Loading…
Loading…
Tender ID
Tender Value
₹13.5 L
EMD Value
₹27,070
Closing Date
25 Mar 2026, 3:00 pmClosed
EE Div-III,AMC
O/o the EE Div-III,AMC
Construction of CC road drain from H.O Prabhat Das to H.O Sankar Das at Ashram para under ward No 37 AMC.
2026_SAMC_71734_1
99/Div-III/AMC/2025-26
Open Tender
Civil Works
Percentage
Under AMC Div-III.
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹27,070
Yes
19 Mar 2026
19 Mar 2026
26 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavation)/manual means in foundation frenches or drains not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead of 50 m All kind of soi | 0.4 | cum | 1 | ₹0.4 |
| 2 | Supplying and filling in plinth under floor foundation etc with snd fine from local quarry with all lift includingspreading in horizontal layer watering gradng to required slop ramming consolidating and compacting each layer by usingplate compactor or by any suitable method complete. | - | cum | 1 | - |
| 3 | Providing and laying dry flat brick flooring in required pattern completed. | 1 | sqm | - | - |
| 4 | Providing and laying in position cement concrete of specified grde excluding the cost of centering and shuttering All work upto plinth level 1:3:6( 1cement:3 fine sand:6 geded well burnt brick aggregate 20 mm niminal size) | 0.8 | cum | - | - |
| 5 | First class brick work foundation and pinth including cost of all materials as required complete In cement mortr 1:4(1cement:4 fine sand) | 0.2 | cum | - | - |
| 6 | Half brick first class brick work foundation and pinth including cost of all materials as required complete In cement mortr 1:4(1cement:4 fine sand | - | sqm | 1 | - |
| 712 mm cement plaster of mix In cement mortar 1:4(1cement:4 fine sand) including Neat cement punning) | |||||
| 8 | Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement-1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone
aggregate 20 mm nominal size) | 0.8 | cum | 1 | ₹0.8 |
| 9 | Reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or
more | 0.4 | kg | - | - |
| 10Centering shuttering including struttings, propping etc.and removal of form work for:Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_73003.xls
BOQ • 0.28 MB
DNIT.pdf
Tender Documents • 4.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .