs or adjustment may be made by the Engineer or a third party chosen by the
Engineer without advance notice to the Contractor and the cost of such work shall be paid by the
Contractor. In the event such action is taken by the Engineer, the Contractor will be notified promptly
and he shall assist wherever possible in making necessary corrections. This shall not relieve the
Contractor of his liabilities under the terms and conditions of the Contract.
15.3 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the
provision of this clause shall apply to portion of the works so rectified or corrected until the expiry of
twelve(12) months from the date of such rectification or correction. If any defects are not rectified
within a reasonable time, the Engineer may proceed to do the work at the Contractor’s risk and cost
but without prejudice to any other rights which the Owner may have against the Contractor in respect
of such defects.
15.4 The rectification or correction of the work will be carried out free of cost by the Contractor. If any
rectification or correction is carried out on his behalf at the site, the Contractor shall bear the cost of
such rectification or correction.
15.5 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations
under this clause.
15.6 At the end of the guarantee period, the Contractor’s liability ceases except for latent defects. For latent
defects, the Contractor’s liability as mentioned in Clause Nos. 15.1 through 15.5 above, shall remain
till the end of 6 months from the date of completion of guarantee period.
15.7 It is the responsibility of the contractor to handover the complete work free of all defects. If within a
period of one year from the date of handing over the work it is noticed that any defects occurs due to
bad workmanship, it is the duty of the contractor to rectify / replace the same at his own cost. If within
seven days from the date of receipt of such notice, the contractor does not take up the work, same
will be carried out at his risk and cost.
16.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against
the Owner or the Contractor in pursuance of the Contract. In addition the Contractor shall be
responsible for payment of all Indian duties including GST, levies and taxes lawfully assessed against
the Contractor for his personal income & property only.
17.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner,
for the failure, omission or neglect on the part of the Contractor to perform any acts, matters,
covenants or things under the Contract, or for damage or injury caused by the alleged omission or
negligence on the part of the Contractor, his agents, representatives or his Sub-Contractors, or in
connection with any claim based on lawful demands of Sub-Contractors, workmen, suppliers or
employees, the Contractor shall in all such cases indemnify and keep the Owner, and the Engineer
and/or his representative, harmless from all losses, damages, expenses or decrees arising of such
Seal & Signature of Bidder
18.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor
from all his liabilities under the Contract. Such final payment shall be made only at the end of the
Guarantee/Warranty period or after finalization of material account and final bill and till such time as
the Contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments made
under the Contract shall be treated as on-account payments.
19.0 ENGINEER’S DECISION
19.1 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
19.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days
after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
19.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent
to the right to request arbitration. It is the intent of the Agreement that there shall be no delay in the
execution of the works and the decision of the Engineer as rendered shall be promptly observed.
20.0 POWER TO VARY OR OMIT WORK
20.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred
to as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the
Contractor except as directed in writing by the Engineer, but the Engineer shall have full powers
subject to the provisions hereinafter contained, from time to time during the execution of the Contract,
by notice in writing to instruct the Contractor to make such variation without prejudice to the Contract.
The Contractor shall carry out such variation and be bound by the same conditions as far as applicable
as though the said variations occurred in the Contract Documents. If any suggested variations would,
in the opinion of the Contractor, if carried out, prevent him from fulfilling any of his obligations or
guarantees under the Contract, he shall notify the Engineer thereof in writing and the Engineer shall
decide forthwith whether or not, the same shall be carried out and if the Engineer confirms his
instructions, the Contractor’s obligations and guarantees shall be modified to such an extent as may
be mutually agreed. Any agreed difference in cost occasioned by any such variation shall be added
to or deducted from the Contract Price as the case may be.
20.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials
are already prepared or any design, drawings or pattern made or work done as per the contract
requires to be altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
20.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement
of carrying out the alterations or additional or substituted work which either then or later on, will in the
opinion of the Contractor, involve a claim for additional payment, the Contractor shall immediately and
in no case later than thirty (30) days, after receipt of the instructions aforesaid and before carrying out
the instructions, advise the Engineer to that effect. But the Engineer shall not become liable for
payment of any charges in respect of any such variations, unless the instructions for the performance
of the same shall be confirmed in writing by the Engineer.
20.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing,
so to the extent of any change in the price, before the Contractor proceeds with the change.
20.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
20.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct
the Contractor, in writing, during the execution of the Contract to vary the quantities of the items or
groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section
GCC of this Volume-I. The Contractor shall carry out such variations and be bound by the same
conditions as though the said variations occurred in the Contract Documents. However, the Contract
Price shall be adjusted at the rates and the prices provided for the original quantities in the Contract.
21.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT:
Seal & Signature of Bidder
No subletting of contract is allowed. Contractor should carry out work on his own under his or his
authorized supervisor and by labours employed by him.
22.0 CHANGE OF QUANTITY
22.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms & conditions.
Such variations unless otherwise specified in the accompanying Special Conditions of Contract and/or
Technical Specifications, shall not be subjected to any limitation for the individual items but the total
variations in all such items under the Contract shall be limited to a percentage of the Contract
price as specified in the Special Conditions of Contract.
22.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for
the change in quantities as above. The base unit rates, as identified in the Contract shall however
remain constant during the currency of the Contract, except as provided for in Clause 33.0 below. In
case the unit rates are not available for the change in quantity, the same shall be subjected to mutual
23.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers
and freely exchange with them such technical information as is necessary to obtain the most efficient
and economical design and to avoid unnecessary duplication of efforts. The Engineer shall be
provided with three copies of all correspondence addressed by the Contractor to other Contractors
and Consulting Engineers of the Owner in respect of such exchange of technical information,
wherever needed.
24.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor
any order by the Owner or the Engineer for payment of money or any payment for or acceptance of,
the whole or any part of the Works by the Owner or the Engineer, nor any extension of time, nor any
possession taken by the Engineer shall operate as a waiver of any provision of the Contract, or of any
power herein reserved to the Owner or any right to damages herein provided nor shall any waiver of
any breach in the Contract be held to be a waiver of any other or subsequent breach.
25.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the
rights of the Owner against the Contractor or relieve the Contractor of his obligation for the due
performance of the Contract, or be interpreted as approval of the Works done or of the equipment
furnished and no certificate shall create liability for the Owner to pay for alterations, amendments,
variations or additional works not ordered, in writing , by the Engineer or discharge the liability of the
Contractor for the payment of damages whether due, ascertained, or certified or not or any sum
against the payment of which he is bound to indemnify the Owner, nor shall any such certificate nor
the acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of the
Owner against the Contractor.
26.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own
cost submit periodic progress reports as may be reasonably required by the Engineer with such
materials as, charts, net-works, photographs, test certificates, etc. Such progress reports shall be in
the form and size as may be required by the Engineer.
27.0 BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating starting
and completion dates of each activity. This is mandatory condition the tenders without which shall
be liable to be rejected.
28.0 TAKING OVER
Upon successful completion of work of erection of tower line by the Contractor, the Engineer shall
issue to the Contractor a completion Certificate as a proof of the final acceptance of the erected line.
Seal & Signature of Bidder
Such certificate shall not unreasonably be withheld nor will the Engineer delay the issuance thereof
on account of minor omissions or defects which do not affect the commercial operation and/or cause
any serious risk to the erected line. Such certificate shall not relieve the Contractor of any of his
obligations which otherwise survive, by the terms and conditions of the Contract after issue of such
C. CONTRACT SECURITY AND PAYMENTS
29.0 CONTRACT PERFORMANCE GUARANTEE
The Contractor shall furnish Contract Performance Guarantee(s) for the proper fulfillment of the
Contract in the prescribed form within fifteen (15) days of “Notice of Award of Contract”. The
performance guarantee(s) shall be as per terms prescribed.
30.1 The payment to the Contractor for the performance of the works under the Contract will be made by
the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfillment by the Contractor of all his liabilities under the Contract.
30.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
31.0 Payment Schedule:
31.1 Application for Payment
31.2 The Contractor shall submit application for the payment in the prescribed proforma of the Owner.
Performa for application for payment will be as prescribed.
31.3 Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the
equipment shipped/brought on to the site pursuant to the Contract up to the date mentioned in the
application and for the period covered since the last preceding certificate, if any.
31.4 Every interim payment certificate shall certify the Contract value of the Works executed up to the date
mentioned in the application for the payment certificate, provided that no sum shall be included in any
interim payment certificate in respect of the works that, according to the decision of the Engineer,
does not comply with the Contract.
31.5 Mode of Payment
Payment due on completion of work shall be made by the Owner through Owner’s Bank or directly to
the Contractor as per the payment schedule.
31.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract
after signing the Contract Agreement.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of
quality check points involved in the quantum of work billed.
32.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. All such claims shall
be billed by the Owner to the Contractor regularly as and when they fall due. Such bills shall be
supported by appropriate and certified vouchers or explanations, to enable the Contractor to properly
identify such claims. Such claims shall be paid by the Contractor within thirty (30) days of the receipt
of the corresponding bills and if not paid by the Contractor within the said period, the Owner may then
deduct the amount, from any monies due or becoming due by him to the Contractor under the Contract
or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
33.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all perils
Seal & Signature of Bidder
detailed herein. The form and the limit of such insurance as defined herein together with the under-
writer in each case shall be acceptable to the Owner. However, irrespective of such acceptance, the
responsibility to maintain adequate insurance coverage at all time during the period of Contract shall
be of Contractor alone. The Contractor’s failure in this regard shall not relieve him of any of his
contractual responsibilities and obligations. The insurance covers to be taken by the Contractor shall
be in the joint name of the Owner and the Contractor. The Contractor shall, however, be authorized
to deal directly with Insurance Company or Companies and shall be responsible in regard to
maintenance of all insurance covers. Further the insurance should be in freely convertible currency.
33.2 Any loss or damage to the material during handling, transportation, storage, erection, and all activities
to be performed till the successful completion of commissioning of the line shall be to the account of
the Contractor. The Contractor shall be responsible for preference of all claims and make good the
damages or loss by way of repairs and/or replacement of the equipment, damaged or lost. The
transfer of title shall not in any way relieve the Contractor of the above responsibilities during the
period of Contract. The Contractor shall provide the Owner with copy of all insurance policies and
documents taken out by him in pursuance of the Contract. Such copies of documents shall be
submitted to the Owner immediately after such insurance coverage. The Contractor shall also inform
the Owner in writing at least sixty (60) days in advance regarding the expiry/cancellation and/or
change in any of such documents and ensure revalidation, renewal etc., as may be necessary well in
33.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied
risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit,
theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions,
accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods
and other costs till the equipment is delivered at Site. The insurance policies to be taken should be
on replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be liable
to make good the full replacement/rectification value of all equipment/materials and to ensure their
availability as per project requirements.
33.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account
and will be included in Contract Price, However, the Owner may from time to time, during the pendency
of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and in such a case,
the parties to the Contract will agree for a mutual settlement, for reduction in Contract price to the
extent of reduced premium amount. The Contractor, while arranging the insurance shall ensure to
obtain all discounts on premium which may be available for higher volume or for reason of financing
arrangement of the project.
33.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site.
33.6 Special Conditions of Contract details out the various insurance liabilities.
34.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
35.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
35.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner
or his authorized agents, then the Contractor shall be given due extension of time for the completion
of the Works, to the extent such omission on the part of the Owner has caused delay in the
Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall
35.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if
such delays have resulted in any increase in cost. The Owner shall examine the justification for such
a request for claim and if satisfied, the extent of compensation shall be mutually agreed depending
upon the circumstances at the time of such an occurrence.
36.0 DEMURRAGE, WHARFAGE, ETC.
Seal & Signature of Bidder
All demurrage, warfare and other expenses incurred due to delayed clearance of the material or any
other reason shall be to the account of the Contractor.
37.0 FORCE MAJEURE
37.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence
could not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other
in writing of such causes.
37.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above:
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
38.0 SUSPENSION OF WORK
38.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works
without invalidating the provisions of the Contract. Orders for suspension or reinstatement of the
Works will be issued by the Engineer to the Contractor in writing. The time for completion of the works
will be extended for a period equal to duration of the suspension.
38.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of
the works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to some
default on the part of the Contractor or his Sub-Contractor.
39.0 “RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the contract
against the Contractor, the Owner shall be entitled to withhold and also have a lien to retain such sum
or sums in whole or in port from the security, If any, deposited by the Contractor and for the purpose
aforesaid, the Owner shall be entitled to encash and withhold the amount of Performance Bank
Guarantee or other security, if any, furnished as the case may be. The Owner shall also have a lien
over the same pending finalization or adjudication of any such claim. In the event Of the security is
insufficient to cover the claimed amount or amounts, the Owner shall be entitled to withhold and have
lien to retain to the extent of the such claimed amount or amounts referred to above, from any sum or
sums found payable or which at any time thereafter may become payable to the Contractor under the
same contract or any other contract with the Owner or GUVNL or its subsidiary companies pending
finalization or adjudication of any such claim.
Lien in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (Including the security deposit) under the
contract may be withheld or retained by way of lien by the Owner against any of its claim in respect
of payment of a sum of money arising out of or under any other contract made by the Contractor with
the Owner or GUVNL or any of its subsidiary companies.
b) It is on agreed that the sum of money so withheld or retained under this clause by the Owner will
be kept withheld or retained as such by the Owner till its claim arising out of the same contract or any
other contract is either mutually settled or determined by the arbitrator or competent court, as the case
may be, and the Contractor shall have no claim for interest or damages whatsoever on this account
or on any other ground in respect of any sum of money withheld or retained under this clause and as
may be duly notified to the Contractor.
40.0 CONTRACTOR`S DEFAULT
40.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse
or neglect to comply with any reasonable order given to him, in writing by the Engineer in connection
Seal & Signature of Bidder
with the works or shall contravene the provisions of the Contract, the Owner may give notice in writing
to the Contractor to make good the failure, neglect or contravention complained of. Should the
Contractor fail to comply with the notice within thirty (30) days from the date of serving the notice, then
and in such case the Owner shall be at liberty to employ other workmen and forthwith execute such
part of the works as the Contractor may have neglected to do or if the Owner shall think fit, without
prejudice to any other right he may have under the Contract to take the work wholly or in part out of
the Contractor’s hands and re-contract with any other person or persons to complete the works or any
part thereof and in that event the Owner shall have free use of all Contractor’s equipment that may
have been at the time on the Site in connection with the works without being responsible to the
Contractor for fair wear and tear thereof and to the exclusion of any right of the Contractor over the
same, and If the sum that the contractor is entitled to be paid plus the costs incurred by the Owner in
completing the works, exceeds the Contract Price or the entire works if entire works have been
completed or the price for part of the work if part of the works have been completed, the Contractor
shall be liable for such excess.
If such excess is greater than the sums due to the Contractor, the Contractor shall pay the balance to
the Owner and if such excess is less than the sums due to the Contractor, Owner shall pay the balance
to the Contractor. For facilitating such payment, Owner shall pay the balance to the contractor. For
facilitating such payment, Owner shall encash the Bank Guarantees of Contactor available with
Owner/s and retain such other payment due to the Contractor under the Contract in question or any
other Contract that the Owner/s may have with the Contractor. Such payment of excess amount shall
be independent of the liquidated damages for delay which the Contractor shall have to pay if the
completion of works is delayed.
40.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay
liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
40.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not
entitle the Contractor to reduce the value of the Contract Performance Guarantee nor the time thereof.
The Contract Performance Guarantee shall be valid for the full value and for the full period of the
Contract including guarantee period.
41.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
41.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other
than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event
give fifteen (15) days notice in writing to the Contractor of his decision to do so.
41.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts
to the extent they are related to the work terminated and terms satisfactory to the Owner, stop all
further sub-contracting or purchasing activity related to the work terminated, and assist Owner in
maintenance, protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
41.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and
if the Contractor is a partnership concern and one of the partners dies then unless the Owner is
satisfied that the legal representatives of the individual Contractor or of the proprietor of the propriety
concern and in the case of partnership, the surviving partners, are capable of carrying out and
completing the Contract the Owner shall be entitled to cancel the Contract as to its incomplete part
without being in any way liable to payment of any compensation to the estate of deceased Contractor
and/or to the surviving partners of the Contractor’s firm on account of the cancellation of the Contract.
The decision of the Owner that the legal representatives of the deceased Contractor or surviving
partners of the Contractor’s firm cannot carry out and complete the Contract shall be final and binding
on the parties. In the event of such cancellation the Owner shall not hold the estate of the deceased
Contractor and/or the surviving partners of the estate of the deceased Contractor and/or the surviving
partners of the Contractor’s firm liable to damages for not completing the Contract.
42.0 FRUSTRATION OF CONTRACT
Seal & Signature of Bidder
42.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section
of the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance
portion of the Contract, subject to provisions contained in sub-clause 42.3 below.
42.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason
of willful or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties
hereto shall be relieved from carrying out further obligations under the Contract treating it as frustration
of the Contract.
42.3 In the event referred to in sub-clauses 42.1 & 42.2 above the parties shall mutually discuss to arrive
at reasonable settlement on all issues including amounts due to either party for the work already done
on quantum merit basis which shall be determined by mutual agreement between the parties.
43.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor
or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their
behalf in relation to the obtaining or to the execution of this or any other Contract with the Owner, shall
in addition to any criminal liability which it may incur, subject the Contractor to the cancellation of this
and all other Contracts and also to payment of any loss or damage to the Owner resulting from any
cancellation. The Owner shall then be entitled to deduct the amount so payable from any monies
otherwise due to Contractor under the Contract.
E. RESOLUTION OF DISPUTES
44.0 SETTLEMENT OF DISPUTES
44.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
44.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor,
arising out of the Contract for the performance of the Works whether during the progress of the Works
or after its completion or whether before or after the termination, abandonment or breach of the
Contract, it shall, in the first place, be referred to and settled by the Engineer, who, within a period of
thirty (30) days after being requested by either party to do so, shall give written notice of his decision
to the Owner and the Contractor.
44.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and
binding upon the parties until the completion of the Works and shall forthwith be given effect to by the
Contractor who shall proceed with the Works with all due diligence, whether he or the Owner requires
arbitration as hereinafter provided or not.
44.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has
been communicated to him by either party within thirty (30) days from the receipt of such notice, the
said decision shall become final and binding on the parties.
44.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being
requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with
any such decision, or within thirty (30) days after the expiry of the first mentioned period of thirty days,
as the case may be, either party may require that the matters in dispute be referred to arbitration as
hereinafter provided.
45.0 ARBITRATION
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this
contract with reference to the construction, interpretation, breach, termination or validity thereof
(hereinafter referred as "the Dispute") shall, upon the written request of either Party be referred to the
authorized representatives of the Disputing Parties for resolution. The authorized representatives shall
promptly meet and attempt to negotiate in good faith a resolution of the Dispute within thirty days of
the service of the request.
(2) Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as indicated
herewith in sub clause (1) of Clause, arising under or in connection with the present works contracts,
Seal & Signature of Bidder
whether pertaining to works contracts alone or works and procurement both, the same shall be
referred to arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
46.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering payments claimed
and the payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner.
The Contractor shall also prepare and submit a detailed account of Owner Issue materials received
and utilized by him for reconciliation purpose in a format to be discussed & finalized with the Owner
before the award of Contract.
47.0 TAKING DELIVERY AND INSURANCE
47.1 The contractor has to take delivery from construction store of Tower material, H-frame structure
material, conductor & line material keeps S/S materials in safe custody and transport to the respective
sites and will be fully responsible for any damage to or loss of all materials at any stage during
transportation or erection or taking over of the line by GETCO.
47.2 The Contractor has to open site store and ensure for safe custody of all the stored materials at his
47.3 The Contractor shall have total responsibility for the entire tower & line materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable security
arrangements at his own cost to ensure the protection of all materials, equipment and works from
theft, fire pilferage and any other damages and loss. It shall be the responsibility of the contractor to
arrange for security till the works are finally taken over by the Corporation.
48.0 STORAGE-CUM-ERECTION INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of
NIL Cost of S/S / Line material, which is required to complete the S/s / line / shifting work. Bidder shall
have to take the comprehensive Marine Cum Erection (Overall) insurance policy against any loss,
damage, theft, pilferage, fire etc. for the complete period of storage, erection and commissioning up
to the time of taking over of the sub-station / line by GETCO. However, if the work is not completed
within the stipulated time limit as mentioned into work order, the MCE shall be extended by the
contractor up to the work completion and taking over of the line or S/s by GETCO. Moreover, the
charge for extension of insurance shall be borne by contractor if the delay is attributed to the
contractor. The charge for extension of insurance shall be reimbursed by GETCO to the contractor on
production of proof for extension of MCE if the delay is attributed on the part of GETCO. The contractor
shall deal directly and pursue the claim with the insurance company and shall be responsible in regard
to maintenance of all insurance coverage as well as for settlement of claim. The proof of insurance
policy taken by the contractor shall be furnished / submitted to engineer-in-charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further, in absence
of the above insurance policy, R.A.bill payment will be withheld.
Bidder shall note that storage cum erection insurance is to be taken at his own cost and amount of
material for erection to complete the scope of sub-station work is to be considered Rs. NIL.
49.0 Termination of Contract:
In case of contractor fails to complete the transmission line work or part thereof within contractual
period or in case the work is found not in accordance with prescribed specification the GETCO
shall exercise its discretionary power either:
49.1 To recover, from the contractor as agreed, by way of penalty clause above applicable taxes (if
49.2 To get the work done other contractor after giving due notice to the contractor on account and at
the risk of the contractor for such work executed or other similar description without canceling the
contract in respect of the works not yet due for completion or
50.0 To cancel the contract.
In the event of the risk works of similar description, the opinion of the GETCO shall be final. In the
event of action taken under clause (A) or (B) above, the contractor shall be liable to pay for any
Seal & Signature of Bidder
loss which the GETCO may sustain on that account, but the contractor shall not be entitled to
have any saving on such purchases made against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any
time for rejection of the stores.
51.0 LABOUR LAWS:
51.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be
employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
51.2 Contractor shall maintain a valid labor license under the contract Labor (Regulation and abolition) Act
for employing necessary manpower required by him. In the absence of such license, the contract shall
be liable to be terminated without assigning any reason thereof.
51.3 The Contractor shall at his own expenses comply with all labor laws and keep the GETCO indemnified
in respect thereof. Some of the major liabilities under various labor and industrial laws which the
Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or
other Statutory Authority.
ii) Payment of deposit in respect of each contract labor at the rate of Rs. 30/- or later prevailing
rate with the Office of Commissioner of Labor as per the Contract Labor (Regulation and
Abolition) Act.
iii) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day
for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial
Dispute Act. Any payment to the Contractor’s employee arising out of any claim of disputes
under the Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed
under the various labour laws, in force from time to time, from Statutory Authorities like State
Government/ Government o India, which the Contractor shall have to comply with.
51.4 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee.
Provident Fund and Family Pension Scheme at the rate of 18% (or at the rate made applicable by the
Government from time to time of the wages. The Contractor’s contribution and his worker’s
contribution towards Provident Fund and Family Pension Scheme shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad.
51.5 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of
the Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional
Provident Fund Commissioner, Ahmedabad.
51.6 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
Seal & Signature of Bidder
51.7 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labor, shall
be provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for
individual laborer which shall be duly verified, approved and certified by the authorized Officer of the
51.8 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the
liability insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pungency of the
51.9 The contractor shall employ adequate number of experienced skilled at site for daily supervision and
for maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
51.10 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO
also, Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and
expenses whatsoever, arising out of or in connection with the matters referred herein above elsewhere
and against all actions, proceedings, claims, demands, costs and expenses which may be made
against the GETCO or Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for intervention of authority Government for or in respect
of performance of his obligation under the contract documents. The GETCO shall not be liable for or
in respect of or in consequence of any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and keep
indemnified the GETCO against all claims, demands, proceedings, cost, charges and expenses
whatsoever in respect thereof or in relation thereto.
51.11 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this
contract. If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide
workmen’s employer’s liability insurance for the latter’s employees, such employees shall be covered
under the Contractor’s Insurance.
51.12 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates fixed under
the minimum wages act. The wages of every Contract Labor employed by him under this contract
shall also be paid by him before the expiry of 7th day of the last day of the month in respect of the
wages are payable (i.e. wages of a month have to be paid by him in the first week of the next month).
Any default will result in cancellation of contract forthwith or else the contractor shall be punishable
to the extent of Rs. 100/- per each day or as per the prevailing rules of labor laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case of
labor trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his office
outside the factory work premises and the Contractor shall arrange to have his office outside the
factory work premises and the Contractor shall keep himself present throughout the working hours.
52.0 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the
Date: Superintending Engineer
(Signature of Contractor) GETCO,C.O., Jambuva
Seal & Signature of Bidder
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these specifications
& document and shall govern the portion of the work of this Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his representative
at Site suitably designated for the purpose of overall responsibility and coordination of the works to
be performed at Site. Such person shall function from the Site office of the Contractor during the
pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the
Payment of Wages Act (both of the Government of India) and the rules made there under in respect
of any employee or workman employed or engaged by him or his Sub-Contractor. He shall abide by
labour laws and others as specified in the special conditions of contract.
2.2 All initial registration and statutory inspection fees, if any, in respect of his work pursuant to this
Contract shall be to the account of the Contractor. Should any such inspection or registration need to
be re-arranged due to the fault of the Contractor or his Sub Contractor, the additional fees to such
inspection and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all tower, H-frame, Stringing and other line material brought to the Site
for the purpose of erection, testing and commissioning of the line to be erected under the Contract.
The Owner shall continue to hold the lien on all such material throughout the period of Contract. No
material brought to the Site shall be removed from the Site by the Contractor and/or his Sub-
Contractors without the prior written approval of the Engineer.
4.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative shall
be communicated to the said authorized resident representative of the Contractor and the
representative shall be available at a stated address for this purpose.
5.0 ACCESS TO SITE AND WORKS ON SITE
5.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in
reasonable time.
5.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the
Owner may approve and the Owner shall give the Contractor reasonable facilities for carrying out the
5.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site,except by the
special permission, in writing of the Engineer or his representative.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the Owner
and doing work in the vicinity of the Works under the Contract. The Contractor shall also so arrange
to perform his work as to minimize, to the maximum extent possible, interference with the work of
other Contractors and their workmen. Any injury or damage that may be sustained by the employees
of the other Contractors and the Owner, due to the Contractor’s work shall promptly be made good at
the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence of any
Seal & Signature of Bidder
representative or employee of the Contractor at the Site, if in the opinion of the Engineer such
employee has misconduct himself or is incompetent or negligent or otherwise undesirable and then
the Contractor shall remove such a person objected to and provide in his place a competent
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method of
work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the field
activities. Such reviews shall also not be considered as an assumption of any risk or liability by the
Engineer or the Owner or any of his representatives and no claim of the Contractor will be entertained
because of the failure or inefficiency of any such plan or schedule or method of work reviewed. The
Contractor shall be solely responsible for the safety, adequacy and efficiency of plant and equipment
and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the
safety of all persons employed by him or his Sub–Contractor and all the properties under his custody
during the performance of the work. This requirement shall apply continuously till the completion of
the Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall highlight
comparison to the schedules. The report shall also indicate the reasons for the variance between the
scheduled and actual progress and the action proposed for corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hour’s schedule
for the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged
works to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging,
allowances and other payments to the Contractor’s employees shall be the sole responsibility of the
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency
under any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour
Regulation Abolition Act or any other law due to act of omission of the Contractor, the Owner may
make such payment and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
13.1 Space : Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at
site, land for construction of Contractor’s field office, workshop, stores,etc. required for execution of the
Contract. Any such temporary construction shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer. Until and
unless the Contractor has handed over the vacant possession of land allotted to him for the above
purpose, the payment of his final bill shall not be made.
13.2 Electricity:
Seal & Signature of Bidder
The concerned Executive Engineer shall apply for temporary connection at site.Sub-division paying
required service charges & deposit.Such temporary connections to be released on the name of
Contractor on recommendation of the concerned Executive Engineer. The power so consumed shall be
charged at the prevailing tariff rate
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings required
for pre-assembly, erection, of the Towers, H-frame, string, earthing etc, covered under the Contract.
He shall submit a list of all such materials to the Engineer before the commencement of work at Site.
These tools and tackles shall not be removed from the Site without the written permission of the
The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personals shall be trained in
administering first-aid.
14.3 Cleanliness
The Contractor shall be responsible for keeping the entire area allotted to him clean and free from
rubbish, debris etc. during the period of Contract. The Contractor shall employ enough number of
personnel to keep the work area clean. Materials and stores shall be so arranged to permit easy
cleaning of the area. In areas where equipment might drip oil and cause damage to the floor surface,
a suitable protective cover of a flame resistant, oil proof sheet shall be provided to protect the floor
from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings. The
Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical control
points will be established and marked by the Engineer at site at suitable points. These points shall be
used as datum for the works under the Contract. The Contractor shall inform the Engineer well in
advance of the times and places at which he wishes to do work in the area allotted to him so that
suitable datum points may be established and checked by the Engineer to enable the Contractor to
proceed with his works. Any work done without being properly located may be removed and/or
dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize fire
hazards to the extent practicable. Combustible materials, combustible waste and rubbish shall be
collected and removed from the Site at least once each day. Fuels, oils and volatile or inflammable
materials shall be stored away from the construction and equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for fire
fighting. Enough of such trained personnel must be available at the Site during the entire period of the
The Contractor shall have total responsibility for all equipment and materials in his custody/stores,
loose, semi-assembled and/or erected by him at Site. The Contractor shall make suitable security
arrangements ensure the protection of all materials, equipment and works from theft, fire, pilferage
and any other damages and loss.
18.0 MATERIALS HANDLING AND STORAGE
18.1 All the material furnished under the Contract and arriving at Site shall be promptly received, unloaded,
transported and stored in the storage spaces by the Contractor.
18.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of
any damages, storage, discrepancy etc, for the purpose of Engineer’s information only. The
Contractor shall submit to the Engineer every week a report detailing all the receipts during the week.
However, the Contractor shall be solely responsible for any shortages or damages in transit, handling
and / or in storage and erection of the equipment at Site. Any demurrage, wharf age and other such
charges claimed by the transporters, railways etc, shall be to the account of the Contractor.
Seal & Signature of Bidder
18.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment
materials received by him for the purpose of erection and keep such record open for the inspection of
the Engineer in-charge.
18.4 All material shall be handled very carefully to prevent any damage or loss. The equipment stored shall
be properly protected to prevent damage either to the equipment or to the floor where they are stored.
The equipment from the store shall be moved to the actual location at the appropriate time so as to
avoid damage of such equipment at Site.
18.5 All material shall be protected against moisture ingress and corrosion during storage and periodically
18.6 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected
and stored in a suitable manner to prevent damage or deterioration in quality by storage.
18.7 All the materials stored in the open or dusty location must be covered with suitable weatherproof and
flame proof covering material wherever applicable.
18.8 If the materials belonging to the Contractor are stored in areas other than those earmarked for him,
the Engineer will have the right to get it moved to the area earmarked for the Contractor at the
Contractor’s cost.
18.9 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment,
which require indoor storage. Normally, all the electrical equipment such as motors, control gears,
generators, exciters and consumables like electrodes, lubricants etc. shall be stored in the closed
storage space. The Engineer, in addition, may direct the Contractor to move certain other materials,
which in his opinion will require indoor storage, to indoor storage areas, which the Contractor shall
strictly comply with.
19.0 CONSTRUCTION MANAGEMENT
19.1 The field activities of the Contractors working at Site will be coordinated by the Engineer and the
Engineer’s decision shall be final in resolving any disputes or conflicts between the Contractor and
other Contractors and the tradesmen of the Owner regarding scheduling and coordination of work.
Such decision by the Engineer shall not be a cause for extra compensation or extension of time for
the Contractor.
19.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of discussions
during the meeting and the decision of the Engineer and shall strictly adhere to those decisions in
performing his works. In addition to the above weekly meeting, the Engineer may call for other
meetings either with individual Contractors or with selected number of Contractors and in such a case
the Contractors if called, will also attend such meetings.
19.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his
works in accordance with the specified construction schedule. If at any time, the Contractor is falling
behind the schedule, he shall take necessary action to make good for such delays by increasing his
work force or by working overtime or otherwise accelerate the progress of the work to comply with the
schedule and shall communicate such actions in writing to the Engineer, satisfying that his action will
compensate for the delay. The Contractor shall not be allowed any extra compensation for such
19.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or
supply or any other services to the Contractor except for the coordination work between various
Contractors if any at site.
20.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above Contract
Documents, drawings, specifications, and supplementary data, etc. effected at the field and on
completion of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the equipment furnished
and erected under the Contract. Such drawings and Engineering data shall be submitted to the
Engineer in required number of copies.
21.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
21.1 The Contractor shall bring to Site all materials, including construction equipment, tools and tackles for
the purpose of the works under intimation to the Engineer. All such goods shall, from the time of their
being brought vest in the Owner, but may be used for the purpose of the works only and shall not on
Seal & Signature of Bidder
any account be removed or taken away by the Contractor without the written permission of the
Engineer. The Contractor shall nevertheless be solely liable and responsible for any loss or
destruction thereof and damage thereto.
21.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or
owing to him by the Contractor, under, in respect of or by reasons of the Contract. After giving a
fifteen (15) days notice in writing of his intention to do so, the Owner shall be at liberty to sell and
dispose off any such goods, in such manner as he shall think fit and to apply the proceeds in or
towards the satisfaction of such sum or sums due as aforesaid.
21.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of the
Engineer the materials such as construction equipment, erection tools and tackles, scaffolding etc.
with the written permission of the Engineer.
22.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
22.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner
and the employees of other Contractors and Sub-Contractors and all public and private property.
23.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and
Conditions of Contract of this Volume-I, the following provisions will also apply to the portion of works
to be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
23.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his Sub-Contractor’s employee, which for any
reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be less
Workmen’s : As per statutory
Compensation Provisions
Employee’s : As per statutory
Liability Provisions
23.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease
or death of members of public or damage to property of others, due to any act of omission on the part
of the Contractor, his agents, his employees, his representatives and Sub-Contractors or from riots,
strikes and civil commotion.
23.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-
Contractors, his agents and his employees have to perform work pursuant to the Contract.
23.5 The above are only illustrative list of insurance covers normally required and it will be the responsibility
of the Contractors to maintain all necessary insurance coverage to the extent both in time and amount
to take care of all his liabilities either direct or indirect, in pursuance of the Contract.
24.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed without
subjecting the equipment and materials to adverse effects during inclement weather conditions, like
monsoon, storms etc. and during other unfavorable construction conditions. No field activities shall be
performed by the Contractor under conditions, which might adversely affect the quality and efficiency
thereof, unless special precautions or measures are taken by the Contractor in a proper and
satisfactory manner in the performance of such Works and with the concurrence of the Engineer.
Such unfavorable construction conditions will in no way relieve the Contractor of his responsibility to
perform the Works as per the schedule.
25.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may
come across during the course of performance of his Works either during excavation or elsewhere,
are properly protected and handed over to the Engineer. Similarly, the Contractor shall ensure that
the bench marks, reference points, etc, which are marked either with the help of Engineer or by the
Seal & Signature of Bidder
Engineer shall not be disturbed in any way during the performance of his Works. If any work is to be
performed which disturbs such reference the same shall be done only after these are transferred to
other suitable locations under the direction of the Engineer. The Contractor shall provide all necessary
materials and assistance for such relocation of reference points etc.
26.0 WORK & SAFETY REGULATIONS
26.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to GETCO or to others, working at the Site. The Contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the relevant
legislations and the Engineer, as he may deem necessary.
26.2 All equipment used in construction and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be absolutely
safe. All equipment shall be strictly operated and maintained by the Contractor in accordance with
manufacturer’s Operation Manual and safety instructions and as per Guidelines/rules of GETCO in
26.3 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out in
accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall be
properly maintained by the Contractor and will be promptly produced as and when desired by the
Engineer or by the person authorized by him.
26.4 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
26.5 The Contractor shall provide safe working conditions to all workmen and employees at the Site
including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be
erected under the control and supervision of an experienced and competent person. For erection,
good and standard quality of material only shall be used by the Contractor.
26.6 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the Owner or other Contractors under any circumstances, whatsoever, unless expressly
permitted in writing by GETCO to handle such fuses, wiring or electrical equipment
26.7 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other
Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be
26.8 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall
be an earthed metal sheath surrounding the cores.
26.9 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No weight
of any description will be imposed on any cable and no ladder or similar equipment will rest against
or attached to it.
26.10 No repair work shall be carried out on any live equipment. The equipment must be declared safe by
the Engineer and a permit to work shall be issued by the Engineer before any repair work is carried
out by the Contractor. While working on electric lines/equipment, whether live or dead, suitable type
and sufficient quantity of tools will have to he provided by the Contractor to
electricians/workmen/officers.
26.11 In case any accident occurs during the construction/ erection or other associated activities undertaken
by the Contractor thereby causing any minor or major or fatal injury to his employees due to any
reason, whatsoever, it shall be the responsibility of the Contractor to promptly inform the same to the
Engineer in prescribed form and also to all the authorities envisaged under the applicable laws.
26.12 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property, and/or equipment. In such cases, the Contractor shall be informed in writing about
the nature of hazards and possible injury/accident and he shall comply to remove shortcomings
promptly. The Contractor after stopping the specific work can, if felt necessary, appeal against the
Seal & Signature of Bidder
order of stoppage of work to the Engineer within 3 days of such stoppage of work and decision of the
Engineer in this respect shall be conclusive and binding on the Contractor.
26.13 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to safety
reasons as provided in Para 31.18 above and the period of such stoppage of work will not be taken
as an extension of time for completion of work and will not be the ground for waiver of levy of liquidated
26.14 It is mandatory for the Contractor to observe during the execution of the works, requirements of Safety
Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so
as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper introduction
as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire
prone areas and adequate fire-fighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient first
aid to the injured.
e) Requirements of ventilation in underwater working to licensed and experienced divers, use of gum
boots for working in slushy or in inundated conditions are essential requirements to be fulfilled.
26.15 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy between
statutory requirement and GETCO Safety Rules referred above, the latter shall be binding on the
Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1, 00,000 + GST as applicable These are applicable
Causing death per person: for death
b. Major injuries or accident causing Rs. 20,000 + GST as applicable injury to any person,
25% or more permanent disablement per person whosoever.
to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and rules
framed there under or any other applicable laws as applicable from time to time. In case the Owner is
made to pay such compensation then the Contractor is liable to reimburse the Owner such amount in
addition to the compensation indicated above.
27.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment shall
be in accordance with the relevant Codes and accepted good engineering practice, the Engineer’s
drawings and other applicable Indian recognized codes and laws and regulation of the Government
Seal & Signature of Bidder
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars :
This part of the Bid Document relates to certain specific/special terms and conditions particular to the
Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC)
and Erection Conditions of Contract (ECC). The intent of provisions herein are specific to this contract
and are, in general, supplementary to related provisions under ITB,GCC and ECC. However, in certain
provisions which are contrary to those in ITB, GCC and ECC, the provisions in these Special
Conditions of Contract will prevail.
2.0 Tender Fee/ Earnest Money Deposit (EMD) :
Bidders shall compulsorily pay tender fee and EMD through RTGS/NEFT only.
a) Payment of Tender fee / Earnest Money Deposit ( EMD ) can be accepted by RTGS/ NEFT.
For payment through RTGS/NEFT the scan copies of payment made (transaction slip of payment
made) shall be uploaded online with the Tender documents on n-procure portal.
1. Bidder has to provide following detail on the same date of payment made so that receipt can be
generated at below mentioned e-mail ids:
Sr. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3. GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of Account GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
2.1 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant para elsewhere The bid guarantee shall be
made payable to the Owner without any condition whatsoever.
2.2 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-responsive.
No exemptions are made in the furnishing of the security.
2.3 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three
months from the date of submission of tender.
2.4 The successful bidders, Bid Security will be discharged upon, furnishing the contract Performance
2.5 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies within
thirty days of letter of award of contract)
2.6 Bidders are requested to pay an earnest money deposit by RTGS/NEFT. Banker’s cheque /
Seal & Signature of Bidder
demand draft shall not be accepted.
2.7 Tenders no accompanied by EMD shall be rejected.
2.8 If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the EMD
shall be forfeited and the tenderer may be disqualified from tendering for future works of GETCO.
2.9 The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned to
the successful tenderer after he furnishes the Security Deposit for performance and duly enters
into the contract. If he fails to furnish the SD or to execute the contract for the work offered to
him, his EMD shall be forfeited and the tenderer may be disqualified from tendering for further
works for GETCO.
3.0 Validity period: The offers should be valid for minimum period of 180 Days from date of opening of
tender (Technical Bid).
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the
5.0 Qualifying Requirement: As mentioned in Qualifying requirement. Bidder shall have to upload
scanned copies of original (Notarized/ self-attested copies of original-as specified in QR) online
through n-procure.
6.0 SCOPE OF WORK: As mentioned in Qualifying Requirement.
7.0 Price Inclusions (including Taxes & Duties):
7.1 Goods & Service tax (GST): GST & Cess as applicable shall be payable/receivable as
mentioned in clause 12 of ITB.
7.2 The prices quoted shall be all inclusive of freight, transportation, loading, –unloading & stacking at site
of materials supplied by Contractor as well as owner supplied item if any.
7.3 No extra payment toward any type of templates including extension & special tower and erection tools
/materials will be made.
7.4 Evaluation of the tender shall be carried out on end cost basis.
7.5 Statutory Variations:
Any statutory increase or decrease in the taxes and duties subsequent to your offer if it takes place
within the original contractual delivery date will be to the GETCO’s account subject to the claim being
supported by documentary evidence.However, if any decrease takes place after the contractual
delivery date, the advantage will have to be passed on to the GETCO.
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision
of Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.7 Welfare Cess:-
1. As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items
for supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey
projects, and civil works.The welfare cess @ 1% shall be paid by the contractor and the same
shall be reimbursed by employer on production of documentary evidence of payment.
2. Contractor shall get registered under Welfare Cess Act before commencement of work in required
head as per nature of work. Office of the Factory Inspector is authorized at present as a registering
3. GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment. Registration charges will not be reimbursed.
4. The contracts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO on
progressive basis of utilization. As this part of welfare cess is on GETCO account, the same shall
be reimbursed to the contractor on receipt of request letter along with documentary evidence of
payment. For calculation of welfare cess on supply part, valuation as per MR shall be taken and
informed to the contractor for payment. This will be over and above the A/T value. The modality
of payment/ reimbursement of welfare cess will be as under.
5. On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office. Copy of Registration certificate shall be
submitted before submission of 1st RA bill
6. Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence
of registration. Only thereafter, the bill will be processed for payment.
Seal & Signature of Bidder
7. Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
8. The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities.
9. The Welfare cess @1% is not considered in the estimate for this project & therefore , bidders are
reimbursement basis.
8.0 SECURITY DEPOSIT-CUM-PERFORMANCE GUARANTEE DEPOSIT
8.1 The successful bidder has to pay 100 % security deposit (5% of the Contract) upon placement
of LOI within 10 days.
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as
a Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable
either in BG/DD payable at Vadodara. Bank guarantees from following Banks will be acceptable.
(A) Guarantees issued by the following Banks will be accepted as SD on permanent basis.
1. All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to March
2026. The validity cut-off date in the GR is with respect to date of issue of Bank Guarantee
irrespective of date of termination of Bank Guarantee.1.
2. A U Small Finance Bank.
3. Bandhan bank
4 Barclays Bank
5. City Union Bank
7. DBS Bank India Limited
9 ESAF Small Finance Bank
10. Equitas Small Finance Bank
11 FEDERAL Bank
16. IDFC First Bank
17. Induslnd Bank
18. Jana Small Finance Bank
19 Jammu and Kashmir Bank
20. Karnataka Bank
21. Karur Vysya Bank
22. Kotak Mahindra Bank
23 Standard Chartered Bank
24. South Indian Bank
25. Tamilnadu Mercantile Bank
26. Utkarsh Small Finance Bank
27. Ahmedabad Mercantile Co-Operative Bank.
28. Nutan Nagrik Sahakari Bank Ltd.
29. Rajkot Nagarik Sahakari Bank Limited
30. Saraswat Co-Operative Bank Ltd.
31. SVC Co-Operative Bank Ltd.
32. The Cosmo Co-Op. Bank Ltd.
33. The Gujarat State Co-operative Bank.
34. The Mehsana Urban Co-Operative Bank Ltd.
35. The Surat District Co-Operative Bank Ltd.
36. The Surat People’s Co-Operative Bank Ltd.
37. The Kalupur Commercial Co-Operative Ban
38. Baroda Gujarat Gramin Bank
39. Saurashtra Gramin Bank
41 The Panchmahal District Co-operative Bank
Seal & Signature of Bidder
42 The Baroda District Co-Operative Bank
Note: The banks shall be the banks recognized / notified by the Finance department, Government of
Gujarat (GOG) from time to time.
8.3 No interest will be allowed on amount of Security deposit.
8.4 The Security Deposit- total shall be kept deposited up to 12 months from the date of charging of line.
The same shall be released on receipt of N.O.C. from the concerned EE(const./ TR).
8.5 This security deposit is for the performance of contract and the same is liable to be forfeited by the
GETCO in event of non fulfillment of the terms and conditions of this contract by the contractor.
8.6 The SD cum performance bank guarantee towards execution of contract will be returned only on
successful execution of guarantee period ( 12 months from date of charging line) of the contract.
8.7 Corporate Guarantees are not admissible.
8.8 The ‘Signing of Contract ‘and ‘Contract Agreements’ will be done as per prevalent GETCO Terms and
8.9 A/T shall be issued on receipt of Bank Guarantees, contract agreement & Indemnity Bond within
days of issue of LOA.
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in materials, poor
workmanship or defect/ wrong design etc. for a period of one year from date of completion of work
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in work execution beyond Contractual cutoff date stated as
per stipulated delivery period shall be subject to the penalty at the rate of ½ % of the delayed work
value plus applicable taxes (if any) per week or part thereof, with a ceiling of 10 % of the total contract
value plus applicable taxes (if any).
10.2 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be
entitled to deduct the amount of Penalty for delay from the amounts payable to the Contractors under
any bills raised under this contract or any other contract with the GUVNL and its Subsidiary
Companies i.e. GETCO, GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the
Owner to adjust the amount of Penalty of delay against any Bank Guarantee furnished by the
Contractor under this contract or any other contract with GUVNL and/or its subsidiary companies.
10.3 The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
11.0 COMPLETION PERIOD
11.1 Overall Completion period for this Contract will be 45 Days from the date of issue of work
11.2 Susseccuful bidder shall have to engage Two separate gang for both locations i.e. 220KV
Chandrapura S/S and 400KV Asoj S/S to complete subjected work in overall time limit of
11.3 No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
11.4 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the GETCO/Engineer and is complete in all
respects as per the terms and conditions of this Contract.
12.0 Presentation of Bills and Payment Terms
12.1 Bidder shall have to submit First & final bill for the work executed with other required data to the
respective Sub-station in-charge of the work of respective AM Divisions ( i.e. For 220KV Chandrapura
s/s under Godhra AM Division and 400KV Asoj S/S under Jambuva AM Division ) within 3 months
from the date of completion of work, for necessary payment.
12.2 All the bills in accordance with the above clauses must be submitted with the following information:
a) Item wise work done .
Seal & Signature of Bidder
12.3 The payment will be released within 60 days. However, in case of any delay due to any eventuality no
interest charges shall be paid. The payment will be made by respective Division offices though
PAYMENT TERMS UNDER MSME ACT:
(1) You have to update your MSME detail on GETCO’s website by following link https://getco.co.in/msme/
(and intimate to concern bill submitting office with copy to this office).
(2) The payment will be made within 45 days from the *date of acceptance or the **date of deemed
acceptance of goods or Services i.e. After submission of all required documents as per AT Terms &
time to time circular issued by GETCO’s Corporate Office as well as statutory requirement to process
* “Date of acceptance” means
(a) The day of actual delivery of goods or the rendering of services; or
(b) Where any objection is made in writing by the buyer regarding acceptance of goods or
services, the day on which such objection is removed by the supplier;
** “Date of deemed acceptance” means
where no objection is made in writing by the buyer regarding acceptance of goods or services within
fifteen days of the delivery of the goods or the rendering of services, the day of the actual delivery of
goods or the rendering of services
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of work.
14.0 The contractor shall have to execute indemnity bond on Non-judicial Stamp paper of value Rs. 300/-
to GETCO for material as per attached format. The cost of stamp paper will be born by the contractor.
15.0 Also the successful bidder shall have to execute Agreement on stamp paper of value Rs.300/- at our
Circle office Jambuva before commencement of works as per GETCO’s prescribed Performa. The
cost of stamp paper will be born by the contractor.
16.0 The contractor shall have to execute safety cum indemnity on Non-judicial Stamp paper of value Rs.
300/- to GETCO against any possible claim of compensation for damage to contractor’s staff or any
of third party during the execution of work. The cost of stamp paper will be born by the contractor.
17.0 SAFETY CLAUSE
The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy between
statutory requirement and GETCO Safety Rules referred above, the latter shall be binding on the
Contractor unless the statutory provisions are more stringent.
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
compensation and liability as per statutory requirement, contractor / agency shall be penalized as
Sr. No Amount of Contract in Rs. Penalty amount
Rs.5000/- plus applicable taxes (if
Rs.40000/- plus applicable taxes (if
2 Above1 Lac to 10 Lacs
Rs.100,000/- plus applicable taxes (if
3 10 to 100 Lacs
4 > 100 Lacs 1.0 % plus applicable taxes (if any)
1. The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of
fatal/Non-fatal accident occurred to human being.
Seal & Signature of Bidder
2. The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3. Safety Requirement:
i) Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s
site in charge and supervisor. Safety document shall be handed over and vital safety norms and
key points of safety related to project shall be explained and recorded for commitment by erection
contractor. Such records are mandatory for clearing first erection bill.
ii) During site visit by GETCO official of Executive Engineer and above rank, the following checks
during execution of work shall be covered.
I. Safety equipment available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
II. Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
III. T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
iii) If above-mentioned safety requirements found violated in any of the above three conditions shall
attract penalty of Rs.1000/- plus applicable taxes (if any) per occasion. (Max.Rs.3000/--for violation
of three conditions)
iv) During subsequent visit, if violation is found, then double penalty applicable taxes (if any) shall be
deducted from the bill of the Contractor/Agency.
18.0 “RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the contract
against the Contractor, the Owner shall be entitled to withhold and also have a lien to retain such sum
or sums in whole or in port from the security, If any, deposited by the Contractor and for the purpose
aforesaid, the Owner shall be entitled to encash and withhold the amount of Performance Bank
Guarantee or other security, if any, furnished as the case may be. The Owner shall also have a lien
over the same pending finalization or adjudication of any such claim. In the event of the security is
insufficient to cover the claimed amount or amounts, the Owner shall be entitled to withhold and have
lien to retain to the extent of the such claimed amount or amounts referred to above, from any sum or
sums found payable or which at any time thereafter may become payable to the Contractor under the
same contract or any other contract with the Owner or GUVNL or its subsidiary companies pending
finalization or adjudication of any such claim.
Lien in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (Including the security deposit) under the
contract may be withheld or retained by way of lien by the Owner against any of its claim in respect
of payment of a sum of money arising out of or under any other contract made by the Contractor
with the Owner or GUVNL or any of its subsidiary companies.
b) It is on agreed that the sum of money so withheld or retained under this clause by the Owner will
be kept withheld or retained as such by the Owner till its claim arising out of the same contract or
any other contract is either mutually settled or determined by the arbitrator or competent court, as
the case may be, and the Contractor shall have no claim for interest or damages whatsoever on this
account or on any other ground in respect of any sum of money withheld or retained under this
clause and as may be duly notified to the Contractor.
Seal & Signature of Bidder
SPECIAL TERMS AND CONDITIONS
The terms and condition of this section will be read in conjunction with general terms and condition of tender.
However, wherever, ambiguity observed, terms and condition mentioned under Special Terms and Condition
will supersede the General Terms and Condition of tender.
1. Scope of work:- Work of Painting of structures and foundations of various KV Class equipment and Gantry
in Switchyard with supply of approved make Distemper paint and Anti rusting black paint at 220KV
Chandrapura S/S under Godhra AM division & 400KV Asoj S/S under Jambuva AM Division under
Subjected work shall be carried out with ISI mark approved paint
Subjected work include :
1.Distempering Work:
Providing two coats of Oil Bound Distemper (O.B.D.)/Weatherproof distemper of approved brand and
white colour over RCC Foundation.
Before distempering, the surface shall be thoroughly brushed to remove mortar droppings, dust, dirt, and
all foreign matter.
Surface preparation shall include making the surface even, smooth, and properly sand-prepared.
2. Anti-Rusting / Anti-Corrosion Treatment:
One coat of good quality Anti-rusting / Anti-corrosion Black Paint of standard approved make (Asian /
Berger / Nerolac) shall be applied to the bottom part of the structure up to 300 mm height from the finished
The surface shall be thoroughly cleaned and prepared to remove rust, dust, grease, or any other foreign
material before applying the coat.
Quality of paint shall be approved by concern EE before applying.
2. No Idling charges will be given by GETCO. For GETCO, Sunday is normally W/Off day and no work
arranged on this day. For that contractor is not liable for any idling charges. However, as per need, GETCO
may arrange outage on Sunday & contactor has to bind to execute the work.
3. On awarding of works, the contractor has to remain in constant touch with Executive Engineer (AM)/ In
charge of S/S. Scope of works will be as per Schedule - ‘B’ attached herewith and executed as per
instruction of Engineer-In-charge. Detail break up of work to be executed will be provided by S/S
Incharge.Scope includes sufficient men power with necessary permanent nature tools / tackles and vehicle
to carry out work within stipulated time limit.
4. Your authorized person has to remain present on the job continuously during execution of work. In absence
of your authorized man, further work will not be allowed to carry out and no compensation will be entitled
for non-working.
5. In the event of any accident or damage / theft, will be borne by the contractor and GETCO will not entertain
any claim in this regards.
6. Tools and tackles, man power and material etc., shall be arranged by successful bidder to execute works.
GETCO will not provide it or entertain any claim against it.
7. GETCO reserves the rights of retrenching and dismissing any person employed for the work if there is
complaint against his misbehaviour, misconduct or disloyalty towards job. GETCO is not responsible for
any financial loss thereof. Contractor should take care of such issue.
8. Conditional tender will not be accepted and straight away be rejected.
9. The successful bidder will have to indemnify the GETCO against any possible claim of compensation for
damage to his equipment or for injury to him, or fatal/non-fatal accident to human life, his staff or any other
person during execution of the above job. If for any reasons the GETCO is called upon to pay such claim
or compensation, the same will be recovered from him or his bills.
10. All safety precautions required before taking up the work is to be arranged by the contractor.
11. All the safety rules regarding human life and as per Indian Electricity Rules is to be observed by the
contractor. Any violation of safety rules, GETCO will not be responsible for the same.
SPECIAL INSTRUCTION FOR WORK :
Seal & Signature of Bidder
1.1 The painting works covered under this section consist of
1.Distempering Work:
Providing two coats of Oil Bound Distemper (O.B.D.)/Weatherproof distemper of approved brand and
white colour over RCC Foundation.
Before distempering, the surface shall be thoroughly brushed to remove mortar droppings, dust, dirt,
and all foreign matter.
Surface preparation shall include making the surface even, smooth, and properly sand-prepared.
2. Anti-Rusting / Anti-Corrosion Treatment:
One coat of good quality Anti-rusting / Anti-corrosion Black Paint of standard approved make (Asian /
Berger / Nerolac) shall be applied to the bottom part of the structure up to 300 mm height from the
finished ground level.
The surface shall be thoroughly cleaned and prepared to remove rust, dust, grease, or any other
foreign material before applying the coat.
1.2 The successful contractor shall carry out all addition / alteration required for completion of work the same
at rates quoted in the offer for respective item. However, No items to be executed for which prices are
1.3 All the colour, brush, tools required during painting shall be arranged by the contractor at his own cost.
The contractor shall only be responsible for any damage to and / or loss of his erection tools.
1.4 The contractor has to paint the structures to satisfaction of authority & should give guarantee for
at least two monsoons.
1.5 Quantities given in the Schedule in price Bid are to be executed by the contractor at the rates accepted
by GETCO in the A/T. In case of any deviation in, resulting into an increase in which event the field
officer shall obtain prior approval of the authority and excess quantity shall be paid only at the accepted
rate of the A / T.
1.6 The samples all colours to be got approval from competent authority prior to start of work.
1.7 Aforesaid work is to be carried out in stipulated time limit.
1.8 All works shall be carried out in accordance with the revised and latest provisions under Indian Electricity
Act and Rules made there under
1.9 All workers / labour of contractor & supervisors must use personal protective equipment (PPE)
during the work like gloves, safety belt, Safety shoes, Helmet, earthing rods, etc, duly approved
1.10 Aforesaid work should be planned in such a manner in consultation with the Engineer in charge of the
work that minimum shut down is required. Revenue loss due to any undue shut down i.e. after the
shutdown is arranged and required to be extended on account of contractor shall be recoverable from
the contractor.
1.11 The Contractor shall ensure that at the end of each sub-activity the surplus material is immediately
removed from the work-site to avoid loss and injury to the person.
1.12 Terms and conditions regarding Industrial laws minimum wages act PF and other statutory rules to be
followed strictly.
1.13 Labour laws are to be followed strictly - labour registration workmen compensation.
1.14 GETCO’s safety policy to be implemented strictly
1.15 Either the Contractor or his authorized Electrical supervisor shall have to remain present at site through
out the work for coordinating work activities, managing man power and to complete work in stipulated
1.16 Transportation shall be in the scope of the contractor for arrangement of labour pick up & drops at work
site.No any other charges will be provided by GETCO. (like mobilization, lodging, boarding,
transportation)
1.17 No idle labour days will be paid in the event of non-availability of shutdown or cancellation of work
1.18 Contractor has to maintain daily progress register at site, progress should be invariable entered on daily
basis & signed by Engineer in Charge.
1.19 ACCESS TO LOCATIONS:
It will be the contractor’s sole responsibility to take the materials up to the location at his cost. If, for any
reasons the above is not feasible, the contractor at his own cost shall have to arrange transportation by
3.1 The Contractor shall ensure that at the end of each sub-activity the surplus materials are immediately
removed from the work-site to avoid loss and injury to the human.
Seal & Signature of Bidder
SCHEDULE – ‘ A ‘
Following materials / equipments will be procured / arranged by the contractor for subjected work :
Oil Bound Distemper (O.B.D.)/Weatherproof distemper of approved brand and white colour
Good quality Anti-rusting / Anti-corrosion Black Paint of standard ISI mark approved paint ( make -
Asian / Berger / Nerolac)
Seal & Signature of Bidder
(Non Judicial Stamp Paper of Rs. 300/-)
KNOW ALL MEN BY THESE PRESENTS that we, Messer’s ___________________
_____________________________________________________ (hereinafter called “the Contractor” which
expression shall, where the context so admits, include their heirs, executors, administrators and legal
representatives, successors and permitted assigns) are hereby held and firmly bind unto the Gujarat Energy
Transmission Corporation Ltd (hereinafter called “the GETCO” which expression shall, where the context so admits,
include its successors and assigns) to refund the full amount of materials supplied by the GETCO under the terms
________________ against any loss damage or deterioration of whatsoever nature occurs to said materials
supplied by the GETCO and which are in the custody of the contractor at their works site, on behalf of the GETCO,
at (name of line) _________________________________________________ , and / or if any of the said
materials, when inspected by any officer authorized by the GETCO in this behalf, is found to be damaged, lost,
deteriorated in quality or quantity, the contractor hereby agrees to bind himself to indemnity and at all times keep
indemnified the GETCO against all loss, damage and deterioration to the any material supplied by the GETCO
during his custody and shall pay in cash on demand from the GETCO within 30 days the market value of such
materials which is lost, damaged or deteriorated in full to the GETCO and shall also hereby authorize the GETCO
to deduct the said sum from any sum due to the contractor or any sum which may at any time become due to the
contractor under the above referred contract or any other contract entered into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and
preservation of the said materials against all risks, excluding war risks and against loss, damage and deterioration
of whatsoever nature in respect of the said materials while it remains in the custody and possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized by the GETCO
Now the conditions of the above written bond are such that the contractor shall pay the full amount forthwith to the
GETCO in the event of loss, damage or deterioration or whatsoever except due to circumstances arising out of war
in respect of the materials supplied by the GETCO and shall fully and effectually indemnify and keep indemnified to
the GETCO against such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorized by the GETCO
and produce at any time when demanded.
THE WITNESS WHERE OF: We the
(Signature of contractor)
hereto signed at ___________________
In the presence of
____________address ______________ (Signature)
_____________address ______________ (Signature)
Seal & Signature of Bidder
PROFORMA FOR CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at BARODA the_____________ day of ___________ in the Christian Year Two
Thousand Twenty five between M/s. _____________________________________ (address of office)___
(hereinafter referred to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant
to the contract include its successors or permitted assigns) of the ONE PART and the Gujarat Energy
Transmission Corporation Ltd, having their Head office at Vidyut Bhavan, Race Course, Baroda 390
(hereinafter called “The GETCO” which expression shall unless excluded by or repugnant to the context
include its successors or assigns) of the other part.
WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors for
GETCO’s Order No. ______________________________________ _______________ hereinafter called
“the works” and more particularly described and enumerated or referred to in the specification, terms and
conditions prescribed in the order letter, covering letter and other letters and schedule of price which for the
purpose of identification have been signed by Shri ____________________________________ on behalf
of the contractors and by ---------------------------------- on behalf of the GETCO, a list whereof is made out in
the Schedule hereunder written and all of which said documents are deemed to form part of this contract and
included in the expression “The works” wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned.
AND WHEREAS THE GETCO has accepted the tender of contractors for the construction of the said works
for the sum of Rs. ___________________ Rupees (_______________
____________________________________________) upon the terms and subject to the conditions herein
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
1. The contractors shall do and perform all works and things in this contract mentioned and described
or which are implied therein or there from respectively or are reasonably necessary for the completion
of the works as mentioned and at the times, in the manner and subject to the terms and conditions
and stipulations contained in this contract, and in consideration of the due provision, executions,
supply and completion of the works agreed to by the contractor as aforesaid the Board doth hereby
covenant with the contractor to pay all the sums of moneys as and when they become due and payable
to the contractors under the provisions of the contract. Such payment to be made at such times and
in such manner as is provided by the contract.
2. The conditions and covenants stipulated here-in-before in this contract are subject to and without
prejudice to the rights of the Board to enforce penalty for delays and / or any other rights whatsoever
including the right to reject and cancel on default or breach by the contractor of the conditions and the
covenants as stipulated in the general conditions, specifications, forms or tender schedule etc.
attached with GETCO’s Order No. __________________________________
The contract value, extent of supply & erection works, delivery dates, specifications and other relevant
matters may be altered by mutual agreement and if so altered shall not be deemed or construed to
mean or apply to affect or alter other terms and conditions of the contract and the general conditions
and the contract so altered or revised shall be and shall always be deemed to have been subject to
and without prejudice to said stipulation.
List of documents forming part of the contract:
1. GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated
2. GETCO order No. Dtd. _____ / ______/
3. Contractor’s acceptance of order vide letter no. _______________.
4. Contractor’s Partnership Deed dtd. ________________.
5. Contractor’s Power of Attorney / Board Resolution authorizing person to sign on behalf of Firm.
Seal & Signature of Bidder
In witness whereof the parties here to have set their hands and seals this day and month, year first above
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of M/s. __________________ (Signature)
In the presence of (Full Name, Address and Signatures)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
for and on behalf of Gujarat Energy Transmission Corporation Ltd
Circle Office, Jambuva, BARODA - 390
In the presence of name, Full address and Signature:
Seal & Signature of Bidder
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we, _______________________________ by this
SAFETY CUM INDEMNITY BOND Executed on this _____________ Day of _________ 2025. We
Having Registered Office _______________________________(herein after called “THE CONTRACTOR”
which expression shall mean and includes my /our heirs, executors, administrators and legal representatives,
successors and permitted assigns) do hereby binds myself/ourselves and also our company/firms after having
the power to bind by this promise and undertaking in favour of the Gujarat Energy Transmission
Corporation Limited (GETCO), Vadodara a State Transmission Utility under The Electricity Act,
having its registered office at Sardar Patel Vidyut Bhavan, Race course, Vadodara.( hereinafter called as
GETCO, which expression shall mean and include its legal representative, administrators assigns) has
agreed under the terms and conditions of the contract no.______ dated_______made between
_________________________ interalia on production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time to
the extent of Rs.________________________
or damages, costs, charges and expenses caused to or suffered by reason of the CONTRACTOR
while Project, R&M, O&M work including work carried out by outsourcing agency, failing to take proper
care or not complying the guidelines given hereunder as per Annexure-A and instructions which may be
given from time to time during the continuance of the contract and we further undertake to unconditionally
pay the amount claimed by the GETCO on demand and without demur to the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under order
GETCO after having observing necessary formalities, the details of which is described in the order
and whereas the said job/works will be /likely to be done in places covered under Employees’ State
Insurance Act,1948 (ESI) and /or the Workmen Compensation Act,1923 and /or other laws relating to
the Labour Management and Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under obligation to
execute this Safety cum Indemnity Bond before the commencement of actual execution of work.
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the guidelines
as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether there has
been any breach of the guidelines as per Annexure-A of this bond and as to the extent of the loss,
damages, costs, charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged because
of the change in the constitution of the GETCO or for the extension of the time limit or for any other
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO from
all claims, actions, proceedings and risk, damage danger to any person whether belonging or not belonging
to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation, damages
any proceedings in respect of any of its employee / workmen under the Workmen Compensation Act
or any other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order mentioned
hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with guidelines
as per Annexure-A or terms and conditions / formalities within the meaning of Employees’ State
Insurance Act,1948 (ESI) or Workmen Compensation Act 1923 or any other laws relating to the Labour
Welfare for the time being in force, and also has not observed the safety norms in accordance with
the law prevailing at the place of work/job to the satisfaction of the GETCO, the GETCO shall have the
right to stop the execution of work/job and the period of such stoppage shall not be taken into account for
the calculation of the total period of completion of work for which the CONTRACTOR is responsible to
complete the work/job and it will be deemed that discontinuance was due to default of the
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any
such compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any other
reason, the GETCO shall have the right to recover the said amount from any amount receivable by
Seal & Signature of Bidder
GETCO or any bank guarantee deposited or anything payable whether in connection with this contract \ or
other contract by the CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of any
guidelines as per Annexure-A and terms and conditions mentioned in this Safety cum Indemnity Bond,
GETCO shall have right to terminate the contract of work issued to the CONTRACTOR .
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of agency
or outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
compensation and liability as per statutory requirement, contractor / agency is hereby agreed to pay
the penalty amount as given below:
Sr. no Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs. 5000/- + applicable taxes (if any)
2 Above 1 Lac to 10 Lacs Rs. 40,000/- + applicable taxes (if
3 10 Lacs to 100 Lacs Rs. 1,00,000/- + applicable taxes (if
4 More than 100 Lacs 1.0 % of contract value + applicable
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement of claims
under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/work is performed or as
per GETCO norms shall have the jurisdiction to decide the rights & liabilities of the parties while
adjudicating the matter of claims under this Safety Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in
Writing on the CONTRACTOR’s application after the Contractor has discharged all his obligations under
the order mentioned hereinabove and submitted a “NO DEMAND CERTIFICATE” from the GETCO under
the said order. The Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and
renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in
addition to And not by way of limitation or substitution for any other guarantee, indemnities Hereto
before given to the GETCO by the
CONTRACTOR and this Indemnity does not Revoke or limit such indemnities or guarantees. IN WITNESS
WHERE OF the Parties hereto have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal & Signature of Bidder
BANK GUARANTEE FOR SECURITY DEPOSIT/PERFORMANCE
NON JUDICIAL STAMP PAPER OF RS. 300/- (Stamp Paper Validity Six months)
Superintending Engineer BG. No.
Gujarat Energy Transmission Corporation Ltd Issue Date
Circle Office, Jambuva Expiry Date
Vadodara-390 014 Amount
BANK GUARANTEE FOR SECURITY DEPOSIT/PERFORMANCE
In consideration of the …………………….. [Insert name of the Supplier / Contractor / Agency, Address] who
have entered into a contract for works specified below :
L.O.I./L.O.A No._______________________dated_________with Gujarat Energy Transmission Corporation
Limited (herein after referred to as GETCO), We ………………………………. [Insert name and address of the
bank issuing the guarantee and address of the Registered office] (hereinafter referred to as “Guarantor Bank”)
hereby agrees unequivocally, irrevocably and unconditionally to pay to the GETCO at Circle Office, Jambuva
forthwith on demand in writing from the GETCO or any Officer authorized by it in this behalf, any amount up
to and not exceeding Rupees ………………………only [Insert the amount of the bank guarantee].
This Bank Guarantee shall be valid and binding on the Guarantor Bank up to ___________with a right to seek
encashment for a period up to 30 days from the said Date (Date of Expiry of BG) and shall in no event be
terminable by notice or any change in the constitution of the Bank or the term of the Agreement or by any
other reasons whatsoever and our liability hereunder shall not be impaired or discharged by any extension of
time or variations or alternations made, given, or agreed with or without our knowledge or consent, by or
between parties to the respective agreement.
Our liability under this Guarantee is restricted to Rupees… (Rs. …………………………….. only). Our
Guarantee shall remain in force until ………………………………………. [Insert Date of Expiry of BG]. The
GETCO shall be entitled to invoke this Guarantee any time up to thirty (30) days of the last date of the validity
of this Guarantee i.e________ [Date of Expiry of BG + 30 days] by issuance of a written demand to invoke
this guarantee.
The BANK GUARANTEE can also be presented at the ________________ [hereinafter referred to as Local
Branch at Vadodara] of the _________ (Issuing Bank of BG) for its Invocation.
The Guarantor Bank hereby expressly agrees that it shall not require any proof in addition to the written
demand from the GETCO, made in any format, raised at the above mentioned address or local branch at
Vadodara of the Guarantor Bank, in order to make the said payment to the GETCO at Vadodara. The
Guarantor Bank shall make payment hereunder on first demand without demur and without raising any
restriction or conditions and notwithstanding any objection by, …………………………… [Insert name of
Contractor/Supplier/Agency] and/or any other person.
The Guarantor Bank shall not require the GETCO to justify the invocation of this BANK GUARANTEE, nor
shall the Guarantor Bank have any recourse against the GETCO in respect of any payment made hereunder.
This BANK GUARANTEE shall be a primary obligation of the Guarantor Bank and accordingly the GETCO
shall not be obliged before enforcing this BANK GUARANTEE to take any action in any court or arbitral
proceedings against the _____( Name of party) to make any claim against or any demand
on the _____________( Name of party) or to give any notice to the ________( Name of party) or to enforce
any security held by GETCO or to exercise, levy or enforce any distress, diligence or other process against
_____________( Name of party)
This BANK GUARANTEE shall be interpreted in accordance with the laws of India and the courts at Vadodara
shall have exclusive jurisdiction.
The Guarantor Bank represents that this BANK GUARANTEE has been established in such form and with
such content that it is fully enforceable in accordance with its terms as against the Guarantor Bank in the
manner provided herein.
This BANK GUARANTEE shall not be affected in any manner by reason of merger, amalgamation,
restructuring, liquidation, winding up, dissolution or any other change in the constitution of the Guarantor Bank.
Seal & Signature of Bidder
The Guarantor Bank hereby agrees and acknowledges that the GETCO shall have a right to invoke this Bank
Guarantee either in part or in full, as it may deem fit.
Any Demand made by GETCO on the Guarantor Bank or its Local Branch at Vadodara shall be conclusive
and binding not withstanding any difference between GETCO and _______[Name of
Supplier/Contractor/Agency] or any dispute pending before any Court, Tribunal, Arbitrator or any other
Notwithstanding anything contained hereinabove, our liability under this Guarantee is restricted to Rs.
………………….. (Rupees. ………………….. only) and it shall remain in force until ………………………[Insert
date of validity of BG], with an additional claim period of thirty (30) days of the last date of the validity of this
Guarantee i.e________ [Date of Expiry of BG + 30 days]. We are liable to pay the guaranteed amount or any
part thereof under this Bank Guarantee only if the GETCO serves upon us a written claim or demand.
In witness whereof the Bank, through its authorized officer, has set its hand and stamp on this ……………..
Name and Address.
Name and Address
Signature(s) of
Constituted Attorney with POA No. and
round seal of Bank
Signature of Two Bank Officials with their sign,
sign code nos. & round seal of Bank
Note: The banks shall be the Banks recognized/notified by the Finance Department, Government of
Gujarat(GOG) from time to time.
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. A/T no. and date to be written on every page, of Bank Guarantee & its Extension.
2. If B/G amount is more than Rs.50, 000/-, kindly take sign of two bank officer with their respective
Employee code no.
3. Valid Confirmation letter of the concerned Bank in an approved format should be attached with
every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be beyond
six months, in any case.
5. Round seal and signature of two Bank officers should be affixed on every B/G paper.
Seal & Signature of Bidder
BANK GUARANTEE (Extension of Validity)
(To be executed on non-judicial stamp paper of Rs.300/-)
(Name and address of the Bank issuing the
Bank Guarantee extension.)
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Limited,
Transmission Circle office.
Jambuva, Vadodara - 390
EXTENSION OF BANK GUARANTEE NO.____________________ dtd.__________ of
The validity period of our subject Bank Guarantee issued in your favor on behalf of
M/s._________________________________________ is hereby extended from date__________ to
Notwithstanding anything mentioned herein before, our liability under this guarantee is restricted to an amount
_________________only) and it will remain in force till _____________________.( Date of validity / Expiry )
We are liable to pay the guarantee amount or any part thereof under this Bank Guarantee only if you serve
upon us a written claim or demand on or before dated ________________ ( Date of expiry of BG +30 Days
All other terms and conditions mentioned in the original Bank Guarantee will remain unaltered. This extension
forms an integral part of the above quoted original Bank Guarantee and may be kept thereto.
Date:___________ Round seal & signature of Two Bank Officers
with Sign Code No.
Seal & Signature of Bidder
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered
in an atmosphere of trust and respect between providers of goods and services and their users for the
ultimate benefit of society a the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while
execution of works in indoor and outdoor systems of GETCO, the following guideline and preventive
measures are identified.
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and The method of work required T&P and
manpower should be discussed between manpower should be discussed between
GETCO supervisor, contractor’s supervisor GETCO supervisor, contractor’s supervisor
and gang leaders. and gang leaders.
Prior to execution of work a joint survey Prior to execution of work a joint survey
must be conducted by GETCO supervisor, must be conducted by GETCO supervisor,
and contractor’s supervisor for risk and contractor’s supervisor and DISCOM line
assessment. man in order to identify the following.
Clearly identify the work location, to a.HT/LT line or tap line crossing under
distinguish between the equipment that each span of line of the work.
is dead and other equipment / part that that
may be live. b. Isolation point of each line crossing.
Disconnect the equipment from supply. c.Each line crossing & isolation point
Protect against other live parts. under each span must be discussed and noted
Take special precautions when close to in maintenance register with sketch
the bare conductors/bus bar
Following safety guidelines are Contractor’s supervisor and GETCO
mandatory for all contractors operating Supervisor must ensure all isolations
in GETCO premises for Electrical, non- physically with adequate earthing
electrical & civil works. technically prior to give clearance to gang
1) The contractors must provide advance leader for taking up job.
planning of work to concerned in-charge
of substation in writing. While execution of stringing work, the
2. Before starting any work whether switch identified line crossing must be isolated / de-
yard, “permit to allow to work” must be taken energized and written clearance should . be
from control room in-charge. obtained from concerned DISCOM supervisor.
3. Utilizing Electrical / non-electrical
equipments, safety rules must be The isolation of Tap line must be physically seen
implemented. and verified by Contractor and GETCO
4. If the work is to be carried out on Sunday
or public holiday, the necessary permission At D.O. fuse junction contractors person
must be taken in advance, requesting in should be posted to ensure that no person
writing. restore D.O. supply while work is under
5. Unwanted person including children of
labours will not be allowed at working site/ in Contractor’s supervisor must ensure that
the switchyard and in the prohibited area. concern officer take LCP for EHV line and
power line crossing.
6. Any electrical work or electrical
connections to equipment for any other
work must be carried out by certified
electrician/wiremen with adequate size of
wire through MCB as per I.E. Rule.
Seal & Signature of Bidder
- Live penal area / bus bar must be
isolated and sealed / bifurcated with red colour tape
for visible warning.
- Display Board must hang on LCP panel.
- Transformer must be switched off whenever
and wherever contractor and line workers are
not satisfied with isolation, earthing or any
equipment performance of GETCO, it will be
pointed out and work shall begin only after
resolution. Contractor shall not take up job in
absence of GETCO authorized person. All wire
temporary connection & material whenever
erection activity has any connection and
disconnection work of bus bar, string bus.
All workers / labour of contractor & supervisors All workers / labour of contractor &
must use personal protective equipment supervisors must use personal protective
(PPE) during the work like gloves, safety belt, equipment (PPE) during the work like
Safety shoes, Helmet, earthing rods, etc, duly , gloves, safety belt, Safety shoes, Helmet,
approved by GETCO. earthing rods, Live line detector etc, duly
. approved by GETCO.
The local earthing must be done at the place The local earthing must be done at the place
of work before execution of any work. of work before execution of any work.
11 kV breaker in panel must be switched off Circuit breaker opening is not an isolation
and racked out only after ensuring no voltage and isolator on either side must be opened.
in breaker and without door opening. No work during rains and cloudy weather
Transmission line activities.
1) Used of Voltage detector to ensure
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of
Local earthing of electrical equipments like
filter M/c, welding machine, testing kits etc.
Crane shall only be used for material handling
and erection. Working platform shall only be
used for work in switchyard.
Seal & Signature of Bidder
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
The Superintending .Engineer (TR)
Gujarat Energy Transmission Corporation Ltd,
Circle Office,Jambuva
We hereby acknowledge, agree and accept your A/T under reference above with terms and conditions
mentioned therein.
Designation ___________________
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S EXPERIENCE
A List of Similar jobs executed by the Contractor &Name with address of a Person whom reference can be
made, by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr. Description Value Constructi Actual Date Clie Persons Principal
No of Work Of Work on Constructio Of nt to Features
Executed Period n Completion whom
Rs. as per Period Reference
Contract for the may be
Completion made
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand , as on the date of the Submission of this tender [Tenderers
shall submit the information in the Format detailed here under]
Sr. Name of Work in hand Work Tender for Remarks
Tender Cost of Anticipated Estimated Date Stipulated
Cost Remaining Date of Cost when Date or
work Completion decis period
Contractor’s Representative legible signature: ______________________
Seal of the company Date & place: _______________________________________________
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
No. &Details Experience
of position & details of
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Capacity Numbers Make Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE
[Tenderers shall submit in the Format detailed here under]
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding in
representative of company.
visited the site.
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration Class – with valid up to
3 Partnership deed/Proprietor (Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, Statement of last three
6 Latest Solvency certificate. Rs. Lacs issued by Bank, branch
7 GST Registration No.
9 Experience certificate – As per tender
Qualification Requirement
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of opening
of the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case may be],
along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in tender
mentioned under reference along with the General/ Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender specifications
(except the deviations shown in Annexure of Technical Deviations.
3. Further, I / We also agree that additional conditions / deviations, if any, found in the tender
terms & conditions (except reference indicated under Annexure iv this tender document),
our offer shall be out rightly rejected without assigning any reason thereof.
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE
FLAG MARKING FOR IDENTIFICATION.
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
(Strike off whichever is not applicable)
This is to declare that Mr/Ms. __________________________________, employee of
GETCO at _____________________(place), is related to our
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives
employed or working with Gujarat Energy Development Agency at any of its offices or its
parent Department i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly
specified below in this sheet. If there are no deviations offered, it should be clearly
mentioned on this page.
Deviation offered to Chapter No, Clause No. of Deviation offered
the tender document
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
Firms Letter Head
CERTIFICATE – “A”
I / We__________________________________ authorised signatory of
M/s.________________________________________hereby Certify that
other firms who have submitted tenders for the same items under this
inquiry / Tender.
Seal of the Firm Signature of the Tenderer
Place: With Designation.
Seal & Signature of Bidder
ANNEXURE – XIII
UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR USED BUSINESS
DEALING / BLACKLIST
Sub: UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR USED BUSINESS
DEALING / BLACK LIST THERE OF
All bidders will have to furnish the following undertaking duly filled in, signed and stamped for
each quoted item of the tender along with technical bid.
_____________________________________Authorized signatory of
____________ and thereby certified that M/s.
and their proprietor/any partner/any director of the firm is not stop deal and /or banned for
business dealing and /or black listed by GUVNL/or their any subsidiary company viz. GSECL
/GETCO/MGVCL/PGVCL/DGVCL.
Signature of tenderer
Seal & Signature of Bidder
Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for business
dealing/blacklisting:
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties from participating in the
tendering process.
1.1.1. Firm will mean Bidder / Licensor / Tenderer / Consultant / Vendor / Contractor.
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /
blacklisting, is to protect the GUVNL and its subsidiary Companies from dealing with undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned for business dealing / blacklist
A Firm will be placed in a Stop deal / banned for business dealing / blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid, until and unless it is sought
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.4. Has refused to accept letter of Acceptance / purchase Order / Work Order after the same is issued
by the Company within the validity period and as per agreed terms and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled program.
1.2.7. Has failed to submit all the necessary tests reports / documents within time schedule / as per company’s
time limit, as mentioned in the LOI, if the letter of Acceptance (LOA) is placed subject to submission
of type reports / documents to the firm.
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace with
stipulated time frame, as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or has not returned or has short
returned or has unauthorisely disposed of materials / documents / drawings / tools or plants or
equipment supplied by the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
1.2.12. Has unauthorisely obtained official company information or copies of documents, in relation the tender
1.2.13. Has failed to follow the stipulated mode of communication, if specified by the
tendering authority / purchaser.
1.2.14. Has parted with, leaked or provided confidential / proprietary information of the Company given to the
firm only for its use (in discharge of its obligation against an order) to any third party without prior
consent of the Company,
1.2.15. Any other ground for which in opinion of the company makes it undesirable to deal with the Firm, and
1.2.16. In case the State Government directs the Company to place a firm in stop dealing / banned for business
dealing / banned for business dealing / blacklisting.
1.3. Every bidder should at the time of submission of bid, give a declaration that bidder and / or proprietor /
partner / Director of the firm has not been placed on stop dealing / banned for business dealing /
blacklisting by GUVNL and It’s any subsidiary Companies as per ANNEXURE-13
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Jambuva
Seal & Signature of Bidder
PRICE BID – JTC /25-26 / n-239
Name of Work : Work of Painting of structures and foundations of various KV Class equipment and Gantry in
Switchyard with supply of approved make Distemper paint and Anti rusting black paint at 220KV Chandrapura
S/S under Godhra AM division & 400KV Asoj S/S under Jambuva AM Division under Jambuva Circle
Sr. Item description Qty Unit Rate Amount
1 Painting of foundations with 02 coats of 4,393.00 No. 139.666
Distemper paint & structure with Anti-rusting
Black paint upto 300mm height from bottom side
each leg of various KV Class equipment as per
instruction of EIC at 400KV Asoj S/S
1.Distempering Work:
Providing two coats of Oil Bound Distemper
(O.B.D.) / Weatherproof distemper of approved
brand and white colour over RCC Foundation.
Before distempering, the surface shall be
thoroughly brushed to remove mortar droppings,
dust, dirt, and all foreign matter.Surface
preparation shall include making the surface
even, smooth, and properly sand-prepared.
2. Anti-Rusting / Anti-Corrosion Treatment:
One coat of good quality Anti-rusting / Anti-
corrosion Black Paint of standard approved make
(Asian / Berger / Nerolac) shall be applied to the
bottom part of the structure up to 300 mm height
from the finished ground level. The surface shall
be thoroughly cleaned and prepared to remove
rust, dust, grease, or any other foreign material
before applying the coat.
2 Painting of foundations with 02 coats of 1,219.00 No. 139.666
Distemper paint & structure with Anti-rusting
Black paint upto 300mm height from bottom side
each leg of various KV Class equipment as per
instruction of EIC at 220KV Chandrapura S/S
1.Distempering Work:
Providing two coats of Oil Bound Distemper
(O.B.D.) / Weatherproof distemper of approved
brand and white colour over RCC Foundation.
Before distempering, the surface shall be
thoroughly brushed to remove mortar droppings,
dust, dirt, and all foreign matter.Surface
preparation shall include making the surface
even, smooth, and properly sand-prepared.
2. Anti-Rusting / Anti-Corrosion Treatment:
One coat of good quality Anti-rusting / Anti-
corrosion Black Paint of standard approved make
(Asian / Berger / Nerolac) shall be applied to the
bottom part of the structure up to 300 mm height
from the finished ground level.The surface shall
be thoroughly cleaned and prepared to remove
rust, dust, grease, or any other foreign material
before applying the coat.
B) Percentage above / below = _____ % of Above/Below Amount Rs.
C) Total quoted price Rs. ( A+ B )
D) GST @18.00 % on C Rs.
E) Total Amount Rs.
E) Total Amount Rs.
Seal & Signature of Bidder
1. Government of India has rolled out GST from 1st July 2017, same shall be charged at actual as per GOI
notification, at the time of billing.
2. Contractor shall get registered under Welfare Cess Act before commencement of work in required head as per
nature of work.
3. You have to take Welfare registration of this site accordingly you must have to make payment for the same.
4. Welfare Cess Will be reimbursed on production of documentary evidence of payment.
Superintending Engineer
Common instruction
1 Work is to be carried out strictly as per Field Quality Plan of GETCO.
2 STORAGE CUM ERECTION INSURANCE:-
(a) Bidder shall note that storage cum erection insurance is to be taken at his own cost and amount of material
to complete subjected work is to be considered Rs. NIL
SIGNATURE OF CONTRACTOR Superintending Engineer
(With rubber stamp/seal of the company) GETCO, Jambuva.
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical bid JTC-25-26-n-239.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .