Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance DOOR NO 57 28 10 4 2 BHAVANI GARDENS INDUSTRIAL ESTATE POST VISAKHAPATNAM 530 007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.0 LAdmitted-Finance | ₹7.0 L | L2 | Admitted-Finance |
| 3 | L3₹7.0 LAdmitted-Finance | ₹7.0 L | L3 | Admitted-Finance |
| 4 | L4₹7.1 LAdmitted-Finance D NO 32 1 211 2 BOWDARA ROAD VISAKHAPATNAM 530004 | VISAKHAPATANAM | ANDHRA PRADESH | 530004 | ₹7.1 L | L4 | Admitted-Finance |
| 5 | L5₹7.3 LAdmitted-Finance | ₹7.3 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MR ENTERPRISES L10 | S.M.Electricals L4 | JAHNAVI ASSOCIATES L2 | pavan putra enterprises L5 | PRIYA CONSTRUCTIONS L3 | RAHITHI INFRA L9 | PNR CONSTRUCTIONS L6 | B SRINIVAS L1 | ANAND ENTERPRISES AND ENGINEERS L7 | SVG SUPPLIES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, in cable tench etc. n exc 10 sqm on plan and getting out soft / loose soil complete all as directed. | 22.76 | CUM | 400 ₹9,104 | 180 ₹4,096.80 | 250 ₹5,690 | 240 ₹5,462.40 | 215 ₹4,893.40 | 380 ₹8,648.80 | 320 ₹7,283.20 | 200 ₹4,552 | 280 ₹6,372.80 | 210 ₹4,779.60 |
| 2.00 | Returning, filling in incl spreading, leveling, watering and well ramming in layers n exc 25 cm complete all as specified & directed. | 12.83 | CUM | 220 ₹2,822.60 | 63 ₹808.29 | 100 ₹1,283 | 81 ₹1,039.23 | 90 ₹1,154.70 | 150 ₹1,924.50 | 65 ₹833.95 | 90 ₹1,154.70 | 110 ₹1,411.30 | 110 ₹1,411.30 |
| 3.00 | Removing excavated material to a distance n exc 50 mtr and depositing where directed at a level n exc 1.50 mtr above the starting point complete all as specified & directed. | 9.93 | CUM | 300 ₹2,979 | 63 ₹625.59 | 150 ₹1,489.50 | 200 ₹1,986 | 95 ₹943.35 | 285 ₹2,830.05 | 120 ₹1,191.60 | 200 ₹1,986 | 220 ₹2,184.60 | 150 ₹1,489.50 |
| 4.00 | M & L for sand cushioning under trenches as in cable protection complete all as specified and directe.
(Note: Punned thickness shall measured for payment purpose) | 8.51 | CUM | 2,000 ₹17,020 | 799 ₹6,799.49 | 1,000 ₹8,510 | 1,234 ₹10,501.34 | 480 ₹4,084.80 | 1,600 ₹13,616 | 850 ₹7,233.50 | 800 ₹6,808 | 1,550 ₹13,190.50 | 1,020 ₹8,680.20 |
| 5.00 | Supplying and laying bricks common burnt clay building bricks sub class 'B' bricks for cable protection complete all as specified & directed. | 1.08 | PER 1000 NOS | 7,500 ₹8,100 | 5,400 ₹5,832 | 8,000 ₹8,640 | 5,625 ₹6,075 | 9,000 ₹9,720 | 7,771 ₹8,392.68 | 10,500 ₹11,340 | 8,500 ₹9,180 | 5,551 ₹5,995.08 | 9,000 ₹9,720 |
| 6.00 | S&F steel tubular swaged poles complete with cast iron base plate, finial taper plug, bolts, nuts & screws as specified type 410 SP-31 (overall 9.00 metres long) conforming to IS IS 2713 (Parts 1 to 3) 1980 duly painted with two coats of aluminium paint externally above planting depth and two coats of bituminous paint internally and externally upto planting depth including taking down old unserviceable pole complete all as specified and directed.
(Note: Necessary earthwork, PCC work etc necessary for fixing of pole shall be measured and paid separately in relevant item.) | 4 | EACH | 23,000 ₹92,000 | 17,550 ₹70,200 | 20,000 ₹80,000 | 9,688 ₹38,752 | 18,980 ₹75,920 | 20,000 ₹80,000 | 26,575 ₹1.1 L | 14,500 ₹58,000 | 14,300 ₹57,200 | 20,000 ₹80,000 |
| 7.00 | M&L for PCC 1:2:4 type B1 (Using 20 mm graded stone aggregate) as in coping of pole complete all as specified and directed. | 0.36 | CUM | 8,000 ₹2,880 | 6,800 ₹2,448 | 6,500 ₹2,340 | 201 ₹72.36 | 5,000 ₹1,800 | 8,000 ₹2,880 | 7,000 ₹2,520 | 5,000 ₹1,800 | 7,600 ₹2,736 | 5,500 ₹1,980 |
| 8.00 | M&L for PCC 1:2:4 type B2 (Using 40 mm graded stone aggregate) as in foundation of pole or mass concrete complete all as specified and directed. | 1.5 | CUM | 6,000 ₹9,000 | 5,400 ₹8,100 | 6,500 ₹9,750 | 5,787 ₹8,680.50 | 6,200 ₹9,300 | 6,200 ₹9,300 | 7,000 ₹10,500 | 5,000 ₹7,500 | 5,200 ₹7,800 | 6,500 ₹9,750 |
| 9.00 | M&L for PCC 1:3:6 type C2 (Using 40 mm graded stone aggregate) as in foundation of pole or mass concrete complete all as specified and directed. | 0.14 | CUM | 5,500 ₹770 | 4,860 ₹680.40 | 6,500 ₹910 | 1,026 ₹143.64 | 7,000 ₹980 | 5,200 ₹728 | 6,000 ₹840 | 5,000 ₹700 | 4,200 ₹588 | 4,500 ₹630 |
| 10.00 | Supply, laying and testing of XLPE Insulated screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 10.00 sq mm 4 core shall be laid under trench or pipe or loop or shall be fixed on wall / pole including taking out old unserviceable cable complete all as specified and directed.
(Note: Earthwork , excavation, sand coushioning, GI pipe etc. shall be measured and paid separately uinder relevant item) | 50 | RM | 250 ₹12,500 | 216 ₹10,800 | 310 ₹15,500 | 437 ₹21,850 | 216 ₹10,800 | 185 ₹9,250 | 145 ₹7,250 | 120 ₹6,000 | 260 ₹13,000 | 182 ₹9,100 |
Updated dates
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
18 May 2026, 6:00 pmClosed
GE (I) (CG) Vizag
GE (I) (CG) Vizag Military Engineer Services CGWO Building Co Fleet Mail Office Visakhapatnam 530 014
REPAIR REPLACEMENT OF STREET LIGHT HIGH MAST LIGHT SECURITY LIGHT AND CONNECTED ITEMS AT ICGS MALKAPURAM JETTY AT VISAKHAPATNAM UNDER GE (I) (CG) VIZAG
2026_MES_760968_1
GE(I)CG/VIZ/TOKEN/29 OF 2026-27
Open Tender
Civil Works
180 days
Visakhapatnam
As per NIT
8 documents required · 8 mandatory
₹500
Yes
GE (I) (CG) Vizag
₹20,000
22 May 2026
20 Apr 2026
20 May 2026
20 Apr 2026
18 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, in cable tench etc. n exc 10 sqm on plan and getting out soft / loose soil complete all as directed. | - | CUM | - | - |
| 2 | Returning, filling in incl spreading, leveling, watering and well ramming in layers n exc 25 cm complete all as specified & directed. | - | CUM | - | - |
| 3 | Removing excavated material to a distance n exc 50 mtr and depositing where directed at a level n exc 1.50 mtr above the starting point complete all as specified & directed. | - | CUM | - | - |
| 4 | M & L for sand cushioning under trenches as in cable protection complete all as specified and directe.
(Note: Punned thickness shall measured for payment purpose) | - | CUM | - | - |
| 5 | Supplying and laying bricks common burnt clay building bricks sub class 'B' bricks for cable protection complete all as specified & directed. | - | PER 1000 NOS | - | - |
| 6 | S&F steel tubular swaged poles complete with cast iron base plate, finial taper plug, bolts, nuts & screws as specified type 410 SP-31 (overall 9.00 metres long) conforming to IS IS 2713 (Parts 1 to 3) 1980 duly painted with two coats of aluminium paint externally above planting depth and two coats of bituminous paint internally and externally upto planting depth including taking down old unserviceable pole complete all as specified and directed.
(Note: Necessary earthwork, PCC work etc necessary for fixing of pole shall be measured and paid separately in relevant item.) | - | EACH | - | - |
| 7 | M&L for PCC 1:2:4 type B1 (Using 20 mm graded stone aggregate) as in coping of pole complete all as specified and directed. | - | CUM | - | - |
| 8 | M&L for PCC 1:2:4 type B2 (Using 40 mm graded stone aggregate) as in foundation of pole or mass concrete complete all as specified and directed. | - | CUM | - | - |
| 9 | M&L for PCC 1:3:6 type C2 (Using 40 mm graded stone aggregate) as in foundation of pole or mass concrete complete all as specified and directed. | - | CUM | - | - |
| 10 | Supply, laying and testing of XLPE Insulated screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 10.00 sq mm 4 core shall be laid under trench or pipe or loop or shall be fixed on wall / pole including taking out old unserviceable cable complete all as specified and directed.
(Note: Earthwork , excavation, sand coushioning, GI pipe etc. shall be measured and paid separately uinder relevant item) | - | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
8498Tender29.pdf
Tender Documents • 1.60 MB
BOQ_852389.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid