Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.2 CrAccepted-AOC | ₹7.2 Cr | 1 | Accepted-AOC Lowest quoted substantially responsive bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Quoted amount is higher than lowest quoted substantially responsive bidder |
| 3 | Rejected-Technical N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | - | - | Rejected-Technical Quoted amount is higher than lowest quoted substantially responsive bidder |
| Sl No | Description | Qty | Unit | Kishur Konwar L1 | ARKITECHNO Consultants (India) Pvt. Ltd. L2 | AM DATA LAB PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00LOT 1: INCLUDES THE DIBRUGARH, TINSUKIA & DHAKUAKHANA SUBPROJECT AREAS | ||||||
| 1.01 | Sediment monitoring: SS sampling for concentration measurement in mainstream.
4 Transects * 3 Locations *3 depths * 13 times * 3 years | 1,404 | No. of Samples | 3,000 ₹42.1 L | 10,000 ₹1.4 Cr | 2,500 ₹35.1 L |
| 1.02 | Sediment monitoring: SS sampling for concentration measurement in tributaries.
12 Transects * 3 Locations* 3 depths* 13 times * 3 years | 4,212 | No. of Samples | 3,000 ₹1.3 Cr | 10,000 ₹4.2 Cr | 2,000 ₹84.2 L |
| 1.03 | Sediment monitoring: SS sampling for particle size distribution measurement in main stream
4 Transects * 3 Locations * 3 depths *3 times * 3 years | 324 | No. of Samples | 5,000 ₹16.2 L | 10,000 ₹32.4 L | 4,000 ₹13.0 L |
| 1.04 | Sediment monitoring: SS sampling for particle size distribution measurement in tributaries.
12 Transect * 3 locations * 3 depth*3 times * 3 years | 972 | No. of Samples | 5,000 ₹48.6 L | 10,000 ₹97.2 L | 4,000 ₹38.9 L |
| 1.05 | Sediment monitoring: Bed sediment sampling for particle size distribution in main stream.
4 Transects * 3 Location* * 2 times * 3 years | 72 | No. of Samples | 5,000 ₹3.6 L | 10,000 ₹7.2 L | 4,500 ₹3.2 L |
| 1.06 | Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries.
12 Transects * 3 Location * 2 times * 3 years | 216 | No. of Samples | 5,000 ₹10.8 L | 10,000 ₹21.6 L | 4,500 ₹9.7 L |
| 1.07 | River survey: Cross-section measurements (SBES + Total Station) in mainstream
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
273 km (total length of 23 cross sections) * 3 years | 819 | Km | 5,000 ₹41.0 L | 5,000 ₹41.0 L | 15,000 ₹1.2 Cr |
| 1.08 | River survey: Cross-section measurements (SBES + Total Station) in tributaries
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
17 km (total length of 12 cross sections) * 3 years | 51 | Km | 5,000 ₹2.5 L | 5,000 ₹2.5 L | 12,000 ₹6.1 L |
| 1.09 | River survey: Near-field bathymetric/ topographic measurement
(Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years)
[42 km (length of civil works at 26 locations) + 26 km (1 km in each site)] *300 m transect @ at 50 m interval * 3 times in a year * 3 years | 3,672 | Km | 5,000 ₹1.8 Cr | 5,000 ₹1.8 Cr | 20,000 ₹7.3 Cr |
Tender Value
Refer Docs
Closing Date
10 Jun 2025, 2:00 pmClosed
Chief Executive Officer, FREMAA
4th Floor, FREMAA, Assam Water Centre, Basistha, Guwahati -29
Conducting River Surveys (Bathymetry, Flow, Sediment measurement) Lot 1 Dibrugarh and Tinsukia
2025_WREAP_44376_1
568378/298A
Limited
Miscellaneous Services
1095 days
Dibrugarh and Tinsukia
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
Conference Hall, FREMAA
13 Jan 2026
20 May 2025
10 Jun 2025
20 May 2025
10 Jun 2025
28 May 2025
20 May 2025 - 24 May 2025
23 May 2025
Amount
LOT 1: INCLUDES THE DIBRUGARH, TINSUKIA & DHAKUAKHANA SUBPROJECT AREAS
Sediment monitoring: SS sampling for concentration measurement in mainstream. 4 Transects * 3 Locations *3 depths * 13 times * 3 years
Sediment monitoring: SS sampling for concentration measurement in tributaries. 12 Transects * 3 Locations* 3 depths* 13 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in main stream 4 Transects * 3 Locations * 3 depths *3 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in tributaries. 12 Transect * 3 locations * 3 depth*3 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in main stream. 4 Transects * 3 Location* * 2 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries. 12 Transects * 3 Location * 2 times * 3 years
River survey: Cross-section measurements (SBES + Total Station) in mainstream (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 273 km (total length of 23 cross sections) * 3 years
River survey: Cross-section measurements (SBES + Total Station) in tributaries (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 17 km (total length of 12 cross sections) * 3 years
River survey: Near-field bathymetric/ topographic measurement (Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years) [42 km (length of civil works at 26 locations) + 26 km (1 km in each site)] *300 m transect @ at 50 m interval * 3 times in a year * 3 years
Hydraulics: Discharge, velocity and water level without sediment measurement in mainstream (Specification: Each cross section to be surveyed 3 times annually during June, August, and October for 3 years) 45 km (total length of 4 cross sections) *3 times a year * 3 year
Hydraulics: Discharge, velocity and water level with sediment measurement in mainstream (Specification: Each cross section to be surveyed 13 times a year for 3 years) 40 km (length of 4 cross sections) * 13 times a year * 3 years
Hydraulics: Discharge, velocity and water level with sediment measurement in tributaries (Specification: Each cross section to be surveyed 13 times a year for 3 years) 17 km (length of 12 cross sections) * 13 times a year * 3 years
Float tracking in mainstream (2 tracks) 2 tracks (50 km + 40 km) * 2 times a year * 3 years
Site (underwater work) monitoring surveys: MBES measurement (Specification: At each location MBES measurement shall cover the length of ongoing civil works; survey shall take place annually around October month for 3 years) 42 km (length of civil works at 26 locations) *0.15 km * 3 years
ARKITECHNO Consultants (India) Pvt. Ltd. (BID ID -269674)
AM DATA LAB PRIVATE LIMITED (BID ID -269654)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_70681.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid