Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC BPC PARA KHOWAI KHOWAI TRIPURA | KHOWAI | KHOWAI | TRIPURA | ₹18.3 L | L1 | Accepted-AOC Responsive |
| 2 | L2₹18.9 L+₹57,516.96 (3.14%)Rejected-AOC | ₹18.9 L+₹57,516.96 (3.14%) | L2 | Rejected-AOC Responsive |
| 3 | L3₹19.0 L+₹76,011.16 (4.16%)Rejected-AOC | ₹19.0 L+₹76,011.16 (4.16%) | L3 | Rejected-AOC Responsive |
Tender Value
₹18.5 L
EMD Value
₹36,989
Closing Date
12 Dec 2025, 3:00 pmClosed
The Dy Chief Executive Officer KMC Khowai
O/o the Dy Chief Executive Officer KMC Khowai
Works
2025_Urban_68055_1
24/KMC/KH/DNIT/2025-26
Open Tender
Civil Works
Percentage
30 days
khowai
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹36,989
21 May 2026
6 Dec 2025
12 Dec 2025
6 Dec 2025
12 Dec 2025
7 Dec 2025
6 Dec 2025 - 7 Dec 2025
2.8 Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer |with ½ tonne roller or wooden|or steel rammers, and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m: -All kinds of soil
2.19 Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including |spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and |compacting each layer by using plate compactor or by any suitable method complete.
4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: 4.1.5 1:3:6( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size)
5.19 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.19.1 Thermo mechanically treated bars of grade fe 500D
5.8 Centering shuttering including struttings, propping etc. and removal of form work for: 5.8.3 Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply
6.1 First class brick work in foundation and plinth including cost of all materials as required complete: In cement mortar 1:6 (1 cement: 6 fine sand ).
12.1 12 mm cement plaster of mix 308.00 12.1.2 Cement mortar 1:4 (1 cement :4 fine sand)
12.10 Neat cement punning
5.3 Reinforced cement concrete work in beams,suspended floors, roofs having slope upto 15°landings, balconies, shelves, chajas, lintels, bands,plain window sills, staircases and spiral stair casesupto floor five level excluding the cost of centring, shuttering, |finishing and reinforcement 5.3.1 1:1:2 ( 1 Cement: 1 fine sand:2 graded)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_69249.xls
BOQ • 0.29 MB
DNIT24.pdf
Tender Documents • 4.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .