Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹78.6 L
EMD Value
₹78,643
Closing Date
23 Nov 2026, 6:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer, Public Health Circle, GWSSB, Mehsana
Providing, Installing & Commissioning Chlorination plant and Construction of Chlorine room at Different Sub H/W in Visnagar Group. Ta. Visnagar Dist. Mehsana under M&R to Visnagar RWSS.
361830
10 of 2026-27
Open
Civil Works - Water Works
Works
Mehsana
6 documents required · 6 mandatory
₹2,400
Executive Engineer, Public Health Works Division, GWSSB, Mehsana
₹78,643
3 Nov 2026
3 Nov 2026
3 Nov 2026
23 Nov 2026
3 Nov 2026
180 days
Estimated Cost: Rs.
Executive Engineer
Public Health Dharoi Project Division
Gujarat Water Supply & Sewerage Board
VOLUME-III PRICE BID
VOLUME – III – PRICE BID
2.0 BID FORM (WITH PRICE)
4.0 SUMMRY (SCHEDULE-B)
6.0 BREAK UP FOR INTERIM PAYMENTS
SUMMARY OF PRICE - Grand Summary of Schedules (Covering Schedule)
SCHEDULE-A - NIL
SCHEDULE-B - Providing, Installing & Commissioning Chlorination plant
and Construction of Chlorine room at Different Sub H/W
in Visnagar Group. Ta. Visnagar Dist. Mehsana under
M&R to Visnagar RWSS.
SCHEDULE-C - NIL
SCHEDULE-D - PREAMBLE
- BREAK UP FOR INTERIM PAYMENTS
VOLUME-III PRICE BID
Name of Work: Providing, Installing & Commissioning Chlorination plant and
Construction of Chlorine room at Different Sub H/W in Visnagar Group. Ta. Visnagar
Dist. Mehsana under M&R to Visnagar RWSS.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-procure
which is called Schedule-B. Rates and prices received in any other formats will be
rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the bidder‟s
proposal, without giving any reasons whatsoever and the bidder shall not be
permitted to withdraw his bid on this account.
supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as
called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and evaluation.
(7) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder
shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to Schedule-C/5
separately for Schedule-C. The total shall be in line to the price quoted in Schedule-
C. The total shall be carried forward to Schedule-B for comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified payment shall be
on unit rate basis and unit variation in quantity will be paid with pro rata basis.
(9) Each item is to be individually priced online and the amounts shall be added up to
shall be left blank except where the item description requires the item to be priced
on "as applicable” basis. The item shall not be priced if it is “not applicable” to the
bidder‟s design, in which case the bidder shall add the words “NOT APPLICABLE”. The
wording in the item description is for subject matter guidance only; clause references
are indicative only and all other relevant clauses shall also be referred to. The prices
shall allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of the bid
document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for
by the Employer when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets No extra payment shall be given for any
item which is required to complete and perform the project.
pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor. The
VOLUME-III PRICE BID
any will be considered for financial evaluation of the bid.
(12) Schedule „D gives the basis of interim payment for construction of works.
(13) The bidder shall be deemed to have allowed in his price for provision, maintenance
and final removal of all temporary works of whatsoever nature required for
construction including temporary bunds, diverting water, pumping, de-watering etc.
for the proper execution of works. The rates shall also be deemed to include any
works and setting out that may be required to be carried out for laying out of all the
works involved.
(14) Prices shall be filled online only.
the Specifications and other sections of these bid documents and these documents
are to be taken as mutually explanatory of one another.
(16) The bidder shall interpret the data furnished and carry out any additional survey
work, or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for testing.
(18) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at
his own cost. These accesses will be used by the other contractors working for
prices shall include all the equipments / materials / accessories and services required
(20) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(24) The rates to be quoted shall be exclusive of GST but inclusive of all other taxes. Duties
which shall not be paid extra. While GST will be paid for admissible part of actual work
done at the approved tender rates and tender condition of price variation. GST shall be
paid as per prevailing rates at the time of payment. The TDS shall be deducted at source
as per provision of IT rules and GWSSB policy.
(25) The rates should be quoted exclusive of GST but inclusive of all other taxes as per by the
Contractor must be exclusive of GST but inclusive of all other taxes as per Volume-I (B)
General Condition of Contract, Clouse No.47
(26) The Ministry of Finance and Company Affairs, Department of Revenue, Government of
India has issued a notification No. 6/2007-Central Excise Circular No. 6/2007, dated 1th
March 2007 regarding the Central Excise Duty Exemption. By this notification, the
notification 659/50/2002 dated 6th September, 2002 has been amended and the earlier
notification 26/2009 dated 4th December, 2009 has been amended and the Items of
materials, instruments, apparatus and appliance, ancillary equipments and their
components/parts, etc. for setting up of Water Treatment Plants and the Pipes needed for
delivery of water from its source to the Plant and from there to the Storage facility (as
mentioned in notification No.6/2007) are exempted from Central Excise Duty subject to the
Certification by the Collector/ District Magistrate/ Deputy Commissioner of the District,
regarding its use on such Projects. Necessary Project Authority Certificate shall be made
VOLUME-III PRICE BID
available to the Contractor, as per the prevailing rules, to facilitate him to avail the benefit in
terms of Exemption of Central Excise. ( Circulars attached herewith )
(27) The Bidders shall have to quote the rates in this tender keeping in view of the Probable
rebate available to them as per the above Circulars of Government of India. The liability of
the Department is limited to issuing the Project Authority Certificate to the Contractor and
the Department does not take any responsibility whether the Agency gets the Excise
Exemption or not. The Complete responsibility rests with the Contractor/Agency only.
(28) The process requires that the bidder shall quote his price for the work components
and fix during the entire period of performance of the contract except price variation
allowed for supply of MS pipe as per Volume-IB Clause No. 59, General Conditions of
(29) Payment shall be made for the components for which lump sump prices are quoted,
as per the schedule of payment. Total cost will be worked out on the basis of work
done of individual items and rates quoted against those particular items only.
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada
Water Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)-
M.I. Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered
from the running bills of the work from time to time and remaining amount if any
shall be recovered from the final bill before releasing the security deposit of the
work. The contractor shall furnish the statement showing the quantity of quarried
materials / minerals from whom purchased (with full address of the seller) and copies
of the bills for purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty payment
to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non-compliance entire responsibility shall be
rest with the agency and required amount shall be recovered from any due amount of
(32) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(33) Payment should be made after fund released by GWSSB.
(34) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the state of
Gujarat. For arriving at the difference in procurement prices due to introduction of
GST it will be open for the Board to ask for original invoices, lorry receipt, weigh
bridge slips, payment details and such other documents as may be required for the
The claim of contractor regarding GST shall have to be backed by documentary
evidence substantiating the actual payment of tax duly certified by the competent
tax authority. The final decision regarding the quantum of claim amount to be
recovered or reimbursed shall be of the competent authority of the GWSSB and shall
be binding on the contractor.
Signature of contractor Executive Engineer
P. H.Dharoi Project Dn.,
G.W.S.S.B, Mehsana
VOLUME-III PRICE BID
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH DHAROI PROJECT DIVISION,
SUB: Providing, Installing & Commissioning Chlorination plant and Construction of
Chlorine room at Different Sub H/W in Visnagar Group. Ta. Visnagar Dist.
Mehsana under M&R to Visnagar RWSS.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said
works for 5 years from the date of commissioning including defects liability period
as given in Conditions of Contract and in conformity with the drawings, conditions
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum
fixed price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained
in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer‟s representative or
any other person/Agency by the Employer to perform on his behalf for
carrying out the inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and
approved by the Engineer‟s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to
take any action including termination of Contract and impose at his absolute
discretion any penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
VOLUME-III PRICE BID
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms
and of value specified in the Clause 1 of Volume-IB, “General Conditions of
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages
likely to be suffered by you in the event of the work not being completed by us in
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
VOLUME-III PRICE BID
Name of Work: Providing, Installing & Commissioning Chlorination plant and
Construction of Chlorine room at Different Sub H/W in Visnagar
Group. Ta. Visnagar Dist. Mehsana under M&R to Visnagar RWSS.
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined
in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be charged.
Rate at which the material
Sr. will be charged to the Place of
Particular Qty.
No. contractor Delivery
The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by
the Engineer in Charge at the time of issue tender.
The contractor while submitting the tender shall provide his own arrangement at his own
2 cost for loading, unloading, and transporting safety to the site of work the cement
stipulated in Schedule-A
Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
All the materials required for the items other than labour in Schedule-A but available with
4 the dept. will be issued on request to the contractor. (for use in this contract only) at
prevailing market rates or departmental issue rates whichever is higher.
All the surplus materials supplied by the deptt. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
The materials mentioned in schedule-A shall have to be checked for their correctness and
6 soundness by the contractor before taking the delivery of the materials from the
7 Necessary cement will be purchased by the agency at their own cost from open market.
The persons of firm submitting the Tender should see that rates in the above schedule are
8 filled up by the Executive Engineer, on the issue of form prior to the submission of the
9 Carting of above materials should be done by contractor at his own cost.
Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Those works will be executed which are found necessary at the time of execution,
11 contractor will not be entitle for any claim for saving in any items as per site condition.
VOLUME-III PRICE BID
The sub contract, if any given by the contractor would not create any right against the
13 The Amount Recoverable from the contractor by the Gujarat water supply and sewerage
board on any account shall be liable to be recovered from the amount payable to the
contractor / suppliers.
14 After passing the bill fund shall be demanded to higher authority payment shall be made
after getting fund from higher authority.
Signature of contractor Executive Engineer
P. H.Dharoi Project Dn.,
G.W.S.S.B, Mehsana
VOLUME-III PRICE BID
Name of work:-Providing, Installing & Commissioning Chlorination plant and Construction of Chlorine room
at Different Sub H/W in Visnagar Group. Ta. Visnagar Dist. Mehsana under M&R to Visnagar RWSS.
Decription Qty Unit Amount
No. In figure In Words
1 Providing, Supplying & installing Vacuum Control Direct wall 10.00 No. 131917.00 Rupees One Lac Thirty
mounted gas chlorinator including necessary fittings, One Thousand Nine
installation and commissioning of plant incl. Clamp, copper Hundred Seventeen
pipe, ferule filter & control valve with injector, only
B. 2 Kg. Capacity Gunjha, Gothva, Kamana, Thumthal &
2 Providing & supplying digital chlorine detector monitor 5.00 No. 62551.00 Rupees Sixty Two
meter - 0 to 20 ppm capacity Thousand Five Hundred
3 Providing & supplying safety kit for 100 Kg cap. Toner. 3.00 No. 40418.00 Rupees Forty Thousand
(Gothva, Thumthal & Rajgadh HW) Four Hundred Eighteen
3.1 Providing & supplying safety kit for 900 Kg cap. Toner. 2.00 No. 46191.00 Rupees Forty Six
(Gunjha, & Kamana HW) Thousand One Hundred
Ninety One only
4 Laboratory Instruments 10.00 No. 1443.00 Rupees One Thousand
c) Chloroscope 0.5 ppm including testing materials. Four Hundred Forty
5 Providing & supplying air breathing apparatus as per 5.00 No. 41380.00 Rupees Forty One
1S:10245 Part-ll. With 45 minutes duration cylinder Thousand Three
Hundred Eighty only
6 Providing laying and jointing in true line and level 25mm dia. 400.00 Rmt. 91.84 Rupees Ninety One &
U.P.V.C. Pipe ( SCH- 40) for cold water including fittings as Paise Eighty Four only
approved by Engineer In Charge. Pipe shall be fixed on the
wall with the help of clamp at every two metre C/C or shall
be concealed as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all materials.
VOLUME-III PRICE BID
7 Providing and fixing Gun metal check or non-return full way 10.00 No. 420.63 Rupees Four Hundred
wheel valve. (C) 25mm dia. Twenty & Paise Sixty
8 Supply of Chlorine Cylinders (Empty) 4.00 No. 62551.00 Rupees Sixty Two
Providing and supplying Chlorine gas cylinder empty of Thousand Five Hundred
required capacity with necessary explosive certificates Fifty One only
including all taxes a) Chlorine cylinders 900 kg (tonner) For
Gunjha & Kamana SHW
8.1 b) Chlorine cylinders 100 kg. For Gothva, Thumthal & 6.00 No. 26945.00 Rupees Twenty Six
Rajgadh SHW Thousand Nine
Hundred Forty Five only
9 Designing (aesthetically) and constructing R.C.C frame 128.00 Sq.Mt. 15301.72 Rupees Fifteen
structure of Pump room/ Chlorine Room with positive Thousand Three
suction / Negative suction With Gantry structure (Min. Hundred One & Paise
Height 4.5 M) Upto 6.00 M (Plinth Level to Top slab Beam Seventy Two only
bottom) For Gunjha, Kamana, Gothva & Thumthal HW
9.1 For Rajgadh HW 24.00 Sq.Mt. 15301.72 Rupees Fifteen
Hundred One & Paise
Seventy Two only
10 Supplying & erecting approved make self- priming domestic 5.00 No. 7679.03 Rupees Seven
monoblock water pump with 1 H.P motor, suitable for Thousand Six Hundred
operation on 230 volts, 50c/s. AC supply with metallic flange, Seventy Nine & Paise
and M.S. impeller delivery and following discharge Three only
11 Single Girder EOT Crane 5.00 No. 513450.00 Rupees Five Lac
Supply, installation, testing & commissioning single girder Thirteen Thousand Four
type fully electrically operated EOT crane with electrically Hundred Fifty only
operated hoist, class II duty, geared travelling trolley with
seven meter lift complete with long travel rail track (40 mm
sq. bar), moving or cross girder, all three motions electrically
operated by suitable rating motor IP 54, control panel &
down pendant control block, brake, safety device, cables
form motor to starter panel & other required accessories &
tested as per IS Specifications. a) Capacity :3 T Span:0-6 M.
Long Travel: 12M. Lift: 6-10M.
VOLUME-III PRICE BID
12 Demolition including stacking of serviceable materials and 24.00 Cum 1081.83 Rupees One Thousand
disposal of unserviceable materials with all lead and lift (i) Eighty One & Paise
RCC work (For Electric & Pipe lining) Eighty Three only
13 Providing and casting in situ C.C. in grade M-15 Proportions 24.00 Cum 4906.00 Rupees Four Thousand
as per mix design or as per table-9 of IS456 2000 in masses Nine Hundred Six only
by weight batching) using granite, quartzite trap metal of size
6 mm to 20 mm for RCC work, including scaffolding, centring,
form work, needle vibrated consolidation, curing comp. up to
6 meter depth or height (excluding cost of reinforcement and
neat finishing) with cantering and shuttering etc. comp. for
other than water retaining. Footing for column or foundation
(with form work)
14 Supplying & erecting approved make low noise decorative 15.00 No. 1703.87 Rupees One Thousand
exhaust fan having square frame ABS body with inbuilt Seven Hundred Three &
lowers & square frame. a) 200mm with 1350RPM Cat.II Paise Eighty Seven only
15 Supply, laying, testing & commissioning 1.1 kV grade, XLPE 400.00 Rmt. 78.00 Rupees Seventy Eight
insulated, stranded Aluminium conductor, galvanised steel only
flat strip / round wire armoured, extruded PVC type ST2
sheathed, heavy duty cable (to be laid on wall surface with
necessary clamps / in existing cable trench / cable trays /
conduit / pipe sleeves at road crossing or floor as per site
requirement) conforming to IS: 7098 (Part-1) & IEC:
(Part-1) of following sizes: C. 4 Core x 6.0 Sqmm
16 Cautionary Warning Sign :-Providing and fixing sing boards 6.00 NO. 3379.54 Rupees Three Thousand
made out of 2mm aluminium sheet; size 90 x 90 x 90 cms. Three Hundred Seventy
Equilateral triangle as per design of IRC-67-1977. Pre-treated Nine & Paise Fifty Four
with hospheting process & acid etching; coated with one only
coat of epoxy primer and two coats of best quality epoxy
paint ; reflectorized with retro reflective sheeting as per
latest M.O.S.T. Specifications; 3.1m long stand post and
frame fabricated from suitable size iron angle of 35 x 35 x
3mm, 75 x 75 x 6mm as required; painted with equality
epoxy coatings in black and white bends. The details of
symbol foreach board shall be as per the instruction of
engineer in charge. The fixing at site shall be in 1:2:4 CC block
VOLUME-III PRICE BID
of size 45 x 45 x 60 Cms. for each leg. Including excavation,
curing etc. Complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)
17 Providing and fixing heavy-duty (5 mm to 8 mm thick) 240.00 Sqft 54.16 Rupees Fifty Four &
laminated vinyl print mounted on rigid hard board/PVC foam Paise Sixteen only
board including high-resolution printing, lamination, edge
finishing and proper installation, complete as directed.
18 Painting Numbers or name on Acrylic plate as Directed by 15.00 No. 450.00 Rupees Four Hundred
Engineer in Charge. Fifty only
19 Providing and supplying caustic soda flakes to different 3450.00 KG 50.00 Rupees Fifty only
location as directed by Engineer in charge.
Total of Schedule B
I/We am /are withing to carry out the work at % above / below (Should be written in figures and words) Above/
below the tendered rate mentioned and above amount of my tender as under
Estimated amount put to Estimated amount put to
Signature of contractor Executive Engineer
Public Health Dharoi Proj. Division
VOLUME-III PRICE BID
OPERATION & MAINTENANCE FOR Augmentation of Regional Water Supply scheme
based on Siddhi Sarovar at Patan (Based on NMC Khorsam)
The works of this schedule comprises of the supply of all spare parts as required
including the supply of all labour, materials, consumables (except electrical power),
equipment, tools and tackles and comprehensive operations and maintenance for
“Working survey, soil investigation, Design, Build and Operate contract for Providing,
Supplying, Lowering, Laying & Jointing Rising/Gravity main DI/PVC Pipelines,
Designing (aesthetically) & constructing RCC U/G Sumps, RCC ESR, Pump Rooms, Staff
Quarters, Compound Walls, RCC roads, chlorination arrangements, including SITC of
HSCF/VT Pumping Machinery with associated Electro-Mechanical works for
Augmentation of Regional Water Supply scheme based on Siddhi Sarovar at Patan
(Based on NMC Khorsam) Taluka : Patan, Siddhapur, Harij, Sarasvati & Unjha Dist :
Patan/Mehsana including Designing & Construction of R.C.C U/G Sumps at Village
Level & Connecting Pipeline with Pumping Machinery with Operation & Preventive
maintenance of all type existing and new Structures for 60 months” O&M period
during the 1st year from the date of successful commissioning as shown in table O & M-1
It.No. Description Quoted Price (Rs)
1 Establishment
2 M & R Charges (Civil & Mechanical)
Chemical Charges (Chlorine/Alum/PAC-10%/PAC-
4 Chemical Analysis Charges
Insurance Charges (Establishment+ Structure
(Civil & Mechanical)
6 Cleaning of Storage
7 Vehicle Charges
Total price for O & M for the First Year
The cost of damages to the system shall not be included in the Schedule-C/1 as it is
already covered under „Defects Liability Period”.
VOLUME-III PRICE BID
1. As mentioned in the Conditions of contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable only
for the assessment of value of work done for inclusion in any interim certificate for
part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
4. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the component
as related to the total costs of the concerned item as whole. A head titled (any other
item(s)) is included in each breakdown of schedule and the tenderer shall at the time
of tendering indicate any additional items which he considers necessary but cannot
be covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer‟s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by both
Signature of contractor Executive Engineer
Public Health Dharoi Project Division
VOLUME-III PRICE BID
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Percentage Payment to
Item Description of Items
1 PUMP HOUSE / CHLORINE ROOM (For Item
a On approval of Designs 2.0 % of Quoted rate
b On completion of Excavation & base slab 18.0 % of Quoted rate
c On completion of vertical wall up to plinth
20.0 % of Quoted rate
(incl. screen chamber
d Full supporting structure incl. ring beam and top
15.0 % of Quoted rate
e On completion of pump house/ Chlorine Room
10.0 % of Quoted rate
incl. fixing doors windows
f Plastering inside & outside with paint etc.
10.0 % of Quoted rate
(completed with all respects)
g Painting of letters, MS ladder pipe, railing,
lighting arrestor and all miscellaneous items 15 % of Quoted rate
such as paints etc. (completed with all respects)
h After Completion 10 % of Quoted rate
2 All Electro-Mechanical Works and
Instrumentation (For Item No. 11 )
a On Supply of equipment at site 75% of Quoted rate
b After Installation / Erection of Equipment 15% of Quoted rate
c After Successful Testing & Commissioning of
Equipment (On Completion of Trial Run as 10% of Quoted rate
Signature of contractor Executive Engineer
Public Health Dharoi Project Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular 1_3-A Certificat Paripatra.pdf.pdf
pdf • 1.11 MB
Circular 1_Badhakam Shramyogi.PDF
pdf • 0.74 MB
Circular 1_DMO_2631_21-Apr-2023_872.pdf
pdf • 0.24 MB
Circular 1_Insaurance1.jpg
jpg • 1.82 MB
Circular 1_Insaurance2.jpg
jpg • 1.98 MB
Circular 1_Labour Fee Circular.pdf
pdf • 0.09 MB
Circular 1_Mat.Test.GR.pdf
pdf • 0.13 MB
Circular 1_SIGN BOARD.pdf
pdf • 0.30 MB
Circular 1_SPECIAL CLAUSE.pdf
pdf • 0.67 MB
Circular 2_DTP circular p-1.pdf
pdf • 2.15 MB
Circular 2_DTP circular p-2.pdf 2.pdf
pdf • 1.41 MB
Circular 2_DTP circularp-3.pdf
pdf • 1.39 MB
Circular 2_DTP circularp-4.pdf
pdf • 2.43 MB
Circular 3_DTP circular p-5.pdf
pdf • 2.82 MB
Circular 3_DTP circular p-6.pdf
pdf • 2.23 MB
Circular 3_DTP circular p-7.pdf
pdf • 2.55 MB
gst latest.pdf
DMO_2941_01-Apr-2026_744.pdf
Ann 4 Royalty GR .pdf
Ann 3 shramyogi GR_compressed.pdf
Annexure 7 Min labour wages.pdf
Annexure 2 Purchase Policy.pdf
Ann 5 DOC 20230131 WA0039 240625 162832.pdf
Volume 2DR 1 R and B Booklet.pdf
F 01 VOL 1A Technical Bid Pg 1 to 117.pdf
F 02 VOL 1B 1 GCC pg 118 to 182.pdf
F 03 VOL 2A Tech Spec General pg 183 to 309.pdf
F 04 VOL 2B Tech Specification Detail pg 310 to 360.pdf
F 05 VOL 2D Data Sheet pg 361 to 366.pdf
F 06 VOL 3 Price bid standard pg 367 to 382.pdf
F 07 Drawing.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .